TECHNICAL QUERY FORMA
To: MOG O18 Gus (K 820) Limited For the Atenton of The Project Manager
PART A: CONTRAGTOR'S TECHNICAL QUERY
‘CONTRACT NO: TaNo: DATE:
Froot PSGA00-70R-4.001 25052010,
TaTme: PAGE:
‘Bist Clentnees Standor Requirement fore
CLASSIFICATION ‘ORITICALLITY
Essential Urgent Yeo:
Non-esseila Routine
DISCIPLINE / AREA: CorosioniCoatings
“Technical Query Description:
‘Theresa conradton of he basing standard equremont in MPMY-ME-SPC-0208 a8 below:
12) Sesion 73 eat that he basing standard roqred fer Costing Systm 2107s SSPC SP-10or S825
lariat Gaon) aa SSP SPs or 8 3 ae Meal ast Cann) Caing
[To chloe the voqred anchor prof, abrashe parla cue shal folow th surace
breperaon commentary ofthe S€PC mania es pecsssay fo comply with SSPC >.
0, eurlace Praparaton Speciation ~ Neer While metal Blast Cleaning fer Coating
Syoem 20, SSPC SP-8 o Se 2. euraco Propration Spectiaon = Whe rela
lest Cieaning for Coating Sytem 1 and 8.
1) Mesto Costing Syste 1 Tate page 24 and Cotng Sytem 8,8, 84 ane (Page ond
ceed ei eta sandarecaonan eSens
‘Coating System Ba
-appicae to —] Tai or vessel eral ing
Stace prop, —| Blast cering Wo 150 BB0T-1_ 1908, Sa
Surface pote mpi of 76-100 microns
Coating System 8
“epleatie te Tani or vessel eating.
‘Suse prop. | Bast Goarig 6150 B50T-1 198. S32
Stace pote apace of 76100 moneMubadala
Petroleum sapuia?
tat
[TECHNICAL QUERY FORM
To: WD on & Ge (S320) Line Forte Atenon of The Projet anager
PART A: CONTRACTOR'S TEGHNGAL QUERY
‘CONTRACT HO: Ta No: DATE,
Freon Peanco-Tar-+001 2eosz018
Tome page
‘tng Cnsirss Standard Regret Bere
Contin System 86
‘Repicabe Yo | Taio seal infoma ng.
‘Saas prop. | Baal cleaning to 180 B50T1 1988, So2E
Surece profi alge of 7-100 mons
‘Coating System @
‘cae Taio voswa eral Wg
‘Stace prop | Baal closing Wo 150 OH0T-1 THRE, SaZE
‘Surtaceprfie amplitude of 76-100 rons
oating Syotem Be
ppteabie
Surface prep. | Bas cleaning fo 150 6607-1: 1008, Sa 25
Soracs prof empltudeof 76100 irons
incorrect statement
7 a 3 is equivalent
‘Documentation impactod:
ae to SSPC-SP 5 not
4. Palo ati IssPc-sP10
1 Stn Papraton Pala rose :
irate ott bane toe Oma a
Peale nga en suse sce a3 or SECS? 10 routed er ft beatin
Contractors Resormended Soon Bs
‘To avoid any confor confusion regarding the blsting standard requremnt, Conca e proposing
‘andordan tho lasing standard regarement to 882.8. SSPC SP-10 for el the coalrg sytem ives
Benet to Contractor Company
‘Standarzaion ofthe bling tard to S225 without omromising the quel since lating standard
fe 25s rosgtza by al Pent Manufacturer In tom of warrenty purpose.Mubadala 4,
Potroleum sanuis
TECHNICAL QUERY FORM
‘To: MDC Ol & Gee (8K 320) Lied For the Atenton of The Project Manager
PART A: CONTRAGTOR'® TEGHINICAL QUERY
CCONTRAGT NO: TaNo:
Fro Fear corar..oot
Tammie:
Basing Glesrnes Sundae Requerent
‘aio Sh AaB SR Dae OED
Mian
‘Load / Line Manager: | Mustapha Kemal bin “ _ Date: jie
‘Mohd Salleh aa
ProjeetDvecior | Aba Joma in Tab Date
ays [ieop hes auth
a
ny
TECHNICAL QUERY FORK
To: MOG OW & Gas (320) Linea
PART B: COMPANY RESPONSE
{Contractors recommendation "To avold any confit or confusion regardag the
biasing standard requirement, Contractor is proposing to standardize the blasting
standard requirement to Sa 2.5 or SSPC SP. 10 oral the coating system involved - >]
[This proposal isnot acceptable to Company as the type of surface preparation
standard depends on various factors including; coating system, service condlion and [
temperature:
For instance:
(1) Galvanized Stee! (Coating System 11) - Neither Sa 2.5 (SSPC.SP10)nor Sa3
|(SSPC.SP5) required and rather SSPC-SP1 (solvent cleaning) Is good erough
[2) Structural Stee for Splash zone (Coating System 1) - statement in section 7.3 of
the specification applies and it requires Sa 3 (SSPC.SPS)
(3) Tank or Vessel Internal Lining (Coating System 8 )- statement in section 7.2 ofthe
specication applies and it requires Sa 3 (SSPC.SPS)
However Company does acknowledge contradictory requirements of surfce
Jpreparation standard in MPMY- ME-SPC-0203 Rev 2 and suggest that Contractor
prepares a detailed Painting matrix forall applicable coating system forthe project and|
[seek Company agreement on surface preparation standard.
Dicpino Lande] ater
(847A Mages) Tebow 19. 1, Wee
Date
"Eginaoring Menage:
Leon Lim 19 June 2018,
ates
wh [ose
‘Senior Profet Mans
boca Parla
Project anager: ae 4