Contract 1: 17000148 (Re-Ad)
Contract Name: Construction of Regional Evacuation Center
Location of the Contract: Poblacion, La Paz, Agusan del Sur
CONTRACT AGREEMENT
NOW ALL MEN BY THESE PaeseNrs:
This CONTRACT AGREEMENT, madetrs_dayof_UEL_ 12 DM yy
re beeen
‘he GOVERNMENT OF THE REPUBLIC OF THE PHILIPPINES throvah the
Department of Public Works and Highways (OPWH)rejresete hein by
POL M. DELOS SANTOS, OIC-Resional Director, duly euthoreed forthe
Purpose, with main offce agcress at J. Rosales Avenue, Butuan city, etenater
Felerred too: the "PROCURING ENTITY";
and:
LEGACY CONSTRUCTION CORPORATION, 2 corporation duly orgeized and
‘sting uncer and by vite of lave of the Repub of the Philippines, with main
cffice address at #1 Calachuchi St, Captehile Subdivision, Bray. 7 (Pob.),
Bacolod City, Negros Ocodenta, Region 6, represented by ALEX H. ABELIDO,
Proprietor, duly authored for ths purpose, hereinafter refered to as the
“CONTRACTOR;"
WITNesseri
WHEREAS, the PROCURING ENTITY is desious that the CONTRACTOR execute the
orks under 47400148; Construction of Regional Evacuation Center, Poblacion,
ta Paz, Agusan del Sur, hereinafter caled "he Works, and the PROCURING ENTE
has actepted the Calculated 8d of the CONTRACTOR forthe execution and completion
of the Werks atthe calculated unt Bd prices shown In the attached Bal of Quantoes, or
42 total Contract Price of Thirty Four Millon Five Hundred Twenty Two Thousand
‘Nine Hundred Thirty Pesos and 18/100 (Php34,522/090,14) eed hereby saree
‘0 complete the contrat within Four Hundred Sixty Five (465) calendar days,
NOW, THEREFORE, for and consideration ofthe foregoing premises, the partes hereto
agree 9 flo:
1. In this CONTRACT AGREEMENT, works and exoressions shall have the same
meanings as are respectively assigned to them in the Conditions of Contract
hereinafter referred t,
2. The folowing documents shall be attached, deemed to form, and be read and
0
| 2 air Sa aa on See
{| 1ncss Pe, stoma, ev, srs 100 | 7725" ] a aed
: ~ ate ne) : |
ED [Toortas Po, rm aa, Pi, Sees 000 | Tera | —m}— aod — waa
au (erbownapo) ve | |
B e° | TONa? i,t a PC, Ses Sa) TRG || — ead’ — TED
; ‘Giese -
[TOROS fi trans we SeTam BD | m8 — a
L ns)
TOBTDAT Fits Sonn da CERO, Te} woDO-| war | —weal sac
bees
[EARS Frcs im da PVC Rion, | SOP Pwr | — Too 5B
z {iste asa) :
BOTT Hees str da PIC Bon, som wack | pad Se
z ~ be 20 cen) dé
2 | TOI Fs mm da xanep, HE TORO wer | red) a
Fg LORE Boon (orcomasau) |* be
BE [Aone ings ton on Pie Geant | 200 wer | — aa 73500
SLR Ferg ioien da VC PTag) [360 eec | ge) aa
{DOIN frees neva Pvc Seay |—S000 wack | — 78 3780
mn Bete omer wats
el
: TOOT tinge tn we PIC Say | -@ODwah | a
3 ce th dl
| 4 TOO Fngs (Cm aa Sea | EU] ee] —Haeoa 97
5 Pre edie Sant y
& CU] bv soe Cement, aa -ar | asa aa
278 ewiooz ptumsine works
BINGE) [2G poypooivenetanan caine Stal | ps] —souay mae
g = (ee, Zona. P20
B SK. [He Poyecsiyere tadom cayman pa — eno 7m
a | (orc) onan 75
a Wl Goa
: [ee a eee i
s fn Sere en)
3 TARO? Frege Parone tandem Wap. | aaa] —a
er PC), 2 PPR
ee ea)
TORE Penge pcahnane Rann TD | a | a6} Tae
spe’ OPC), 2mm Bs | 1
-senapee ete Tat cor |
TRIGA Wate Coe, ones, Calas | DD] ws | T5090 Taran
| a ie Rava case | _see—| aR — og
an pe |
TORTBY jr Sk, Cong Saren)_|_400|-aae | aaos00¢ —aa sana
TOI Latoya Tepraer 7.00200 e800)
ts, Conte Hanan 1
5 beset | a
{TIIORS Ro bran Paes lone gay) AEs] a 0
Sani pee
c— = SubTotal 79,575,983
Dewainen 3.2016 aatiContract 1D: 17N00148 (Re-td)
Construction of Regional Evacuation Center
{Location of the Contract: Poblacion, La Paz, Agusan del Sur
ers "unit ost] Tota Amount
nite bescipton Quanity |Uit Ue ie
1002 PLUMBING WORKS (eant) =a]
Ficoxa) et a TS — a
10022) Stans Sed Gab Sarin da | 12.00 im_| 6 080o| 75.60.
1002(23) "Snover Has Showe Vale 1200 [ees | E8200 05.0
100225) Facet 8.00 pes [1,220.00 3,940.0
100225) Hose 80D S400_| pes. | 1260.00 sg,o40
Toca ieopee ain Copimer[ 90 [oc | 760) 9
Pen) Pipes, 2mm da, Ph es
TOHSYS Potorophyene Random Copohmar | 00 wes. | Baa ma
PRC} Pes, sonmada,eu20 |
| Hoan Feng: Polypropylene Random me) Re 7380
| yer (PPR) Pipes, zm da, |
Elbow, Bend (50 Gen.) |
| Ta) Fos Ptprepyiane andar reo [ oes | 100 00a
{opatner (PPC) Pps, Sonn da,
bom, bend (90 Ge.)
{EERIE Fetngs Poyprophyane anon Toa foes | 75 me
opaymer {PPC} pes, mm da. |
ee (us) |
TEX Feng Peyprephyans Random 300 [ses | a 3670)
Copies (PPC) pes, 2mm da, | 1
Male Threoded Adapter
TOHXGRE Feng Pelypephere Random 10 [ pes | Ta 78
{Copolymer (PPC) Pps, Somm da,
Male Yveaded Adapter |
TOORTEHFFangs-Payeropnylene Random | 500 pes] 10 7m
{Cooter (PRC) Pes, 32mm da, 1
Fem Theaded Uncn |
TEN 201 WATER PUMPING SYSTEM
TEOG) Beet ro wh Cowal 2, ER || a SO —
Fost Sten ncoat f
THT) Mae Ta (0005 Meena Type | FOO we 7000 sta
inl wolf :
WOW) es Same [spare — roam
TaD ate Ve 25m dg | “2c Tp] 9.0 5000
[oie ate Vahes soma [E00 13 70 7.5800
‘Te 628 Romo MAY ching
[Get Ginge rm Pos wih et Uae
LED 1300
‘TG 100 conouTTS, GOxES & FrTTIGs
1100(6at ely Chloide Pes (CIUPYC),
THOR) Fyn Crone oes GPC, | WEED | m | 37
Hon 9. |
TORE) Peli Conde PORE PVCTUPE), a
ae Sonn
iO)aE PILENG Raper, PO da wa
THOOO)a? PYCTLPVC Aspe, 25m da so
1000) PY/LPVC Adapter, SOmn da 35
H100(12)a PC/LPUC Eon, 20mm da. x90 Er
[co(2)azPuCAVC Ebon, 25mm 3a «90d 36.7)
[H10042}5 PUCMPVC Ebon, Stim ca 90 de 75.6,
[1000105 era Be, Som da, PYCUPYC TBA
“HOO(IS jE Weathered Conde, Sid sao) 2.01609
igi Steal ot bgp
[HORTA CT wre, Ga wie EE 1323009
1100(18)_PVC Set Cament 3s 1575
‘Sub-Total_P3,616,586.
Dewnanen sn. 2016 Pace Sof 8“Goverment of the Repu the Piippines
ony
z
:
:
5
2
F
4
;
§
‘epar nent UF PUBIC Works ana Highways
Contract 1D: 1 7NODL48 (Re-Ad)
Contract Name: Construction of Regional Evacuation Center
Location of the Contract: Poblacion, La Paz, Agusan Gel Sur
tem
Number
‘TTEM 1100 CONDUTTS,
nie |Urkort | Tea Amount |
usnty | une | Un
o
FITTINGS (eont)
|H100(19} (Octagonal uncon does, PYCPYE | 13900 [pee | a5 Eo
100020) unity Boxes, PLPC 15600 pes. | 25200) a,
‘10002303 pul bon, ttal 1.00 | pes. | 7008.00 13,086
1100(22) Square Box, PYC]UPHC $5.00 [oes | sno 13 0.0
110025} frounang Ros Copper Ga, 20nen a,| — 8.60 — [lath] 3006 30 00.0
TEM 1101 WIRES AN WiniNG DEVICES
/nbicies ecre wie, ssmmz a a
TTR |
HOLY ectrie Wire, § Sm Tao) [wor | 7860 35.2500,
frwnaenrH
HOWWT ocr ves, 8 Onn 0 | wale
THN
TIGHAWT Blecre wie, 1eenz Bo | om isa 78350
WPAN i
TOWED Elec tre, 38m soa | m By eon.
savant ae
‘HOH() Single Pole Wal Switch on one switch | 1700 |-wet-| 7,058 3509
L pate =
‘HGH) Duplex @ Single Poe Wa Sches on | GOO] set} — 1 aps
ne str pat) ras
TOUGO} ox ( Srl Pole Wa Stes on | 2400] set] — 2 08
ne sven pate z -
HOW) Avee-nay Snitch 600 | sat |e 73500
1103(21) Duplex Convenence Tai0d|-set | 756.00 ahve
L ‘Outets/Recptocies (GT)
[HOIGER Growing Cm or Eecrel Wires | TOO 5] TRO Ta00
TOE] Pvc Tape —| erator | ae TOBE
{TEM 1102 POWER LOAD CENTER, SWITCHGEAR AND PANELBOAROS
THO2{7)89 Endosed Automatic Grau Seaker, [4.00 | eet TSE 307
emt Sor NENA ay Flushed Type
THOE(IOW Poe Nouns Tansee, Pole Tyee |. 300 | at | SE GOOD T5600
—_ {os a —
TOR{iRe ererar, (Sand by TOK wore, S| —T00 | aa | aT 0000 aa
eee iiss 20d. 2400) eran
HERG Muminam Copper Stel Ravowee 25000] 505000
acs) — pee
~TOR2I)_ Concrete Pole 30,400; 201,600.00
(0226) tomate eter Base 1,600.0) 12,600.00
| iteaca7y Poser toad Crier, Swtchgea7 and 18,000.0) —Te9,000.09,
Ppantoosrds
{TTEN 1103 LIGHTING FIXTURES
‘HOR(6}27 LED Tube Ughtng Fecure = Tewatts | TOGO | S| — SOT —si9.
ronan Auminum Louie, ier
ype, 30 |
D Bub wi Resim Bae, Keyes | 80
be, Porcaan Recerace Outt 5.5 |
ss, E27 Base Surfce Mure
TOO
se]
7,080
TONES Down ugnimont Faure w/ LED Bub] — 4.00
(Summ dia. (67), 5 shat 10a |
‘hss Cove Reessed
se | a0
Sra
HONGHD fel contains singe Seed Eat =r, | 000
ltaned Shs dratonw Ruresent
lamps, Sats, 5 Paeartonate |
sma Wal Nour. |
|
an
THONG) fer rtaree Energon png Fock) 2000
n-Mataned hrs draton wy 2-LED |
amps, Uf, 2304, Wall Mureed
se | aaa
5
HORTA i Fc}
Ts 900.00
300
Dewi 20n8
Sub-Total
(P5127, 383.00Contract 1D: 1 7NODI48 (Re-Ad)
Contract Name: Construction of Regional Evacuation Center
Location of the Contract: Poblacion, La Paz, Agusan del Sur
:
tem uty [une] Une Cost) Total amount
| cee Sede ir ete
6 1720 MANHOLES, INLETS AND CATCH BASIN ins
7A) husing Mares (er Saas) "| S10 [exth] Sao —Te peo}
T7208 atc eon onenpad] | “2800 [ean | —foanon —Toe ea,
Sub-Total P24,740,00
TOTAL P34,522.930.10
JN WITNESS WHEREOF, the partes hereto set ther respective hands on the day,
‘month and year fist above wien,
Government of the
Republic of the Philippines LEGACY CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS.
AND HIGHWAYS
epresened
f,
santos ‘ALEX H/ABELIBO
ial recor “Propit
anes by
oY Hf nmps Mansa cLApiSSX P. uncuNA
Supervng mins tiveOfcer sccdeartSc persnce Sr ews aaens ae rigmurays:
Contract 1: 1700148 (Re-Ad)
Contract Name: Construction of Regional Evacuation Center
‘Location of the Contract: Poblacion, La Paz, Agusan del Sur
REPUBLIC OF THE PHILIPPINES)
nis ss
era scene
ACKNOWLEDGEMENT
a
} SEFORE ME, asthe Notary Publ fr and wanin tne _ DUNN CI
Hg5 personaly azpuared POL Mm, DELOS SANTOS, OIReonal Dred fepesening
Bi the REPUBLIC OF THE "PHILIPPINES. (Oepurtmerk. ef Pubic Wonks sek
JE] Figrways), wih Rescnce Crteate No. Cla! ised on
ee uel 900 at ein a ans ALE,
Bi? aBeLioo, ropa, ‘onze UEGACY CONSTRUCTION Y CONSTRUCTION CORPORATION vit
3} Resderce Cerca fo, conanee OA CONS RUCTION CORPORATION wen
bets 2 ~~ town to re to be the Se parione
4 to execsted the foregoing CONTRACT and AGREENENT and hey acknowledged to me
that he same is ther tue act and deed for and in behalf te partes they sereretea
5 Zs instrument consisting of eight (8) pages including ts page, on whch tis
3 acknowledgements wren dy signa bythe Contracting parses ond ter iene on
2 theletmargin ofthe ther pages
5
ES 1n wapkss WHEREOF, 1 hove hereunto affied my Signature ard Off
i Seal tis ap \ Vay of
MARIA ois
cee
ogee. — tort
Soc — a
sion oaronsion
‘i, RBELROO
ae