You are on page 1of 2

SR.

NO IDEA BY DISCRIPTION
1 Moral training regarding safety, acciedental awarness
2 excess granding under obervation
3 praveen wagge pre- defined dispatch plan
4 re-schedule the 5s traning
5 Pm of importatnt machine should be monitor
6
7 1 pc required for quality team
8 Rejection rework within days
9 kiran schedule the training to quality team regarding quality tools. Six sigma
10 waghmode Drilling template replacement.
11 Hole ID increase by obervaing the fit and function at jcb end
12 define the production man power for each job.
13
14 Audit for Supplier regarding Quality Improvement.
15 Training and Awarness to the Operators Regarding Customer Comlaints.
16 First piece sample should verified by Zone Leader.
17 Dust Bin Required on line.
18 Rameshwar Imrovement ideas and Kaizen should collect from Workers and Zone Leaders.
19 Tarange Coordination between Production and Dispatch Person regarding Dispatch.