PROGRESS REPORT FOR ONGOING WORKS UNDER PMGSY GRANT - More than 4 years Old

Amount Rs. in Lakhs & Length in Km


Sanctione Dt. of Road
Estimate RAS if any EOAT Length
S.N District Block Packag d Year/ Road Name / Bridge Dt. of completion sanctioned Length/
Cost Rs. Rs. In Present Stage of work Completed
o Name Name e No. Work Name Agmt. as per Bridge (M 18.01.2020
In Lakhs Lakhs if any
Type Agmt. )

Bhadradri C/o Bridge at 2/8 km on


Dammap AP08IX 2010 - 2011
17 Kothagud R/F Nagupally to 107.79 12/1/2017 31.11.18 -- To be dropped. 0.00
eta LB02 LSB
em Thottipumpu

Bhadradri HLB across Eedulavagu at 6 vents of Approaches in progress. A detailed Report


Kothagu AP0814 2013 - 2014
18 Kothagud 7750m on RF Rudrampur 641.00 4/23/2015 22.10.16 30.06.18 10.37 mts Called from SE and further EOAT 0.00
dem LB02 LSB
em to Upparigudem span proposals also not received
18.01.2020

Exp. upto Balance Balance


18.01.202 Length
be
to
Estimate
0 completed Cost

2.11 105.68

142.59 498.41