You are on page 1of 7

SHOPPING COMPLEX-PERINTHALMANNA

SHOPPING COMPLEX AT PERINTHALMANNA


3rd PART BILL Date :02/05/2017
sl.
no Description nos length breadth depth Quantity Remark

FIRST FLOOR
6 Providing and laying R.C.C 1:1.5:3 using 20mm metal including all cost
material and labour charges etc.complete but excluding the cost of steel for
column.
C4 - Gridline B12,J12,L12, 3 0.20 0.40 3.00 0.720
Grid B11 1 0.20 0.40 3.00 0.240
Grid J11 1 0.20 0.40 3.00 0.240
C5 - Gridline D12,H12 2 0.20 0.50 3.00 0.600
Grid B6 1 0.20 0.50 3.00 0.300
Grid D11,H11 2 0.20 0.50 3.00 0.600
C6 - Gridline C10,K10,C7,K7 4 0.50 0.50 3.00 3.000
C6a - Gridline C5C3,K5K3 4 0.50 0.50 3.00 3.000
C7 - Gridline C2C1,K2K1 4 0.40 0.40 3.00 1.920
TOTAL 10.620 M3
9 Providing and laying R.C.C M35 MIX using 20mm metal including all cost
material and labour charges etc.complete but excluding the cost of steel for
slab.

Mainslab 1 11.45 15.80 0.18 32.564


Sunkenslab 1 11.13 3.40 0.12 4.541
TOTAL 37.105 M3
10 Providing and laying R.C.C 1:1.5:3 using 20mm metal including all cost
material and labour charges etc.complete but excluding the cost of steel for
stair.

Main stair
Ground floor & first floor slab 2 1.95 1.85 0.15 1.082
1st flight 8 0.45 0.15 1.50 0.810
Mid landing 1 1.50 1.20 0.15 0.270
2nd flight 8 0.45 0.15 1.50 0.810
Landing 1 1.50 1.50 0.15 0.338
Fire stair 0.000
1st flight 9 0.45 0.15 0.90 0.547
Landing 1 1.10 1.86 0.15 0.307
2nd flight 9 0.45 0.15 0.90 0.547
TOTAL 4.710 M3
12 Providing and laying R.C.C 1:1.5:3 using 20mm metal including all cost
material and labour charges etc.complete but excluding the cost of steel for
sunshade.

Right side of building 1 19.18 0.60 0.10 1.151


Back side of building 1 13.60 0.60 0.10 0.816

Page 1
SHOPPING COMPLEX-PERINTHALMANNA

sl.
no Description nos length breadth depth Quantity Remark
Left side of building 1 16.03 0.60 0.10 0.962
1 1.74 0.60 0.10 0.104
1 3.40 0.60 0.10 0.204
TOTAL 3.237 M3

Page 2
SHOPPING COMPLEX-PERINTHALMANNA

sl.
no Description nos length breadth depth Quantity Remark
13 Providing and laying R.C.C M35 MIX using 20mm metal including all cost
material and labour charges etc.complete but excluding the cost of steel for
beam.

X-direction
Grid line B12 to D12(20X60) 1 1.80 0.20 0.60 0.216
Grid Line D12 to J12 1 8.83 0.20 0.60 0.848
Grid J12 to L12 1 1.81 0.20 0.60 0.217
Grid line B11 toD11(20X40) 1 1.80 0.20 0.60 0.216
Grid D11 to J11 1 8.83 0.20 0.60 0.177
Grid line C1 to K1 1 11.05 0.30 0.65 2.155
Sunken beams 1 11.33 0.10 0.28 0.317
PTB1 90X40 grid line C10 to L10,C7 to
L7,C5 to L5 and in between grid C5 & C3
3 9.15 0.90 0.22 5.435
1 11.45 0.90 0.22 2.267
Expanded side 3 1.26 2.30 0.22 1.913
Grid line B10 to C10 1 1.54 0.20 0.60 0.185
Grid line B5 to C5 (20X75) 1 1.64 0.20 0.75 0.246
Grid line J12 to L12 (20X45) midlanding
1 1.80 0.20 0.45 0.162
beam
Y-direction
Grid line B5 to B6(20X60) 1 2.52 0.20 0.60 0.302
Grid B6 to B10 1 6.13 0.20 0.60 0.736
Grid B10 to B11 1 1.80 0.20 0.60 0.216
Grid B11 to B12 1 2.60 0.20 0.48 0.250
Grid line C1 to C2(20X60) 1 3.47 0.20 0.60 0.416
Grid C2to C3 1 3.56 0.20 0.60 0.427
Grid C3 to C5 1 5.42 0.20 0.60 0.650
Grid line C5 to C7(20X40) 1 4.30 0.20 0.40 0.344
Grid C7 to C10 1 4.06 0.20 0.40 0.325
Grid C10 to C11 1 1.80 0.20 0.40 0.144
Sunken beam(20X40) 3 3.00 0.20 0.28 0.504
Grid line J11 to J12(20X40) 1 3.00 0.20 0.40 0.240
Grid line L1 to L2 1 3.47 0.20 0.60 0.416
Grid L2 to L3 1 3.56 0.20 0.60 0.427
Grid L3 to L5 1 5.42 0.20 0.60 0.650
Grid L5 to L7 1 4.30 0.20 0.60 0.516
Grid L7 to L10 1 4.06 0.20 0.60 0.487
Grid line L10 to L12 1 4.57 0.20 0.60 0.548
TOTAL 21.954 M3
16 Providing and laying R.C.C1:1.5:3 using 20mm metal including all cost of
material and lobour charge etc. complete but excluding the cost of steel for
LIFT WALL

Page 3
SHOPPING COMPLEX-PERINTHALMANNA

16
sl. Providing and laying R.C.C1:1.5:3 using 20mm metal including all cost of
no Description nos length breadth depth Quantity Remark
material and lobour charge etc. complete but excluding the cost of steel for
LIFT WALL
Grid line B10 to B11 1 1.5 0.2 2.4 0.720
TOTAL 0.720 M3
17 Steel Reinforcement bent tied and placed in position including all cost
coveyanve of all material and labour charges etc complete.
100.830 QTL

Page 4
SHOPPING COMPLEX-PERINTHALMANNA

Page 5
ROAD CONCRETE
PULAMANTHOL PANCHAYATH , WARD : 07

Reg.no: 51/13 PERINTHALMANNA


Date:20-02-2018

Item
Length Width Depth Particulars Unit Rate
No

1 120m 3m .12m Providing and laying R.C.C including all cost material and labour
charges etc.complete
M3 11000.00
2 100m 2.8m .12m Providing and laying R.C.C including all cost material and labour
charges etc.complete

M3 11000.00

Page 6
E
WARD : 07

Qty Amount Remark

l cost material and labour

43.200 475,200
l cost material and labour

33.600 369,600

Page 7

You might also like