You are on page 1of 8
‘SAUDI ARABIAN OIL COMPANY Fs eas | rea) y dspgnuwl gSoht "al ‘Saudi Aramco JAZAN REFINERY AND TERMINAL PROJECTS DEPARTMENT BI-25-00037-0008 JAZAN ECONOMIC CITY - PORT CONTROL CENTER (DETAILED DESIGN) PIPING HYDRAULIC CALCULATION (FROM INTERFACE POINT TO PCC BUILDING FACILITY) POTABLE WATER and FIRE WATER SUPPLY LINES Ele 7 Sac MARCH 2018 ei i EY TY COMMER PORT 750 || sxcatons | | op a Baa ‘SAUDI ARABIAN OIL COMPANY Free ea | Pe an Es 1.0 Scope ‘ns document ta sho head lesa fr Freatr (FW) and Oring Water (OW) supply nes ‘tem the rte pit upto PCC Buln Facty under 81-25-00037-0008-Jazan Economic iy “Por Gonvol Carer Buln, “The calculations presented horn provide the Inlrmaton andi supslament tothe requir ‘ppleab SAUDI Aamo standards 20 References 24 Saudi Aramco Standards ‘Standard Number Tile SES 105 Piping Line Cisss0s SAES-L-182 Material Selection or Piping Systm SAESS.0t0 Sauc ramon Water Systems SAES-S-080 ‘Save Aramco Plumbing Codo SAES-B-O17 Fie Water System Design 22 Project drawing ¥A00405 Overal Ping Layout ¥A.008498 Ping Plan PW Ouse Bldg yA000440 Piping Plan -FW Outside Blip yaooases Piping Plan -FW Pump Staton (PCC) xA-008680 Plumbing LO Grd & 1" Foor Water PRS HS OS TT TET TOT Bsl2f is |B Hil ran Frme wom cacuATON-AVEeW Tosrnrs|raa]een | cowmne [ova [pone Bo oe cam POT TTA | scence | Z| oo gett a “sar anaaa [0 — sora 2 a 266 206/89) 2/2 ‘SAUDI ARABIAN OIL COMPANY STGIT ] 82 Bestar Bei a esamptns nd caeuton or Pte Water Stem aH A ForPtal Water Syste rom nice Plt PW Soa Tan aa Inroference to SAES-S-040 paragraph § 5.1 Table 1- Head Losses and Volocties for piping HE ‘Maal t HOPEIOPVG Hazen Wa actor a0 athe vateam presse be pet interface pont pressure requirement Indested at Inirface Matrix Document, F Folowngassunpon ar eaniotod at PCC bl: F ||| Snore I ale > Ntimm Fw ater pot = 5 GPM E He > Regitedmoinum Pressu at PY Storage Tank Nez = 15 pig F als ale > Max, lone Velo fo HDPEICPVC ~ Sm (per SAESL-132) IP 2 > Chango in postive elevation = 5 meters IE > Euler pipe lent for 2NPS 90d ons = 57 fat FE > Euan pipe lent fr NPS. Gate valve Steak > HazonWians iomaforHeadlass: those scone 0 o £8 For Frewater System From Interface Pont o FW Suction Header del Inference a SAES-B-017 paragraph 209, he pe flow for (Cat or Hazen Was a {ermune sao and 12 fo RT er HOPE) ane Comat Ine Stal (nar © FE ios HE" | Sa}reepecialy. Tho waream poss wil boas pr noac pot presse request = inated ot etoc ati Dana Flowing assumptions: considered st PCC bldg > Mesum Pressure a trace pal = 40 pig >> Miu Fow at intsacepolt ~ 1125 GPM (mainly for FW Pump Sucton) > Reged minimum Pressure at FW Suton Header = 20 psi > Reepited minimum Fow at FW Sueton Header = 1125 GPM > Max. ilonable Veoy for ATR & FE Lined OS =5 & dls oxpocvely (por SAES-L-192) > Chango in postive clovaton =2 motos > Equlvalont pipe length of 90° Bows: BATA = 2aftand BFE lined = 1411 > Equivalent pipe org fr Gato valves: Gato Vales = 45 > Hazen-ans formula for Head oss: H «02085 x 119g 0! - Sr er [HEA ECONOMIC ITY PCC. 5 ‘STY OOMMERCAL FORT T50 [a | sxcacrs | 2] 9 zen Sau amaBik | 161 — AsO 2 anes 53606 ae ‘SAUDI ARABIAN OIL COMPANY STS] [| 22 Hasse Calan Patni water System ar Calter taad on Hania for eon SAES-£-00 581 ae TR + : roatant ore : soe : ay Fi Ret “egaler mtet i : ‘oe Ta fa Segaaosengnntrt i 2 2382 imdor DS mm “Ova ameter 8 ® ~ | 13 ends PL at me ss]enmgetn(Emain= 040 or 00D ten ai ® oe a ae z ee 1886 ch de » o- amon Boomer e ve SEELUMOMaC mtd fe as hop tnt = hen = Seta Cin x 254 ak“ dae AM) * ese GPM “malted evident Sven 20-4 2] cect tects, yop 0 13s tL lst sen Ge] 1] sen nett Tm iORRCCNERATOR ATP Tomo aare|wn| —eemem [oom] THEN ECONO TY PE = ; al cca A[ secacw | | oo a uouvaan [902 aroma aE ‘SAUDI ARABIAN OIL COMPANY 5 7 See if : ili : SS -eaanetnt H eos : : eee 5 i whe ear ewe eaitoo ee eee ale : ae el gee a0 ay B| cphigsemte be Sms ; 7 | Hearse ; 3 Pea ae amen Ti ec g i = -_ =a ‘ow ndeated in Secton 30-4, o eat tae, (tHopr 001 “oss to ttt “het ot SAS S000 yd dee AR, be (GM “Pequed tn eatin seein 08 ‘post Helos, Oper 0 Ata apt eadesatomsherosoestonspe) CE] iz seein tt = geeeeaeessaeceate a eauuaaa HEBAREE SET TT EE ET RTT A RT OP TE TT Fil Avalate rssr a wd PN Tak a voncrmunccanaron-rvert [epre[nare[ee] ommere [orm] a ee Io ‘SAUDI ARABIAN OIL ‘COMPANY. 5.0 Head Loss Caloulation Firewater Systom Calculations are based on Hazon Wiam formula as recommandodby SAES-B-017 sc 5.203 TT ETERS 5a Remon Saws aces 7 ees len a BL carers oe tet “Sutyni i See case es) a) oe monmeces ale S| Ag fs] roe rath wwe 0mm “tee a8 a ee A 5 i =| ween od Sl owontiteans ome on is Hi ——2 |i Fs wie Ye B"H SAL 2 a =| este SEE | [S| nme nms | eo 3 tenon a Ye eo Teo 3 fete teh ha eo | Qn nemo GM “Teter nat ina Sh eae ene oea = stint a = samen ce SRA | oppress] memos — [orn] mr Sem iescericeed : ‘TY cOnERCIA PORT TO [a | seeacn | 8 | op ‘SAUDI ARABIAN OIL COMPANY FES EIFS rm ar FE a 5] ane “3 B it | rests acess HE st Fase STD 40 a S| teen me me ale re oe | ere Sfmt Ceuta Foesiie 2 fe tt “ethane | omnes 3s tt “eManninma Z mo] Peeco=tastse2t8mmttr ay ee ng i Hy és] kaos a 3 88] Charge n(e} Eevaion = 8.58 tor 200 mates By oe aw Hb a wea See 3 Si ei sal al | ves on Seteeee eee | f somes ey fy etBanI Ops Cas | = irrsOpe toe) a Wes C210 “Wevom semen Le | || vet inaty e co “Yeti ae] see ttn Hope toy Ga 3) sn ni 2) son aq | meaarmonervei ss = CE] CR] “tans 3] retvestn =| asl pee tet, | es pce tet ne Eeseaes eed “oc [ae || wenn fon [ne 7 ‘GY COMMERCIAL PORT T50 | a | seccaters | Oe | 00 a ql rz ‘SAUDI ARABIAN OIL COMPANY 38 ETEL_[ | 99 consson Tel ‘As por calodatons above al selected pipes fr he PW and FW system sat al pressure and ow af rermers'o cup ho PW Tank BOC Buln and POO FW Purp San. ali A He a a Hb de DARE SL COLTON A ag ame | meee [owns Pra sr orand 3 ‘TY COMMERCIAL PORT Too] a | sxcac | 8] oy

You might also like