You are on page 1of 31

ENVIRONMENT, HEALTH & SAFETY PLAN

Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

ENVIRONMENT, HEALTH & SAFETY PLAN


FOR
AIPL JOY CENTRAL SECTOR 65 GURGAON

CONTROLLED/ UNCONTROLLED COPY

Prepared by Approved by Doc. No: SKE/ AIPL/ EHSP

Rev. No. 0

Sachin Samal Dated: 20.01.2020


Coordinator EHS HEAD
Shri Krishna Engineers AIPL

SHRI KRISHNA ENGINEERS


CONTENTS

S. NO. DESCRIPTION Page no.


1 Introduction 3

2 Safety organization chart 4


3 EHS Policy 5
4 Role and Responsibility 6-7
5 Safety Standard and Procedures. 8
5.1 Hot Work Activity. 8
5.2 Working at Height. 8
5.3 Electrical Safety. 9

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 1 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

S. NO. DESCRIPTION Page no.


5.4 Working At Height. 9
5.5 Lifting and Slinging 9
5.6 Grinding 11
5.7 Excavation 11
5.8 Housekeeping. 12
5.9 Waste Disposal. 13
5.10 Emergency Procedure 13-16
06 PROCESS OF CONTROLLING ENVIRONMENTAL ASPECTS 17-21
6.1 Environmental (Noise, Dust & Water) Monitoring & Control 17
6.2 Dust Suppression 18
6.3 Debris (Construction Waste) Collection & Disposal 19
6.4 Waste Water (Sewage, Canteen Waste, B/P Or Mixer Waste 20
07 On Site Emergency plan 22-29
08 Labour management. 30
09 Material Management 30
10 EHS Training 30-31
11 EHS Budget 32
12 EHS PERFORMANCE TRACKING & CLIENT REPORTING 32

INTRODUCTION
SKE is in the field of “FIRE FIGHTING AND PLUMBING “work since last ten years. We
have well experienced executive’s engineers and workmen.

 This document defines the Health, Safety and Environment (HSE) requirement to be
implemented during the completion of project by SKE.

 Safety shall be managed as per safety standard and work regulation act. (Building and other
Construction Work )

 Management shall set the safety objectives which shall be Specific, Measureable,
Achievable, and Realistic to the task within the time scale.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 2 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

 Safety objectives are to ensure that the project shall be carried out without causing any
injury or illness to personnel’s.

 Company has the equal value to SAFETY, QUALITY, and PRODUCTION.

 Everyone in the organization should work to achieve customer satisfaction by


supplying/completing defect free projects on time.

 SKE Safety target will be “ZERO” accident/incident.

 The basic responsibility of enforcing this guideline rests with the project manager of site
and safety officer of the site will assist him by implementing safe working practice.

 SKE believes that managing safety is a line responsibility and it is a good business practice
to provide safe working environment to the workmen of site.
 SKE safety slogan is “THINK SAFETY WORK SAFELY”.

Safety organization chart.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 3 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

MANAGING
DIRECTOR OF SKE

PROJECT
INCHARGE

SITE SUPERVISORS
SAFETY INCHARGE

ERECTION TEAM 1 ERECTION TEAM 2

EHS POLICY
The company considers the health and safety of its people and environment protection to
be among its greatest responsibilities.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 4 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

Accordingly the company undertakes measures to minimize the risk from hazard in the
work place, to protect the natural environment and to safe guard the health and safety of
employees, safety of contractor, and sub-contractor.
To achieve the aim of the occupational Health, Safety and Environment policy the company
shall,
 Develop and maintain a safe work environment and safe system of work practice within the
scope of legislative provision.
 Provide necessary trainings and guidelines to all employees.
 Provide adequate personal protective equipment to protect employees from hazard which
cannot be otherwise eliminated or controlled.
 Ensure the safety/medical emergency procedure is disseminated to all employees, and
maintain adequate first aid facilities.
 Conduct safety audits to monitor effectiveness of existing policies/procedures, identify
work practice/condition that are potentially harmful to employees, and implement
corrective measures as low as reasonably practicable.
The company recognized that the achievement of an effective occupational health, safety and
environment program demands the active and positive involvement of all levels of management,
and requires the full participation and support of all employees.
We commit and firmly believe that;-
The continual improvement in HEALTH, SAFETY and ENVIRONMENT protection is an important
issue and forms an integral part of our business.
Managing health, safety and environment protection is a line responsibility.
All accidents are preventable.

SUDARSHAN BHUYIAN
MANAGING DIRECTOR OF SKE.

ROLE AND RESPONSIBILITY


PROJECT INCHARGE: - Project In charge is responsible for health and safety of
employees working with him. Key responsibility of manager shall be
 Establishing a culture of continuous improvement of Health and Safety performance.
 Providing sufficient Information, Training, Instruction, and Supervision to help
employees for working safely.
 Provide safe environment and welfare facility.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 5 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

 Providing Safe equipment and Plant.


 Demonstrating personal commitment to “ZERO” accident/incident.
 Setting Health and Safety performance improvement targets, and aims.
 Providing adequate personal protective equipments.

SITE ENGINEER/SUPERVISOR: - These are the following responsibility of site


engineer / supervisor.
 Must know the safety standard and procedures.
 Must know the hazard associated/ related to the work activity and their preventive
measures.
 Ensure the proper usage of P.P.E. and safety appliances by the work force.
 Ensure everybody should be aware of emergency plan and emergency exits.
 Discuss the safety policy with all the workers and make the policy effective on site.

SAFETY OFFICER; - Safety officer has the responsibility to give advice to management
on Health and Safety.

 Identify the hazards associated/related with the task.


 Suitable and sufficient risk assessment shall be carried out by the site safety officer.
 Implementation of safe system of work and performance standard.
 Providing information on legal requirements.
 Carrying out safety inspection of work place.
 Investigating Accidents/ Incidents, keep record and give feed back to management.
 Conducting safety Trainings, induction training, tool box talk, etc.

RESPONSIBILITY OF EMPLOYEES;-There are following responsibilities of employees.


 Not to endanger themselves and others by their own action.
 Not to use damaged equipment, and tools.
 Co-operation with employer to maintain good safety standard.
 Follow the Instruction, Information, and Training provided by the employer.
 Provide information on any dangers, and other problems with health and safety
arrangements.
 Proper use of Personal Protective Equipments.
 Report any dangerous occurrence, near miss, and accidents/ incident occur on the site.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 6 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

SAFETY STANDARDS AND PROCEDURES

1)HOT WORK ACTIVITY;-


Any work which is potentially hazardous and can cause of Fire and Explosion, Heat,
Stress, Excessive light, Ultra-violet radiation, Fumes, etc. These activities shall be controlled by
adopting “PERMIT –TO – WORK “system.

PRECAUTION TO BE TAKEN FOR HOT WORK ACTIVITY

 Activity shall be carried out by only component or skilled person.


 Activity shall be carried out at a safe distance from combustible/ flammable materials.
 Power supply shall be kept off from the source when not in use.
 Fire extinguishers must be kept on site.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 7 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

 All combustible materials shall be stored separately.


 Electrical equipment shall be inspected prior to use.
 Activity shall be carried out under the component supervision.
 Adequate P.P.E. must be used.

2) WORKING AT HEIGHTS; - Any activity which can be done above the ground level
will consider as WORKING AT HEIGHT. It can cause fall from Height, Equipment fall from
height, Slip and trip, High speed wind hazard, etc. Working at height shall be consider
working on scaffold (above 2mtrs from the ground), working on roof, working on un
protected edge of the building level, working on ladders, etc.

PRECAUTION TO BE TAKEN WHEN WORKING AT HEIGHT

1) Only standard scaffold or platform shall be used when working at height.


2) Only trained and authorized person shall erect the scaffold or platform.
3) Only trained and authorized person shall work at height.
4) Ladders must be inspected prior to use.
5) Only good condition ladders shall be used.
6) Do not keep any loose materials on the scaffold platform.
7) Fall protection device shall be used when working above 2mtrs from ground level.
8) Proper P.P.E. shall be used.

3) ELECTRICAL SAFETY; - Using of electricity can cause electric shock, electrical


burns, electrical fire and explosion, etc. Can cause while using electrical tools during
activities like, Welding, Grinding, Machining. Permit - to - work required for working on any
live electrical panel or for maintenance of any machinery or equipments.

PRECAUTION TO BE TAKEN FOR ELECTRICAL SAFETY


 Only good cables and wires shall be used.
 Only trained and authorized person shall operate the machinery or equipments.
 Only authorized and component person shall be appointed for maintenance work.
 Cables and wires shall be disconnected from the supply source when not in used.
 All electrical equipment shall be earthed properly.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 8 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

 Clear instruction, information, shall be given prior to work.


 Good and clear communication shall be maintained.
 Only good condition socket and plug shall be used.
 Do not touch any switch with wet hand, feet.Only dry cloths shall be used when working with
electricity.
 Do not over load electric circuit.
 Only insulated tools and equipment shall be used.
 Adequate P.P.E. must be used.

4) LIFTING AND SLINGING; - For lifting and slinging heavy materials / equipments.
Some mechanical means shall be used, Like Mobile crane, Tower crane, Over-head crane,
Jib crane, Trolleys and jacks, etc. Some serious accident / incidents can cause due to
mechanism failure, miss-use, over loading, un-authorized or un-trained persons, etc.

PRECAUTION TO BE TAKEN FOR LIFTING AND SLINGING

1) Only trained and authorized person shall be assigned to operate the equipment or
machine.
2) Only certified and tested equipment shall be used.
3) Equipments shall be used as per S.W.L (Safe working load).
4) The load shall be determined before it is rigged for lift.
5) All rigging gears shall be stored separately.
6) All rigging gears and equipments must be inspected prior to use.
7) Clear and good communication shall be maintained with co-worker.
8) Signalman (Flag man) shall be assigned for signaling.
9) Lifting shall not be allowed when the wind speed is too high.
10) Always use TAG-LINE for controlling the suspended load.
11) A load shall not be kept suspended in the air when the hoist or crane is un attended.

MANUAL HANDLING; -
Lifting and shifting materials manually can cause Pinch injury, Strain, Back pain,
Hernias, Fractures, Cut, Crush, etc. some precaution can be taken when performing
manual handling.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 9 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

PRECAUTION TO BE TAKEN FOR MANUAL HANDLING

1) Always get help if the load is too big or difficult to handle.


2) If necessary, use mechanical lifting equipments.
3) Grip the object properly with whole hand using palm and figures.
4) Maintain good body position.
5) Pathway shall be cleared of any obstructions.
6) Maintain good communication, Timing, and Co-Ordination while more than one
employee is used for manual handling.
7) Appropriate protective hand gloves shall be used when handling Rough, Sharp, Hot, or
Hazardous chemicals.

5) GRINDING WORK ;- Grinding activity can cause Eye injury, Face injury, Cut, Hand
injury, Noise, Dust, Ergonomic hazard, Fire and explosion, etc. Following precaution
shall be taken when performing grinding activity.

PRECAUTION TO BE TAKEN FOR GRINDING WORK

 Only trained and authorized person shall be assigned for grinding work.
 Equipment shall be inspected prior to use.
 Correct speed type grinding disc shall be used for correct speed type machine.
 Wheels/Disc that has been dropped shall not be used.
 Grinder shall be used with manufacturers approved guard.
 Work piece shall be secured properly throughout the grinding operation.
 Sparks and Hot metal shall not be allowed to fall on personal or combustible materials.
 Do not use grinding disc from side.
 Proper P.P.E. shall be used.

6) EXCAVATION: - Excavation can cause fall hazard, collapse of adjacent structure,


contact with buried services, hazardous atmosphere, etc.

PRECAUTION TO BE TAKEN FOR EXCAVATION


 Excavation should be done by only trained and authorized person.
 Buried services must be detected prior to start excavation work.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 10 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

 Sufficient support to be given from all the sides.


 Area should be barricaded and signed must be placed.
 Sufficient ventilation and light should be provided.
 Proper P.P.E should be used.

7) PERMIT TO WORK; - A permit – to – work procedure is a formal written system


used to control certain types of work which are potentially hazardous. E.g. Excavation
work, Work in confined space, working at heights, hot work, Radiography work.
Generally permits are classified into two types.
1) HOT WORK. 2) COLD WORK PERMIT.

1) HOT WORK PERMIT; - Hot work permit used to prevent Fire and Explosion
through presence of flammable atmosphere.i.e. Gas cutting work, Welding work,
Soldering, Brazing, Grinding. Etc.

2) COLD WORK PERMIT; - Cold work permit used to identify the hazards
associated to the task and sufficient control is set to prevent an accident /incident
throughout the activity. Cold work permit required for Working in confined space,
working at height, Electrical work, Painting work, Radiation / Radiography work. Etc.

8) HOUSE KEEPING;-

 Housekeeping can be defined as systematic arrangements of all equipment,


materials, machinery, combustible materials which present fire risk shall not be
permitted to build up in any construction area shall be kept separately.
 Housekeeping is the responsibility of all site personnel and line management
 Shall be demonstrated by continuous efforts of supervising staff towards this
Activity.
Machinery shall be maintained cleaned and free of un-necessary materials, oils,
grease.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 11 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

 Walkways shall be free from any of obstruction, Cables and hoses shall be
routed properly.
 Materials shall be stacked and secured properly, and Work area shall be cleaned
at the shift end or completion of work activity during working hours.
 Periodical scrap removal shall be done periodically.

9) WASTE DISPOSAL ;-
 Waste shall be dispose in proper way which is generated at work site.
 General waste shall be dispose separately from harmful and chemical waste.
 Metal scrap shall be dispose separately for recycle.
 Hygiene waste shall be dispose separately.
 Papers, Card boards, and other waste that can be recycle shall be dispose
separately as per the recycling process.

10) EMERGENCY PROCEDURE;-


 Emergency procedure shall be on placed to control emergency situation.
 ‘MUSTER STATION’ shall be marked and familiar to every employee.
 Emergency contact number shall be displayed on common places, and shall be
displayed on noticed board.
 Firefighting equipment shall be kept at every hot work area. Fire alarms shall be
placed to inform of emergency situation to employees.
 Rehearsal shall be done periodically to familiarize procedure and to make procedure
in work.

SAFETY INSPECTION; -
 Safety officers carried out routinely to identify the work place or equipment
hazards within it, and assessing the use and effectiveness of control measure.
 Safety inspection shall be conducted after every one month by the safety
department, observation shall be recorded and copy shall be send to the
concern management.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 12 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

SAFETY AUDIT; -
 A safety audit shall be carried out to check the strength of organization.
 Critical examination shall be carried out of safety management system and
procedures like, Risk assessment, Accidents/ Incidents records, Training record,
Maintenance records, etc.
 Safety Audit shall be carried out by trained auditor or by the Third party.

SAFETY COMMITTEE; -
 The main aim of the safety committee shall be, to establish effective co-
ordination in between Management, Safety Representatives, and Employees to
ensure organizations Health and Safety at work.
 It is one of the most successful tools to promote health and safety at work and
reduce occupational accidents.

ACCIDENTS / INCIDENTS RECORDS; -


 CEPL will investigate each and every Accident/ Incident and Near Miss to find
out the root cause of the accident.
 Based on investigation report further control will be implemented to prevent
the accident, avoid similar accidents to happened again, and to provide
information to all work force about the accident and their control measures.
 CEPL safety department will keep the records as a monthly record, quarterly
record, half yearly and annual record.

TRAINING; - SKE will provide following trainings to all employees, including


Contractors and sub- contractors.
 Induction training to all new employees during the first entrance on site.
 Periodical training for staff.
 Tool Box Training before starting the job.
 Training for new equipment and tools introduced on site.
 Manual handling techniques.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 13 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

PERSONAL PROTECTIVE EQUIPMENT (P.P.E.):-


 Personal protective equipment is the last resort to control the hazards.
 SKE will provide P.P.E. to every employee based on their operations,.
 P.P.E shall be used to protect the employees from the severity of accident and
harm.
 All employees who will enter the work site must have to wear Safety Hard – Hat,
and Safety Shoes.
 All employees are responsible to use correct P.P.E. according to their task. It is
everyone responsibility to take care of their P.P.E. provided by the company.

WELFARE FACILITY; -
 SKE will take care of all the basic needs of employees on site. Clean and clear
drinking water will be provided on site.

 SKE will provide safe environment like, sufficient lights on site in darker area or
at the night time, in generally SKE will take care of all the basic need of
employees.

FIRST AID FACILITY ;-


 First Aid center shall be provided on site, first aid box shall be kept on site with
all the necessary equipments and tools.
 First aid shall be given by only trained and authorized First Aider.
 All major cases will be taken to the nearest hospital after giving necessary first
aid.
 Ambulance facility will be call to handle major cases. All first aid cases will be
kept as a record.

WORK ILLUMINATION AREA :-


 Proper illumination shall be ensuring for all work place.
 Ensure that luminaries are placed properly so that no person is required to work
in dark areas.
 All luminaries should be robust, resistant to corrosion and rain proof especially
at the point of the cable entry.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 14 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

 The correct type of lamp for each luminary should always be used and when
lamps need to be replaced it shall be in accordance with the supply voltage.

PROCESS OF CONTROLLING ENVIRONMENTAL ASPECTS:-

Environmental (Noise, dust, & water) Monitoring & Control:-

 Noise Control & monitoring:


The following measures need to be adopted to minimize the impact of noise during
construction.
 Workers who are exposed to noise shall be provided with hearing protection like
earplug / muffs.
 Providing ear muffles to employees who attend any work inside the D.G. Room.
 The noise generation level shall not be allowed for more than prescribed limits.
 Stationary equipment shall be located in such a way that noise levels generated
have least or nil impact on the community.
 DG shall be enclosed by barricades in order to reduce sound levels.

 Dust control:
1. Dust mask shall be used by worker /staff.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 15 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

 Water :
1. Provision of drinking vessels or other suitable method of drinking.
2. Water provided for labors at site should be potable.
3. Regular Cleaning of drinking water tanks shall be done.

Debris (Construction Waste) Collection &Disposal


1. Debris generated during chasing. Etc shall be removed and disposed at the
designated area.

Waste water (sewage, canteen waste, B/P or Mixer waste).


1. Water Pollution Control. Waste water if any shall be drained in to suitable drain
outlet.
2. Site hygiene. Site hygiene shall be maintained well to keep the good healthy
working environment at our work site.

EMERGENCY MANAGEMENT PLAN (ON-SITE/ OFF-SITE):

 This Emergency Plan (ON-Site/ OFF-Site) explains the code of conduct of all personnel in
the project site along with the actions to be carried out in case of an Emergency.
 This plan gives the guidelines for employees, contractors, transporters, etc.
 It not only defines responsibilities but also informs about prompt rescue operations,
evacuations, rehabilitation, co-ordination and communication.

EMERGENCY:
An Emergency is a situation, which may lead to or cause large-scale damage or destruction of
life, property or environment within or outside the Project site. Such an unexpected situation
may be too difficult to handle for the normal work force within the project site.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 16 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

NATURE OF EMERGENCY
The emergency specified refers to occurrence of one or more of the following events: -
a. Fire.
b. Major accident such as structural or building collapse.
c. Natural calamities like storm, earthquake, etc.
d. Land slide
e. Sabotage act of terrorism, civil commotion, air raid etc.

IDENTIFICATION OF HAZARDOUS AREAS

HAZARD AREA PROBABLE CAUSE OF THE


ACCIDENT
Fire Wooden scrap storage, Hot work near PVC, wooden
PVC Scrap yard, Packing cartoons and scrap.
wires Electrical short circuit.

Land Slide WT, Emergency hopper, Water leakage Vibration


Heavy Rain etc.
Structure Failure Building slab, Form work & Steel structure
design failure

OBJECTIVES OF THE PLAN:


 To control the emergency, localize it and if possible eliminate it.
 To avoid confusion, panic and to handle the emergency with clear cut actions.
 To minimize loss of life and property to the plant as well as to theneighbourhood.
 To make head count and carry out rescue operations.
 To treat the injured persons.
 To preserve records and to take steps to prevent recurrence.
 To restore normalcy.

EMERGENCY CONTROL CENTRE

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 17 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

For the purpose of handling emergency, the following Emergency Control Centres shall be
identified.During normal working hours - The Administrative Office / Project In charge Office.
All communications to and from will originate at this CONTROL CENTRE. The Emergency Control
Centre will have the following: -
 A copy of ON-SITE EMERGENCY PLAN.
 List of important telephone numbers such as Police, Fire Brigade,
Hospitals, and other outside Emergency Services, etc.
 List of key Personnel with addresses and telephone numbers.
 List of Fire and Search & Rescue Members .
 Project layout indicating storage of hazardous materials and location
emergency equipment.
 List Fire Extinguisher.
 List of Personal Protective Equipment
 First Aid box.

ASSEMBLY POINTS
In case of an EMERGENCY the employees should assemble near the defined Assembly Points.

TRAINING AND EDUCATION


 Experience with on site –emergency planning has proved the need of training and
rehearsal.
 Major emergency procedure shall be laid down clearly and convincingly to everyone on
site particularly Key Personnel and Essential workers.
 It is obvious that training is essential.
 The duties and responsibilities of each person and the emergency procedure to be
followed by him should be very clear.
 Seminar: Seminar is conducted in house/. Site controller will explain the plan to all
associated concerned employees.
 Expert from outside explain the plan to all associated concerned employees. Expert from
also may be invited to impart training.
 Thus everyone is conspicuous about his role in the Emergency Plan.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 18 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

MOCK DRILL
1. Inform all the employees about mock drill.
2. Fix the date for mock drill.
3. Observers will not be involved in the exercise. They will monitor the Mock drill.
4. Emergency Siren / alarm will be raised.
5. After hearing the Siren / alarm, Emergency procedure will be followed as
mentioned in the OEP.
6. Observer will note down the activities with respect to the time.

UPDATING THE PLAN


1. As and when required the Emergency Management plan will be updated.
2. After each drill the plan will be thoroughly received to take account of shortcoming
and accordingly plan will be updated.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 19 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

EMERGENCY ACTION PLAN

ANY ONE NOTICING EMERGENCY SITUATION LIKE FIRE, EXPLOSION, LAND SLIDE, COLLAPSE
OF STRUCTURE ETC. MUST
DO’s
1 The nearby person/employee by shouting “HELP – Attract FIRE “
2 Seek help from the persons working nearby.
3 Try to control the incident at its initial stage with available means/sources quickly.
4 Inform team leader about the Incident.
DON’Ts
1 Do not panic.
2 Do not run – Walk fast.

WORK INCIDENT CONTROLLER MUST


DO’s
A. IF FIRE / OTHER INCIDENTS ARE CONTROLLABLE
1 Approach the emergency site immediately taking note of wind direction.
2 Assess the situation.
3 Inform Security Officer, Tell – NAME, TYPE OF INCIDENT, ACTION TAKEN, HELP NEEDED
and Order Security Officer/Guard to inform all KEY persons.
4 Take lead in controlling emergency until such time concerned Section Manager takes
over the charge.
DON’TS
1 Do not panic.
2 Do not lose temperament.

B. IF FIRE/OTHER INCIDENTS ARE NOT CONTROLLABLE


In Addition to Above (A)
Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP
Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 20 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

1 Organize Firefighting / rescue team members to control the Incident.


2 Take stock of situation if required stop construction in affected area.
3 Call Fire Brigade if situation demands.
4 Evacuate affected area.
5 Organize head count of the plant.
6 Act as INCIDENT CONTROLLER till such time senior person takes charges as indicated in
Emergency organisation

SECURITY OFFICER
DO’s
 Do not allow any vehicle to come inside the site.
 Do not entertain any outside call except for emergency purpose.
 Do not allow visitors to move around.
 Inform all key persons about location and type of emergency.
 Follow this sequence – Inform concerned Team leader, Main Site Controller, Main Incident
Controller and other KEY persons.
 Inform Main Site Controller about Government visitors, if any.
DON’Ts
 Do not entertain any outside call except for emergency purpose.
 Do not allow visitor to move around.

SECURITY GUARD
DO’s
 Immediately report at Security Gate in shortest possible time.
 Follow instructions of Officer In-charge.
 Assist in controlling emergency.
 Assist in controlling contractors, vehicle movement and mob.
 Assist in cordoning off the area.
 Take note of wind direction while approaching emergency site.
 Render all possible help for controlling overall situation.

DON’T

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 21 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

 Do not leave the site unless asked to do so.

EMERGENCY VEHICLE DRIVER


DO
 Immediately start vehicle and reach rescue squad assembly point (near security gate).
 Rescue squad members to emergency site.
 Take vehicle near to emergency site as directed.
 Take note of wind direction.
 Reverse the emergency vehicle for quick transports of injured, if any.
 Keep vehicle engine running.
 Always be on Driver’s seat of the vehicle.
 Take the injured to the hospital as directed.
DON’Ts
 Do not leave the vehicle.
 Do not take the vehicle very near to the site.

WORK INCIDENT CONTROLLER


DO’s
 Approach emergency site as early as possible taking note of wind direction.
 Take stock of situation.
 Interact with all concerned departments as the situation demands.
 Keep Main Site Controller informed about the latest emergency situation on continuous
basis.

WORK EMERGENCY CONTROLLER


DO’s
 Approach to emergency control centre / assess the situation.
 Consult Incident Controller.
 Consult advising Committee Members.
 Instruct Main Incident Controller.
 Communicate to regional head and Govt. authorities, if required.
 Decide upon need for evacuation and blow `Disaster Siren’.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 22 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

 After getting satisfied with the situation, give instruction to blow ALL CLEAR Siren.
DON’Ts
 Do not instruct to blow ALL CLEAR siren unless the situation is fully under control.
 Don’t evacuate the entire plant unless the situation demands.

FIRE FIGHTING SQUAD ON HEARING SIREN


DO’s
 Inform fellow employees/Officers.
 Report to Fire Squad Assembly point.
 Find out emergency location.
 Approach emergency site immediately.
 Take quick action as per the instructions from Incident controller.
 Bring emergency under control as early as possible.
DON’Ts
 Do not leave process/equipment in UNSAFE CONDITION.
 Do not leave emergency site unless ALL CLEAR siren blown.
 Do not use improper fire extinguisher.
 Do not be panicky.

RESCUE SQUAD
DO’s
 Report to assembly point near Gate.
 Get in touch with security about location and type of emergency.
 Approach emergency site quickly with Breathing Apparatus set and First Aid box.
 Get in touch with incident controller.
 Follow instructions of Incident controller.
 Render first aid to the injured, hospitalize, if required.
 Accompany him to hospital and assist Doctor / Nurse.
 Search for missing person in that area, if required.
 Help in head count.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 23 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

ALL GENERAL EMPLOYEES EXCEPT THOSE WHO ARE IN EMERGENCY


ORGANIZATION ON HEARING SIREN
DO’s
 Be alert and be available if required.
 Wait for further instructions.
 Bring down from the building / plant/ equipment in SAFE CONDITION in case of DISASTER
siren as per instructions from Incident Controller.
 Approach respective safe assembling points route as taking note of wind direction.
 Help in taking roll call.
 After hearing ALL CLEAR, go back to the departments.
 Start the work again after setting instruction from Incident controller.
DON’Ts
 Do not be panicky. Do not run.
 Do not approach emergency site unless asked for.
 Do not engage telephone except for emergency purpose. Keep lines free.
 Do not smoke

TECHNICAL TEAM: ENGINEERING DEPARTMENT / ENVIRONMNET,


SAFETY AND HEALTH DEPARTMENT ON HEARING SIREN
DO’s
 Be available in Engineering Department at respective location for any help.
 Approach emergency site with required with tools and equipment and should work on
instructions of Incident controller.
 Help Incident Controller to provide technical assistance.
 Isolate lines, process equipment, if required by Incident Controller.
 Provide emergency equipment like Fire Extinguisher, Hoses, etc., if asked by Incident
Controller.
 Provide stop gap arrangements as per the requirement of Incident Controller.
 Carry out electrical isolation of area as per instructions from Incident Controller.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 24 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

 Mobilized de-watering pump/ Earth moving equipment etc as per instruction of incident
controller.

ADVISORY COMMITTEE (ALL DEPARTMENT HEADS)


DO’s
 Approach emergency site as early as possible.
 Render advice to Main Incident Controller and Main Site Controller to control emergency.

COMMUNICATION COMMITTEE – (P&A)


DO’s
 Consult Main Site Controller
 Give necessary instructions to security / Telephone Operator.
 Give instruction to Security to control traffic / crowd.
 Look after injured; communicate with the family members, if situation demands.
 Arrange transportation, if required.
DON’Ts
 Do not communicate to any one or brief press without permission of Main Site Controller.

GENERAL INTRUCTIONS
DO’S
 Stop work at height. / Stop all hot works.
 Stop all vessel entry.
 Take note of wind direction.
 On hearing Disaster Siren evacuates as per evacuation route without running and panicky
and assembles at respective safe Assembly Points.
DON’Ts
 Do not use telephone except for emergency purpose.
 Do not start work at height, vessel entry, hot work unless permit conditions are verified.
 Do not allow unauthorized person to approach emergency site.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 25 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

OTHER EMERGENCY SITUATIONS


Rescue of employee from height:
a) If anyone fell unconscious on a platform, allow him to lying down on the platform.
b) Check whether breathing is regular
c) Ask for ambulance
d) Call the Engineer In-charge
e) Arrange for rescue from the platform

If anyone found hanging with safety belt from a structure, made him comfort
a) Encourage him with your word
b) Approach the platform from where he fell or nearby overhead platform
c) Try to rescue him by pulling
d) A crane / hydra may be used, if found convenient to, rescue him

Rescue of Injured employee:


a) Recover the person from the place of incident, if possible
b) Comfort him
c) If he is senseless, check whether the person is taking breathe.
d) Call the ambulance at once. Inform Engineer In Charge for the job & Safety personnel
e) If situation demands, call any vehicle, taxi or rickshaw, rush to nearby hospital

Electrocution:
Switch off all power sources
 Switch off all power sources touching the persons
 Assess the injury. Administer First-Aid
Communicate to agencies and call for help
 Communicate to Police, Fire and Ambulance. Also communicate to client/govt.
authorized person

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 26 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

Arrange for medical assistance including First-aid


Arrange for medical assistance
 Assess the injury. Administer First-Aid
 Arrange for transporting to listed hospitals.
 Remove debris/equipment or any other material. Use the designated lifting appliances
available.
Post incident activities
 Communicate to Governmental agencies.
 Communicate to the insurers.

8 LABOUR MANAGEMENT
8.1 Labor Camp: Labor shall live in rented accommodation of nearby area of construction site and
shall move to site through public transport.
8.1.1 Medical Fitness and Medical Aids :Pre-employment and periodical medical examination
will be carried out and An arrangement with local recognized Hospital will be made
8.1.2 Identification & Access Control: Valid ID-card for all staff and workers shall be provided as
per the format receivedfromClient.

9 MATERIAL MANAGEMENT:
 Scrap collected shall be sent to scrap yard
 During transportation, all precautions are taken to handle the items of all equipment
and materials properly.
 During pick up and local transportation, the items are lifted carefully as per the
handling instructions.
 The items are stored such that they are protected from rain, moisture and pilferage as
required.
 Environmental factors, as appropriate, are also taken care of in order to avoid
damage while in transit.

10 EHS TRAINING

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 27 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

The objective of EHS training is to equip personnel with the knowledge, skill and attitude, which
will enable them to perform duties in a safe manner.

PROCEDURE: All workers and supervisors are required to be trained in the potential aspects
and hazards that may exist on a construction jobsite, elimination of aspects & hazards and the
procedure to be followed to perform all work safely.

The Safety Engineers / Supervisors shall liaise with the Construction Department and maintain a
programme for the training of workers to meet EHS Plan and statutory regulations.

SAFETY INDUCTION PROGRAMME


All new personnel shall receive a SHE Induction briefing on basic EHS requirements of the project
and significant features of the construction work relating to the Safety, Health & Environment
when s/he arrives at site

TOOLBOX TALK
Toolbox talk shall be done by execution Engineer and EHS personnel shall ensure that it is being
done regularly.

TRADE AND SKILL TRAINING


Training is necessary to understand the full scope of responsibility for the position assigned often
many of the incident that occur are the resulting of inadequate training the types of issue that to
be considered in identifying training needs are:

Basic orientation training:


 Personnel protective equipment.
 Working at heights.
 Accident /incident/dangerous occurrence / near miss reporting procedures.
 Emergency escape
 Fire safety.
 Electrical safety

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 28 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

 Health & hygiene


 Housekeeping
 Unsafe act / unsafe condition.
 First – aid
 Safe driving within project premises
 Disposal of debris from height
 Alcohol & drug
 Group behaviour towards safety (each worker to look for unsafe act/procedure and report
to safety officer)
 Roles & responsibility of workers, supervisor, engineer,manager.

11 EHS BUDGET
Shri Krishna Engineers shall commit for the continuous EHS Monitoring, Occupational Health
Check-ups for each employee, Adequate PPE, EHS Training (Audio/ Video) on various aspects
from Internal/ External agency according to the training need identified at project/ corporate
level, Reward and Recognition for the motivation of the workforce and conduct mass
management programme.

12 EHS PERFORMANCE TRACKING & CLIENT REPORTING


It will be maintained according to the given format by client.

SAFETY SLOGAN

“THINK SAFETY WORK SAFELY”.

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 29 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 30 of 31
ENVIRONMENT, HEALTH & SAFETY PLAN
Project : AIPL JOY CENTRAL SECTOR 65 GURGAON

Client: ADVANCED INDIA PROJECTS LIMITED


Contractor : SHRI KRISHNA ENGINEERS

Prepared by Approved by Doc.No.: SKE/AIPL/ EHSP


Rev. No. 0
Sachin Samal Dated: 20.01.2020
Project Coordinator EHS HEAD
SKE AIPL Page 31 of 31