PROGRESS REPORT FOR ONGOING WORKS UNDER PMGSY GRANT - More than 4 years Old
Amount Rs. in Lakhs & Length in Km
Sanctione Dt. of Road Estimate RAS if any EOAT Length S.N District Block Packag d Year/ Road Name / Bridge Dt. of completion sanctioned Length/ Cost Rs. Rs. In Present Stage of work Completed o Name Name e No. Work Name Agmt. as per Bridge (M 18.01.2020 In Lakhs Lakhs if any Type Agmt. )
Bhadradri C/o Bridge at 2/8 km on
Dammap AP08IX 2010 - 2011 17 Kothagud R/F Nagupally to 107.79 12/1/2017 31.11.18 -- To be dropped. 0.00 eta LB02 LSB em Thottipumpu
Bhadradri HLB across Eedulavagu at 6 vents of Approaches in progress. A detailed Report
Kothagu AP0814 2013 - 2014 18 Kothagud 7750m on RF Rudrampur 641.00 4/23/2015 22.10.16 30.06.18 10.37 mts Called from SE and further EOAT 0.00 dem LB02 LSB em to Upparigudem span proposals also not received 18.01.2020