You are on page 1of 1

STONE MASONRY (Target = 245.

12 m3)
V1 = (8.38) [(1.20+0.50)/2] (1.80) (4) = 51.29 m3
V2 = (8.38) (1.20) (0.80) (4) = 32.18 m3
V3 = (13.80) (1.20) (0.80) (4) = 52.99 m3
V4 = (13.80) [(1.20+0.50)/2] (1.80) (4) = 84.46 m3
TOTAL= 220.92 m3

GROUTED RIPRAP (Target = 179.19 m3)


Va = (4.38) (0.50) (0.30) (4) = 2.63 m3
Vb = (5.38) (0.30) (4.30) (4) = 27.76 m3
Vc = (5.88) (1.00) (0.30) (4) = 7.06 m3
Vd = (6.88) (0.30) (4.30) (4) = 35.50 m3
Ve = (7.18) (0.50) (1.00) (4) = 14.36 m3
Vf = [(1.85) (1.85) (1.0)/2] (4) = 6.85 m3
Vg = (4.60) (1.00) (0.30) (4) = 1.38 m3
Vh = (5.10) (0.30) (3.60) (4) = 22.03 m3
Vi = (8.10) (0.30) (0.50) (4) = 4.86 m3
Vj = (9.10) (0.30) (3.60) (4) = 39.31 m3
Vk = (9.10) (0.30) (1.0) (4) = 10.92 m3
TOTAL= 172.66 m3