Penspen Project - Xyntech Solutions

Sr no. Category no. Of hours date

CAD drafting 2 12/20/2019


1
Engineering/ Design /Study 2 12/20/2019

CAD drafting 2 12/21/2019


2
Engineering/ Design /Study 2 12/21/2019

CAD drafting 4 12/26/2019


3
Engineering/ Design /Study 2 12/26/2019

CAD drafting 5 12/30/2019


4
Engineering/ Design /Study 5 12/30/2019

Note - 9 hrs spent for study, design before actual CAD work started so they have to be added in Study category

Total Manhrs for Dec 2019

CAD drafting
13
Engineering/ Design /Study
20
tech Solutions
Remarks

KOD area

KOD area

3 dwgs issued for KOD area

all dwgs issued for KOD area

tarted so they have to be added in Study category


Penspen Project - Xyntech Solutions
Sr no. Category no. Of hours date Remarks

1 Engineering/ Design /Study 4 1/4/2020 Study C I skid area

Stripper pump piping study/


2 Engineering/ Design /Study 2 1/9/2020 plot plan

Engineering/ Design /Study 4


3 1/10/2020 Plot plan issued-Stripper pump
CAD drafting 4

4 Engineering/ Design /Study 2 1/11/2020 Study Stripper pump Plot plan

5 Engineering/ Design /Study 4 1/12/2020 Study Stripper pump GAD

Engineering/ Design /Study 4


6 1/13/2020 1 GAD Stripper pump issued
CAD drafting 4

Total Manhrs for Dec 2019


CAD drafting 8
Engineering/ Design /Study 20