D332 Rome
D332 Rome
A. L’Abbate
RSE SpA
Deliverable overview
Authorship: RSE
Content mostly based on publicly available information
Contributions from internal TSOs and partners
Contributions from stakeholders
Interactions with
• WP1
• WP3.1
• WP3.2
• WP3.3
• WP3.5
• WP3.6
• WP3.7
• WP2
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 2
Outline
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 3
Transmission planning
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 4
Transmission assets costs
Transmission assets costs depend on various factors:
• equipment rating and type
• operating voltage
• local environmental constraints
• geographical characteristics
• material costs
• manpower (labour) costs
• technology maturity
Capital cost elements for transmission assets:
equipment, installation, engineering, auxiliaries, civil
works, right-of-way, tax, insurance, financing
Operating cost elements for transmission assets:
operation, maintenance, relocation, losses
Other cost elements: land acquisition, local
compensations, dismantling
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 5
Transmission assets costs
Main HVAC transmission assets:
• Overhead lines
• Cables
• Transformers
• Substations
• Reactive compensators
• PST
• FACTS
• Smart lines (RTTR)
• Smart cables (RTTR)
• HTLS (HTC) lines
• GILs
• HTS cables
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 6
Transmission assets costs
Quantitative data on HVAC costs
Average ranges throughout continental Europe
Cost range
System component Voltage level Power rating min max Unit
HVAC OHL, single circuit(1) 400 kV 1500 MVA 400 700
kEUR/km
(1)
HVAC OHL, double circuit 400 kV 2×1500 MVA 500 1000
kEUR/km
HVAC underground XLPE
400 kV 1000 MVA 1000 3000 kEUR/km
cable, single circuit
HVAC underground XLPE
400 kV 2×1000 MVA 2000 5000 kEUR/km
cable, double circuit
Reactive power compensation for
400 kV - 15 15 kEUR/MVAR
HVAC cable line, single circuit
Sources: public data, TSO questionnaire, REALISEGRID WP1 exercise, REALISEGRID D1.2.1
(1) Cost ranges correspond to the base case, i.e. installation over flat land.
For installations over hilly ground a +20% premium has to be considered;
For installations over mountainous land and in urban areas a +50% premium
has to be considered
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 7
Transmission assets costs
7%
30% engineering/studies
20%
installation
equipment
test
8%
compensation
35%
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 8
Transmission assets costs
Country review of HVAC assets costs:
provisional data
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 9
Transmission assets costs
Country review of HVAC assets costs:
provisional data
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 10
Transmission assets costs
Country review of HVAC assets costs:
provisional data
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 11
Transmission assets costs
Country review of HVAC assets costs:
provisional data
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 12
Transmission assets costs
(Source: KTH)
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 13
Transmission assets costs
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 14
Transmission assets costs
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 15
Transmission assets costs
Main HVDC transmission assets:
• Overhead lines/Cables
• Converter stations (CSC/VSC)
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 16
Transmission assets costs
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 17
Transmission assets costs
(Source: NGET)
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 18
Transmission assets costs
(Source: NGET)
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 19
Transmission assets costs
provisional data
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 20
Next steps
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 21
Acknowledgements
REALISEGRID TSOs:
RTE-I, APG, TenneT, Terna
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 22
Thank you for the attention
Contact: Dr. Angelo L’Abbate
Ricerca sul Sistema Energetico (RSE)
Milan, Italy
angelo.labbate@rse-web.it
REALISEGRID project
http://realisegrid.rse-web.it/
2011-04-01 TREN/FP7/EN/219123/REALISEGRID 23