Professional Documents
Culture Documents
Rab Penawaran Subkon
Rab Penawaran Subkon
8,741,375.00
2 Pasangan Dan Pelapis Dinding
a. Pas. Bata m2 102.50 85,000.00 8,712,500.00
b. Plester + Aci m2 118.00 40,000.00 4,720,000.00
d. Pas. Keramik KM m2 7.50 105,000.00 787,500.00
e. Pas. Lantai KM m2 2.25 105,000.00 236,250.00
f. Pas . Keramik Lantai Utama m2 27.75 90,000.00 2,497,500.00
g. Pas. Keramik Teras ls 2.00 90,000.00 180,000.00
17,133,750.00
3 Atap Dan Langit2
a. Rangka Atap Baja Ringan m2 36.00 120,000.00 4,320,000.00
b. Plafond m2 36.00 60,000.00 2,160,000.00
c. Genting m2 42.12 90,000.00 3,790,800.00
d. Bubungan m1 6.00 90,000.00 540,000.00
e. Listplank m1 12.00 35,000.00 420,000.00
11,230,800.00
4 Kusen Pintu
a. Kusen m1 39.40 65,000.00 2,561,000.00
b. Pintu Unit 5.00 650,000.00 3,250,000.00
c. Jendela Unit 4.00 350,000.00 1,400,000.00
7,211,000.00
5 Cat
a. Cat Binding m2 118.00 11,000.00 1,298,000.00
b. Cat Plafond m2 36.00 11,000.00 396,000.00
d. Cat Lisplank m2 12.00 10,000.00 120,000.00
1,814,000.00
NO PEKERJAAN SAT VOLUME HARGA SATUAN JUMLAH
6 Elektrikal
a. Panel MCB m2 1.00 250,000.00 250,000.00
b. Titik Lampu m2 4.00 100,000.00 400,000.00
c. Titik Stop Kontak m2 3.00 120,000.00 360,000.00
1,010,000.00
7 Pipa Dan Sanitair
a. Closet Jongkok m2 1.00 200,000.00 200,000.00
b. Bak Mandi m2 1.00 300,000.00 300,000.00
c. Avor m2 1.00 25,000.00 25,000.00
d. Saluran PVC Air Kotor m2 7.00 25,000.00 175,000.00
e. Saluran PVC Kotoran m2 5.00 25,000.00 125,000.00
f. Septictank unit 1.00 250,000.00 250,000.00
g. Resapan unit 1.00 200,000.00 200,000.00
1,275,000.00
50,947,175.00