Professional Documents
Culture Documents
Pow and Bill of Materials
Pow and Bill of Materials
DEPARTMENT OF EDUCATION
Region VII, Central Visayas
DIVISION OF BOHOL
District of Guindulman
Date:
PROGRAM OF WORK
Repair of Classroom
I.0 11,180.00 - 8,600.00 ### -
Flooring
A. Direct Cost
1. Materials 8,600.00 - - 8,600.00
2. Labor (Manual) 30% - 2,580.00 - 2,580.00
Sub-total 8,600.00 2,580.00 - 11,180.00
B. Indirect Cost
3. Eng’g. Supervision - - - -
4. Contingencies - - - -
Sub-total - - - -
Grand Total 8,600.00 2,580.00 - 11,180.00
Page 1 of 3
Signature over Printed Name of End-User School Principal/School head
Page 2 of 3
Republic of the Philippines
DEPARTMENT OF EDUCATION
Region VII, Central Visayas
DIVISION OF BOHOL
District of Guindulman
Date :____________
Item DepEd NGO
Qty Unit Particular Unit Cost Total Cost (MOOE) LGU PTA
No.
1.0 Repair of Classroom Flooring
20 bags Cement 280.00 5,600.00 5,600.00 - - -
2 cubic Sand 1,500.00 3,000.00 3,000.00 - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Material Cost 8,600.00 8,600.00 - - -
Labor Cost 2,580.00 - - 2,580.00
Grand Total 11,180.00 8,600.00 - 2,580.00 -
Prepared by:
APPROVED:
Page 3 of 3