LANDSCAPE WORKS
FOR
CONTENTS
Form of Tender
Instructions and Conditions of Tendering
Specification and Preambles
Bill of Quantities
Appendix
- List of Tender Drawings
FORM OF TENDER
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
FORM OF TENDER
Landscape Works For
PROPOSED LANDSCAPE DESIGN AT MEDICAL HEALTH CENTRE
UNIVERSITI PUTRA MALAYSIA, SERDANG, SERI KEMBANGAN, MALAYSIA.
Sir,
1. Under and subject to the Conditions of Tendering annexed hereto, the undersigned does
hereby tender and offer to execute and perform the works and provisions and supply all labour
and materials and everything of every kind respectively named, shown, described and alluded
to in, or to be inferred from the Tender Documents and Drawings, to be executed and supplied
to the part of the Contract, for the works above described in conformity with the said Tender
Documents and Drawings and under and subject to the said Conditions of Contract for the form
price named herein below.
2. The undersigned agrees to be bound by and submit to the said Conditions of Contract and
priced Bills of Quantity and agrees that the priced Contract Documents, after rectification of any
errors and agreed by the Landscape Architect, as by the Conditions of Contract provided shall
form the basis for the valuation of interim certificate and any variation or extra work which may
from time to time be ordered by the Landscape Architect.
3. And further, the undersigned agrees to complete the Works within five (5) calendar months for
Alternative Tender “A” and within (10 months) all from the Date of Possession of Site or within
any extended period as provided for in the Conditions of Contract.
4. And further, the undersigned agrees that until a formal agreement is prepared and executed,
this tender, or tender adjusted by agreement together with your written acceptance shall
constitute a legal and binding contract between us.
5. The undersigned confirms, after personal scrutiny, that the Tender Documents and Drawings
used by the undersigned in compiling this tender are true copies of the said Tender Documents
and Drawings included in the Tender Table Documents.
Signature of Tender:
Malaysia
Date: 10/12/2019
Witness to signature:
Of Tenderer:
Malaysia
Date: 10/12/2019
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
COLLECTION
1.1 The Contractor shall trim grass, clear and remove from the site and
at adjacent site (if any ) and dispose off at his own dump all rubbish,
waste and superfluous materials arising from the works and leave the
site in a clean state acceptable to the S.O.
2.1 The Contractor shall engage a Licensed Surveyor to carry out as-
built survey to record the actual construction details of the Works and
the Licensed Surveyor shall prepare and endorse the as-built drawings.
1.0 The Contractor shall be full responsible for compliance with the
local and other Authorities acts, JKR, TNB, JBA, JPP, etc., notices
apply for all necessary permits, licenses etc., pay all fee required,
display permits, licenses etc., renew if expired throughout the contract
period. He shall pay and indemnify Majlis Perbandaran Nilai against
any charges demandable by law thereunder in respect of the Works.
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 1 ; PRELIMINARIES
1.1 The Preliminary items as set out here under are deemed to
appley to the whole of the works all as shown on the
drawings and/or described in this Document and the
Contractor shall allow for complying with same and for any
cost in connection there with
2.0 Definitions
3.1 The contractor shall note that his workers must only be
confined within the site given and shall not cause any
inconvenience to the operation of adjoining works during the
currency of this contract which may be done by different
Contractors. The Contractor shall also allow the Client’s
worker to install any plant, etc during the currency of the
contract and no claim shall be entertained for any
inconveniences arising there from.
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 1 : PRELIMINARIES
GENERALLY
FORM OF CONTRACT
This is firm price contract except for prices of cement, steel, aggregates,
sand, bricks, timber, glass, ceiling materials, roofing materials, steel and
metal sections, plumbing materials, floor and wall tiles, sanitary fittings,
ironmongery and paint here in after specified.
CONTRACT DOCUMENT
CONTRACT DOCUMENT
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 1 : PRELIMINARIES
B The tenderer shall refer to the full documents of the Standard Form of
Contract for full information
D Clause No. 1
E Clause No. 2
Contract Period
F Clause No. 3
G Clause No. 4
H Clause No. 5
S.O’s Instructions
J Clause No. 6
Scope Of Contract
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 1 : PRELIMINARIES
GENERALLY
A Clause No. 7
Contract Sums
B Clause No. 8
Contract Documents
C Clause No. 9
D Clause No. 10
E Clause No. 11
Inspection Of Site
F Clause No. 12
Programme Of Work
G Clause No. 13
H Clause No.14
I Clause No.15
BILL NO 1 : PRELIMINARIES
GENERALLY
A Clause No. 16
B Clause No. 17
C Clause No. 18
Insurance of Works
D Clause No. 19
Setting Out
E Clause No. 20
F Clause No. 21
G Clause No. 22
Design
H Clause No. 23
Employment Of Workmen
(a) The contractor shall maintain and furnish to the S.O a full list of
all his workmen including all workmen employed by sub-
contractors and nominated sub-contractors employed in or in
connection with the Works.
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 1 : PRELIMINARIES
GENERALLY
A Clause No. 24
Variations
Valuation of Variation
C Clause No. 26
Bill Of Quantities
D Clause No. 27
Measurement Of Work
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 1 : PRELIMINARIES
GENERALLY
A Clause No. 28
B Clause No. 29
C Clause No. 30
Fluctuation Of Price
D Clause No. 31
E Clause No. 32
F Clause No. 33
G Clause No. 34
H Clause No. 35
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 1 : PRELIMINARIES
A GENERALLY
(i) (c) The locally manufactured materials are listed in the ‘Senarai
Bahan – bahan Binaan Tempatan’ , issued by Kumpulan
IKRAM Sdn. Bhd for civil engineering materials or approved by
Kementerian Belia Dan Sukan for other materials before they
can be accepted for use in the Works by the S.O. Testing and
certification by other testing body may be allowed with the
S.O’s approval.
(ii) (d) If the Contractor fails to comply with this requirement, the
materials supplied shall be rejected and displinary action shall
be imposed upon the Contractor.
(iii) (a) Materials and workmanship shall comply with the British
Standard wherever applicable and shall be approved by the
S.O. The Edition current at the date of closing of the tender is
implied in each case. The Contractor shall not alter or amend
any of the descprition of materials in the Bills of Quantities and
except where expressly provided to the contrary, any offers of
alternative material still render the tender laibvle to
disqualification. Where in the Bills of Quantities any goods or
materials specifies, such are to be considered as being the
minimum standard acceptable. In the event of the S.O. allowing
the substitution of any of the materials during the course of the
Contract, such substitution shall be accompanied by a
corresponding deduction in cost unless the S.O Otherwise
directs.
(iv) (b) The Contractor shall at his own cost and expense, submit
samples of materials and fitting for approval as when required
by the S.O., all samples which are approved shall be the
measure of the standard to be maintained in the execution of
the works.
(v) (a) Not with standing the foregoing, all materials used in or in
connection with the Works shall be obtained from within the
district or state where the Works is situated. Under no
circurmstance shall materials intended for use in or in
connection with Works is situated unless the S.O is satisfied
that these are not procurable from the said district or state.
(vi) (a) The contractor shall place his orders for specified materials
at the earliest possible date after notification of acceptance of
tender or at such times as may be specifically stated elsewhere
here in for any particular materials.
(vii) (b) The Bills of Quantities shall not be used as the basis for
ordering any materials
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 1 : PRELIMINARIES
A GENERALLY
(c) If the Contractor fails for any reason to supply any materials which he has
contracted to supply or if he fails to supply any such materials in suffucuent time to
enable the Contract to be completed by the date fixed for completion, then in
either event the Government may supply any portion or all of such materials. If the
Government supplies such materials the cost in respect thereof which shall be
bourne by the Contractor shall be:-
EITHER the Current Market Rates,
Or
The Actual Cost to the Government at the rate of Supply plus (+) 25.0% for the
necessary overhead and other charges,
WHICHEVER IS GREATER.
The cost to be borne by the Contractor as above shall be deducted from any
money due or to become due to the Contractor under this Contract and the
Contract Sum shall be adjusted accordingly. No action by the S.O under this
Clause shall be deemed in any way to affect or modify the right of the Government
to a claim for damages in the of the Contractor’s failure to complete.
A Clause No. 36
Inspection And Testing Of Materials, Goods And Equipment
B Clause No. 37
Constructional Plant, Equipment, Vehicles And Materials
C Clause No. 38
Possession Of Site
D Clause No. 39
Completion Of Works
E Clause No. 40
Damages For Non-Completion
F Clause No. 41
Sectional Completion
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 1 : PRELIMINARIES
GENERALLY
A Clause No. 42
Partial Occupation / Taking Over By Government
B Clause No. 43
Delay And Extension Of Time
C Clause No. 44
Claims For Loss And Expense
D Clause No. 45
Investigation By The Government And Other Persons in Case Of Accident,
Failure, Or Other Event
E Clause No. 46
Access For Works, Etc
F Clause No. 47
Sub-Contract Or Assignment
(i) Where the Contractor proposes sub-contract any portion of the
works, the written consent of the S.O shall not be given where the
proposed sub-contractor is not himself a contractor registered with
the Pusat Khidmat in the class eligible for similar work up to the
value of the proposed sub-contract work unless otherwise specified
herein.
G Clause No. 48
Defects After Completion
H Clause No. 49
Unfulfilled Obligaions
J Clause No. 50
Suspension Of Works
K Clause No. 51
Events And Consequences Of Default By The Contractor
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 1 : PRELIMINARIES
GENERALLY
A Clause No. 52
Termination On National Interest
B Clause No. 53
Termination On Corruption
C Clause No. 54
Payments Upon Termination
D Clause No. 55
Certificate Of Termination Costs
E Clause No. 56
Surviving Rights
F Clause No. 57
Effect Of Force Majeure
G Clause No. 58
Site Agent And Assistants
(a) Notwithstanding anything herein or elsewhere contained, the Contractor
shall engage and/or appoint a competent Site Agent to provide all
necessary superintending over the whole site operation for the full
duration of the Contract and as long thereafter as the S.O. may consider
necessary for the proper fulfilment of the Contractor’s obligations under
the Contract. He must be competent in English and/or Bahasa Malaysia
and be a competent and qualified member of the professional group
(viz. Engineer, Architect or Quantity Surveyor) having a comprehensive
theoretical background, suitable qualification and experience approved
by the S.O.
(b) The Site Agent shall be constantly on the Works and shall devote the
the whole of his time to the superintendence of the Works. Should the
S.O. find him unsuitable for any reason whatsoever, the Contractor shall
as soon as practicable after receiving such written notice from the Site
and shall thereafter employ and/or engage another to the approval of
the S.O
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 1 : PRELIMINARIES
GENERALLY
A Clause No. 59
Nominated Sub-Contractors And / Or Nominated Suppliers
B Clause No. 60
Payment To Nominated Or Sub-Contractor Or Supplier
C Clause No. 61
No Liability Of Government To Nominated And / Or Sub-Contractor Or Supplier
D Clause No. 62
Responsibilities Of Contractor To Nominated And / Or Sub-Contractors or
Suppliers
(i) The Contractors shall be fully responsible for all sub-contractors and
any delays or damage thereby occasioned and shall be responsible for
the supervision and administration of all sub-contracts in accordance
with Conditions of Contract and shall be required to arrange for the
execution of and schedule the work with each of nominated firms. The
schedule shall be subjected to the approval of the S.O.
(ii) The Contractor shall allow in his tenders price for the attendance and
facilities upon all nominated sub-contractors and such attendance and
facilities shall include for the following:-
(a) Ascertaining from Nominated Sub-Contractors all particulars relating to
their work in regard to sizes of and positions in which chases, holes,
mortices etc. are required to be formed or left.
(b) Making good of walls, ceilings, floor, roof etc. and finishes thereto
including touching up of all paintwork necessitated, damaged or
distributed by the Nominated Sub-Contractor’s Work
(c) Supplying all setting out information.
(d) Giving all necessary dimensions and taking responsibility for their
accuracy
(e) Affording free and full use of standing scaffolding whilst it remains
erected on the site.
(f) Affording free and full use of storage accommodation for materials,
equipment and plant which area for incorporation into the Works and/or
require protection against weather and deterioration, messrooms,
sanitary accommodation and welfare facilities.
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 1 : PRELIMINARIES
A GENERALLY
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 1 : PRELIMINARIES
GENERALLY
(d) Provision of fuel, gas steam, oil lubricants chemicals and everything else
necessary (other than water and electricity) for the test running and
commissioning of the Sub-Contract Works
(e) Any scaffolding, staging etc that are required for the Sub-Contract Works not
covered by paragraph (ii) (e) above
(iv) The words ‘FIX ONLY’, where used in the Bills in connection with any
materials or goods supplied by nominated suppliers, shall be understood to
include:-
(a) Taking delivery
(b) Unloading, getting in, storing and protecting.
(c) Taking from store and placing in position including all hoisting etc required
(d) Assembling and fixing
(e) Returning all chargeable packing, carriage paid and recovering all appropriate
credits.
(f)
A Clause No. 63
Intellectual Property Rights
B Clause No. 64
Antiquities
C Clause No. 65
Arbitration
D Clause No. 66
Notice, etc
E Clause No. 67
Amendment
F Clause No. 68
Confidentially
G Clause No. 69
Stamp Duty
H Clause No. 70
Severability
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 1 : PRELIMINARIES
Amount
Item Description
(RM)
GENERALLY
A Clause No. 71
Waiver
B Clause No. 72
Laws Applicable
C Clause No. 73
Successors Bound
D Clause No. 74
Epidermics And Medical Attendance
E Clause No. 75
Technology Transfer
F Clause No. 76
General Duties And Performance Standard
G Clause No. 77
Restriction And Procedure On Use Of Imported Materials And Goods
H Clause No. 78
Time
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 1 : PRELIMINARIES
Amount
Item Description
(RM)
GENERALLY
A CONTRACT ADMINISTRATION
1.1 Before commencement of the Works, the Contractor shall employ a qualified and
licensed Land Surveyor to set out anf to confirm points and bench marks, including
all necessary labour, rods, pegs, instruments and attendance required by the S.O
for purposes of checking.
1.2 The Land Surveyor shall locate the correct boundary stones demarcate the site
boundaries, record the site levels, demarcate the building lines, the alignments and
the extent of infrastructure Works and confirm all necessary points.
1.3 The Contractor shall submit two (2) certified signed by the Land Surveyor, as built
surveyed setting out plan, on completion of the setting out.
2.1 The Contractor shall submit to the S.O for his approval programme using latest
Microsoft Project, showing the order of procedure and method in which the
Contractor proposed to carried out the works and shall whenever required by the
S.O’s representatives, furnish for his information particulars in writing of the
Contractor’s arrangements for carrying out of the works and of the constructional
plant and temporary works, if any, which the Contractor intends to supply, us or
construct as the case may be.
2.2 The submission to and approval by the S.O or the S.O’s representatives of such
programme or the furnishing of such particulars shall not relieve the Contractor of
nay of his duties or responsibilities under this contract.
3.1 The Contractor shall prepare and submit daily progress report for the work at monthly
and weekly basis intervals. The S.O representatives shall validate the reports and
the Contractor shall make all amendments required to the report. The Contractor
shall allow for making three (3) colour copies of these report the distributions to all
parties. The Contractor shall prepare, maintain, coordinate and control the planning
programming, scheduling and time implications of his project responsibilities.
4.1 The Contractor shall provide coloured progress photographs size 4R showing
different angle of the site and the associated external works as instructed by the
S.O and shall be taken at monthly intervals during the currency of the contract.
The photo in form of CD shall be submitted together with the progress report
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 1 : PRELIMINARIES
Amount
Item Description
(RM)
GENERALL
Y
A CONTRACT ASMINISTRATION (Cont’d)
5.1 The Contractor shall prepare six (6) set of Document and submit the completed
Contract Document to the Majlis Perbandaran Nilai.
B TEMPORAY WORKS
1.0 Temporary Building
1.1 The Contractor shall provide and maintain temporary office and sheds, for use
during the execution of the works, at the locations as approved by the S.O relocate
and re-erection if necessary, remove them on completion of the works and pay all
charges in connection therewith.
1.2 These sheds and the fixtures therein shall remain the property of the Contractor on
completion.
- Adequate lock-up weather proofed shed for safe storage of building material.
Sheds for storage of cement shall have the floor raised at least 300mm above
ground level.
- Adequate sheds and messrooms for workmen with adequate lighting and
ventilation all to the approval of the Local Authorties.
-
2.0 Temporary Lighting and Power
2.1 The Contractor shall provide adequate temporary lighting and electrical power
including the use of generator sets for use on the Works including any normal power
required by all Nominated Sub-Contractors and for testing, test running and
balancing of all Specialist Installations included in this Contract, pay all charges and
clear away apparatus on completion.
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 1 : PRELIMINARIES
Amount
Item Description
(RM)
GENERALLY
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 1 : PRELIMINARIES
Amount
Item Description
(RM)
GENERALLY
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
SITE PREPARATION
EARTHWORK
BILL NO 3 : SOFTSCAPES
SOFT LANDSCAPING
Note:
1.The landscaping shall only be carried
out by specialist landscape contractor
appointed by the contractor and
approved by the S.O
A Delonix regia No
B Cinnamomum verum No
C
Cananga odorata No
D
Citrus hystrix No
E
Jacaranda obtusifolio No
F
Plumeria obtuse No
G
H Eurycoma longifolia No
No
I Averrhoa bilimbi
No
J Pterocarpus indicus
No
K Juniperus chinensis
No
L Syzgium oleina
To collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 3 : SOFTSCAPES
TREES (cont’d)
A Delonix regia
B Cinnamomum verum
C Cananga odorata
D
Citrus hystrix
E
Jacaranda obtusifolio
F
Plumeria obtuse
G
Eurycoma longifolia
H
I Averrhoa bilimbi
J Pterocarpus indicus
K Juniperus chinensis
L Syzgium oleina
PALM
M Livistona endaeunsis
N Cyrtostachys renda
SHRUB
O Pandanus odorus
P Hibiscus sabdariffa L.
Q Aloe vera
GROUNDCOVER
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
S Cymbopogon nardus L
T Cymbopogon citratus
U GRASS
Axonaphus compressus
V HERBACEOUS PLANTS
To collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 3 : SOFTSCAPES
TURFING
A
Spot turfing in ‘axonopus compressus’
(cow grass) including 50mm thick
approved topsoil, schedule
maintenance after planting inclusive of m2
pegging, watering, fertilizing and grass
cutting very 2 months with one final cut
B before handing over.
HOLE EXCAVATION
Supply all labour, equipments, tools No
E and transportation to excavate planting
hole and cart away all excavated
materials from site according to size as
No
F follow:
Trees No
G Hole size: 1000mm x 1000mm x
1000mm
Shrubs
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
Groundcovers
Hole size: 200mm x 200mm x 200mm
H
BACKFILLING OF PLANTING HOLE
Supply all labour, equipments, tools
I and transport for backfilling 2/3 top soil
mixture and 1/3 organic material into
planting hole according to size as
follow:
J
Trees
Hole size: 1000mm x 1000mm x
1000mm
Shrubs
Hole size: 300mm x 300mm x 300mm
Groundcovers
Hole size: 200mm x 200mm x 200mm
To collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 3 : SOFTSCAPES
MULCHING
Supply all labour, equipments, tools an
transportation for mulching around
based of planted trees and shrubs with
approved friable composted material at
50mm thick within
C
Shrubs area m2
D
Groundcover area m2
ROOT BARRIER
E Provide 18” height tree root barrier
using polyethalene with deflector root
for Lagerstromea florirunda and Salix
BAbylonica ( hujan-hujan) as per
Architect’s drawing no. No
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
BILL NO 3 : SOFTSCAPES
COLLECTION
Page LW/SOFT/1
Page LW/SOFT/2
Page LW/SOFT/3
Page LW/SOFT/4
Plain concrete
Ground beam
kg
G 12mm diameter rod (circular on plan) 286
kg
H 12mm diameter rod 152
Sawn framework m²
L Ground beam (circular on plan) 63
M Ground beam m²
30
To collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
Floor Construction
A m2 167
200mm Thick hardcore; spread levelled and
compacted
B m2 167
50mm thick lean concrete to received concrete
C m2 167
Concrete grade 30; 100mm thick to floor
D m2 167
Fabric reinforcement BRC A8
F m 47
12mm thick movement joint infill with bituminous
Felt for concrete floor slab
G Finishes m2 167
Approved decorative pebble wash finishes in pattern
Approved by S.O
H
Approved 10mm thick concrete imprint with sand m2 10
stone carving and canna motif and decorative
stainless still vertical element as specified in pattern
approved S.O (Type 2)
J Planter box
1.50m x 1.50m x 0.45m high planter box with stone no 12
cladding and pebble wash finish as per LA’s frawing
and SO’s approval
K Decorative Column
500mm diameter D and 300mm diameter U r.c
concrete column, 2000mm average high, including no 8
100mm thick coping with pebble wash finish and
50mm diameter stainless steel decorative floral motif
on top including concrete footing all as per Engineer
and LA’s drawing and SO’s approval
To Collection
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
COLLECTION
BILL NO 5 : MAINTENANCE
Firming up
Month
Undertake firming up of plants and tree stakes from
D time to during the period and particularly after heavy
rain or wind as specification
6
Pruning
To cut off and remove all dead or injured or infected
branches. Cutting shall be made flush leaving no Month
scrubs and to be with anti fungus paint. All works
E shall be use proper tools. 6
Fertilizing
All fertilizing shall be of approved organic manure or Month
slow releases fertilizers, Method shall pre approved
by the S.O per mont 3
F
Grass Cutting No
Cutting grass every 2 month by hand or machine as
per specification
DAYWORK RATES
Only time on work will be allowed. A ‘day’ is considered to be a normal working day of 8 hours.
Fractions of a day will be paid for “pro- rata”
Contractor
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
1. The rate entered for labour shall be deemed to include all on costs associated with the
employment of such labour including ( inter-alia), head office chargers, overhead chargers,
profit, site expenses subsistence allowances, time lost due to inclement weather, bonus,
holiday and sick pay, and any other employee’s fringe benefit(s), small tools and
consumables stores temporary equipment such as wages, temporary tracks, ladders staging
scaffolding and all items of a similar nature unless there are provided or set up exclusively for
day work.
2. The wages of gangers and leading hands working with their gangs shall be paid for at the
appropriates rates, but the time of walking gangers, sub–foreman and foreman will be
included in the rates entered for labour under site supervision and staff.
3. Payment of overtime work, if chargeable and approved by the S.O. shall be made at the rate
entered herein, but the time so worked as overtime shall be adjusted in the same proportion
as that used for paying the normal workers on the site and approved by the S.O. Thus is a
man works 1-hour overtime for which the rate payable is double time, payment shall be made
for 2 hours at the rate entered in the day works schedule.
*Note: Overtime is working time over and above 8 hours per working day including Saturday
or 48 hours per week.
4. The special cost of special watching and lighting necessitated by day works shall be included
in the rates.
5. The rate entered for plants shall apply only to plant which the contractor has available in the
site. Such rates shall be deemed to include all over head charges, profits, site supervision
and staff, hire chargers fuel, maintenance, consumable stores, spare parts, insurances etc.
but shall exclude the cost of wages for drivers and operators, which shall be payable
separately as dealt with under paragraph 1 above.
6. Payment for mechanically operated plant shall be made only at such times as the plant is
engaged in day work and shall exclude all standing, idle or down time.
7. If any worker or items of plant on day work do not readily belong to any classification included
in the schedule or inserted by the contractors at the time of tendering, the S.O. shall
determine the equivalent classification to be adopted for such worker or items or plant and
payment for such will be made accordingly.
8. The rate inserted by the contractor shall be realistic rates in conformity with those on which
his tender has been based, and shall be based on conditions prevailing at the time of tender
but bearing in mind that claims for escalation will not be entertained.
9. The rate inserted by shall be subject to agreement with the S.O. as to their reasonableness
and subject to such agreement shall be used as day work rates.
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
10. The day work rates entered hereunder and agreed by the S.O. shall not be further subject to
the fifteen percent (15%) addition as stipulated in clause 25(d) of the condition of contract.
11. The Contractor shall produce for verification to the S.O. vouchers specifying the time and
materials employed on the work, if required, the contractor shall also produce his receipted
bills and wages books in support of his accounts.
12. Where special mechanical plant is required for use on day works, the cost to be paid to the
contractor shall be subject to agreement by the S.O.
13. Only time on work actually done will be allowed. A “day” is considered to be normal working
day of 8 hours. Fraction of day will be paid for pro-rata.
14. Rates for power driven tools are not included in the labor rates but changes for hand tools
shall be deemed to be included.
PROPOSED PLANTING PLAN FOR MEDICAL HEALTH CENTER OF UNIVERSITI PUTRA MALAYSIA
PLANT
Person tendering are to enter the size or capacity of Plants they proposed to have on site, where not
stated.
1 BILL NO 1: PRELIMINARIES
3 BILL NO 3: ENTRANCE
6 BILL NO 6: AMPHITHEATRE
8 BILL NO 8: TOILET
TOTAL RM
___________________________ ___________________________
___________________________ ___________________________
LIST OF DRAWINGS