2. How to put foundation on the plot? 3. How to put size , depth of the Pit ( Gaddha) ? 4. What is “PCC” (Plan Cement Concrete) ? 5. Treatment of “ Termite “( Dimak) in foundation. 6. What should be “ PCC Ratio” ( 1:3:6 or 1:4:8) ? 7. What is meaning of (1:3:6) ( 1 bag cement+ 3 tagari morum +6 giiti) 8. PCC should be at least 6 incheds thick . 9. Cover block , Coloumn layout marking ? 10.What should be size of “ foundation Jaal” 11.What is “footing beam “ 12.All corner & outer line should have “ footing beam”? 13. What is “ Cepage “ ? 14.Beam overlap and column overlap 15. T – Junction on the beam. 16.What is “ sunken” 17.What is coulum overlap” 18.Cover block to set in slab ? 19.Clear all dirt from the slab ? 20. “ Flight beam” and Latak beam ? 21. To set the chair / Ghodi in the slab ?