House Construction

1. How to “ Mesaure Plot”


2. How to put foundation on the plot?
3. How to put size , depth of the Pit ( Gaddha) ?
4. What is “PCC” (Plan Cement Concrete) ?
5. Treatment of “ Termite “( Dimak) in foundation.
6. What should be “ PCC Ratio” ( 1:3:6 or 1:4:8) ?
7. What is meaning of (1:3:6) ( 1 bag cement+ 3 tagari morum +6 giiti)
8. PCC should be at least 6 incheds thick .
9. Cover block , Coloumn layout marking ?
10.What should be size of “ foundation Jaal”
11.What is “footing beam “
12.All corner & outer line should have “ footing beam”?
13. What is “ Cepage “ ?
14.Beam overlap and column overlap
15. T – Junction on the beam.
16.What is “ sunken”
17.What is coulum overlap”
18.Cover block to set in slab ?
19.Clear all dirt from the slab ?
20. “ Flight beam” and Latak beam ?
21. To set the chair / Ghodi in the slab ?