Chapter 32
Final Acceptance Runs and Handover
Check List....................................................................................................................................... 3
Revision 1-30-2005
Chapter 32
Final Acceptance Runs and Handover
2
Installation and Commissioning Manual
Chapter 32
Final Acceptance Runs and Handover
Certificate of Acceptance
For
Item Equipment Reception / Site Installation Date
SIEMENS
After completion of the tests detailed in this Manual, and all
dynamic commissioning, Clients should be in a position to sign
1
the Certificate of Customer Acceptance located in Appendix 24
of this Manual.
L IMPORTANT: The following tests MUST be carried out prior to leaving the site.
SIEMENS Personnel:
Date:
3
Chapter 32
Final Acceptance Runs and Handover
Software
For
Item Equipment Reception / Site Installation Date
SIEMENS
A hard copy of the parameter settings MUST be obtained, and
enclosed with this Manual prior to leaving the site.
Software Parameters Enclosed Signatures
1
SIEMENS Personnel:
Date:
IMPORTANT: It is vital to carry out this task, as commerical interest are often at
stake.
L The Installation and Commissioning Manual MUST be completed and signed off
prior to demobilising from the site.
The Installation and Commissioning Manual MUST then be returned to the
installation support manager as soon as possible upon return.
Drawings
For
Item Equipment Reception / Site Installation Date
SIEMENS
Any altered drawing(s), either mechanical or electrical, MUST
have it’s details entered onto the Site Modified Drawing List
located in Appendix 25 of this Manual. This list then must be
1 signed off as complete.
The list should then be returned, together with the marked up
drawing(s), with this Manual and handed over at the
Commissioning Debrief.