You are on page 1of 4

Indicators Current Reality Gap What to do

1. Preparation of 10  The plan is to be  Inactive some  Reorganization of the


years 5 solid waste completed for members of NSWM Board by way
management plan approval by the the TWG of of on E.O from the
MSWM the MSWM Municipal mayor
Commission after Boar  Request for coaching
passing through  Lack of Data from EMB-DENR for
the SB the finalization of the
plan
2. Existence of the  Some are inactive  Lack of  IEC/Retooling/
barangay SWM while others are to barangay Orientation on the
committees be reorganized policies to creation and function
mobilize the of the BSWMC
committee
3. Presence of MRF  Some barangays  Inappropriati  Essence of official
are still have to on exclusion reminder to all
establish their of MRF with punong barangay for
respective MRF other the inclusion in the
environmenta budget proposal
l concern in  Periodic monitoring
the proposed as to compliance
budget
4. Massive IEC on proper  Lack of full  Less number  Issuance of official
SWM practices to all acknowledge on of reminders to punong
waste generators by the practice of participants barangay
sector, by way SWM as well as during the  Creation of basura
:Seminar/ Signage other meeting patrol/ task force and
environmental  Waste formulation of
Production of reading concerns dumping or respective barangay
materials/ Jingle  Lukewarm attitude littering by SWM ordinance
of majority of the perpretrators  Attendance to
household / etc. from other Barangay Councils
sectors on SWM towns done Session/ assemblies
 Partial at the wee and other forms of
enforcement of the hours of the gathering activities
law due to poor day
enforcement
mechanism
5. Capability building of  Newly assigned  Presence of  Conduct of Seminars
ENRO personnel/ Solid personnel and environmenta on these concern
Waste Management members of the l destroyers separately
Board Members/ MSWM Board and and violators  Enforcement of
BSWM Committee BSWM Committee  Adamant existing ordinance,
Members, SK, etc. Members. waste and of RA 9003 and
Knowledge on generators/ other enrussion
environmental non-feasanse environmental laws
Laws and existing of existing
ordinance have to laws
be enhanced thru
seminars
6. Protection/Rehabilitati  Forest denudation  Rampant  Ordinance adopting
on of forests as well as destruction of the illegal cutting, provision of RA 3898
the floras and faunas wild flowers and killing of 0f 1932 and RA 9147
plants and animals wildlife for of 2001
 Destroyed habitats profit, foods  Deputization of
of existing endemic or transport bantay kalikasan task
wildlife and plants and use of force
unregistered  Close Coordination
chainsaw with nearby
residence and
conduct of IEC
7. Environmental  Normal use of non-  Presence of  IEC on the Laws
Greening environmental manufacturer Governing this
friendly items at s of toxic or concern as RA 6969
home, business hazardous 1990
establishment, items as  Ordinance to adopt
schools and even sprays, provisions of RA 6969
offices fertilizers, implementation of
 Rampant charcoal paints, lead PA No. 705 of 1977
making practice of loaded fuels,  Revised forestry code
kaingin by farmers etc.
 Unconscientious  Increase
cutting of young number of
trees for firewood charcoal
makers
 Most families
the rural
areas resort
to tree
cutting for
sale
8. Protection/Conservati  Level of water  More  Tree planting activity
on of Watershed source is residents are to be observed
Areas continuously getting into regularly by
lowering tree cutting numerous sector.
 Sorrounding areas around  Enactment of an
are gradually watershed ordinance for the
stripped off of its areas protection/conservati
vegetations on of watershed
areas
 IEC among residents
creation of task force
for this concern.
9. Rabies Free  Delayed conduct of  Presence of  Optimum
Community Anti-Rabies mass stray dogs Appropriation of
vaccination  Incidence of budget in observance
 Lack of Budgetary dog bites & of RA # 9482 of 2007
Allocation bite victims
deaths
10. Rehabilitation of  Heavily  Increasing  Organization of these
devastated/over destroyed/deforme number of small miners for
quarried areas in San d surface small miners
Francisco, Binitayan &  Waterflow Pattern  Inobservance permit & regulation
San Jose in different of assigned of activity
directions quarry sites  Observance of the
 Threat for flooding by the small Provincial Ordinance
incidence to nearby miners for Quarrying
barangay
11. Enactment of an  Numerous  Health of  Creation of the
Environmental laws/ordinance are human, forest Technical Working
Ordinance unknowingly destruction & Group in the
violated pollution of formulation of the
air & water environmental code
are inflected  Budget appropriation
into the
environment
12. Biodiversity Protection  Unrestricted  Inflected into  Regulations must be
and Biosafety collections of the spearheaded by the
wildlife and floras Environment ENR office
for trade, transport  Presence of  Prohibition of the
or export traders of unpermitted
 Breeding/propagati wildlife & collection of existing
on of wildlife for exotic floras floras & faunas in
commercial restricted/protected
purposes areas
13. Creation of a MENR  Only a designated  The common  Pass an Ordinance for
Office and position of MENRO squatting misconstructi the Creation of Office
MENR Officer at the ABC Hall as on that & Officer for the
(Municipal the office for environmenta Municipal
Environment & Municipal l sector is Environment &
Natural Resources Environment and only limited Natural Resources.
Officer) Natural Resources to SWM
concern of the concern
Municipality  Full authority
is not
accorded to
the
designated
personnel
 Other
department
assumed
inherrant
function that
are within the
scope of the
MENR Office.

You might also like