Scope of Work Project
Scope of Work Project
VII
6 Post Weld Heat Treatmen (PWHT) N/A
7 Positive Material Identification (PMI) N/A
8 Factory Acceptance Test (FAT) X
9 Site Acceptance Test (SAT) N/A
VII
10 Hydrostatict Test
11 Pneumatict Test N/A
12 Over all Tigtheness Test X
13 Load test N/A
14 Pull Test (Painting) X
15 Holiday Test High Voltage DFT>500 Micron(Painting) X
16 Holiday Test Law Voltage DFT <500 Micron(Painting) X
17 Dust Level Test (Painting) X
18 DFT Thickness Check X
INSPECTION
VIII 1 In-hause Inspection X
2 Third Party (PI) N/A
CERTIFICATION
1 MIGAS X
IX
2 DISNAKER N/A
3 ASME STAMP N/A
PACKING FOR TRANSPORTATION
X
1 Standard packing X
TRANSPORTATION
XI 1 From XXX Work shop to site X
2 Insurance for Transportation (if Required) X
TAXES AND DUTIES
XII 1 VAT
2 Pph