Professional Documents
Culture Documents
Planta de Cimentacion Bloque 11
Planta de Cimentacion Bloque 11
3.25 3.25
2.00 2.00
Pb Pb Pb Pb
Ø5/8"@.175
Pb Pb Pb
Ø5/8"@.175
1 3 3 1 3 3 1 3 Pa 3 1 Pb
2.00
2.00
2.00
2.00
1d 1d
Ø5/8"@.175
1 1
PLACA PL-2 1 3 3
P1 3 3
P1 3 3 1
PLACA PL-2
Ø5/8"@.175
1 1 1 1
3.45
3.45
Ø5/8"@.175 H=0.60 Ø5/8"@.175
NFZ.=+3822.95
Pa Pa H=0.60
H=0.60
Pb H=0.60 NFP. = +3824.65
NFP. = +3824.65 NFZ.=+3822.95 Pb
1 1 4 4 4 4 4 4 NFZ.=+3822.95
NFZ.=+3822.95 1 1
NFP. = +3824.65
Ø5/8"@.175
Ø5/8"@.175 NFP. = +3824.65
2.00 4 4 4 4 2.00
Pa Pa Pa Pa
3 3 3 3
4 4 4 Pa 4 4 4
7.075
7.075
Pa 2 2
Pa Pb
NFP. = +3824.65
2 2
Pb 4 4
Pa Pa
2.00 4 2.00
H=0.60
NFP. = +3824.65 NFP +3824.50 NFZ.=+3822.95
Pa Pa Pa Pa
1 1
Pa 1 1
4
NFP. = +3824.65 NFP. = +3824.65
Pb H=0.60 Pb
NFZ.=+3822.95 H=0.60
2.00 4 4 2.00
H=0.60 NFZ.=+3822.95 4 4
4 4 NFZ.=+3822.95
Ø5/8"@.175
Ø5/8"@.175
3.45
3.45
1 1 1 1
Ø5/8"@.175
1 3 3 1 2 3 3 1
Pa 3 3 1
2.00
2.00
2d 2d
2.00
2.00
Pb 1 3 Pb 3 1 Pb 2 Pb 3 Pa 3 Pb 1 Pb 3 Pb 3 1 Pb
Ø5/8"@.175 Ø5/8"@.175
Ø5/8"@.175 Ø5/8"@.175
3.25 3.25
1e 2e 3e 4e
RESIDENTE GENERAL:
E-77
ING. VLADIMIR L. APAZA CANAZA
" OFICINA REGIONAL DE
SUPERVISION Y LIQUIDACION DE
PROYECTOS " SUPERVISOR GENERAL: