NORTH FACTORY DEVELOPMENT:

ACCOMMODATION
SPECIFICATION

WALK-ON CEILINGS

C Issued for Construction Tim Helm 30/09/2010

B Option for suspended system omitted at Airbus Tim Helm 05/07/2010


request. System to be clear spanning over full width
of Accommodation

A Tender Issue Tim Helm 18/06/2010

REV DESCRIPTION PREPARED BY DATE AUTHORISED AND DATE


APPROVED BY

MS Professional Services FILE REFERENCE MS Construction DOCUMENT NUMBER REVISION


10160136-ISA-0006 10180001-ISA-0007 C
Morgan Sindall Professional Services Ltd
410 Birchwood Boulevard
Birchwood, Warrington WA3 7WD United Kingdom
Tel +44 (0)1925 281800 Fax +44 (0)1925 281 985
www.morganps.com
Walk-on Ceiling

To be read with Preliminaries/ General conditions.

PROPRIETARY WALK-ON CEILINGS

110 GENERAL:
This Section deals with the specification of
- Proprietary Walk-on Ceilings - Contractor’s design, fabrication and installation.

120 WALK-ON CEILINGS


• Manufacturer: Contractor's choice.
Product reference: Submit proposals.
• Parameters: refer to Architect’s drawings:
10180001-ID A-2011 Rev A: Accommodation GA, Level 1: First Floor Z-5, Z-8, Walk-on
Ceiling Gridlines 08-13a H-K.
10180001-ID A-2012 Rev A: Accommodation GA, Level 1: First Floor Z-8, Z-11, Walk-on
Ceiling Gridlines 02-08 H-K.
10180001-ID A-2013 Rev A: Accommodation GA, Level 1: First Floor Z-4, Z-7, Walk-on
Ceiling Gridlines 08-13a A-C.
10180001-ID A-2014 Rev A: Accommodation GA, Level 1: First Floor Z-7, Z-10, Walk-on
Ceiling Gridlines 02-08 H-K.
10180001-ID A-1262 Rev A: Accommodation: Detail Sections For Finishes Sheet 1
10180001-ID A-1263 Rev A: Accommodation: Detail Sections For Finishes Sheet 2
10180001-ID A-1264 Rev A: Accommodation: Detail Sections For Finishes Sheet 3

• Finish:
Exposed face to underside: Factory applied white finish, capable of being cleaned with damp cloth
and domestic detergent.
Exposed face to top side: Factory applied finish, capable of being cleaned with soft brush and
vacuum cleaner and wiped with damp cloth or mop and domestic detergent – colour white or light
grey.

• Module width: Contractors choice: to suit manufacturers standard module

• Jointing system: Manufacturers standard interlocking system.

• Support system:
To be designed by the Contractor.
The Contractor shall provide a walk on ceiling system capable of spanning from Grid Line A to the
outer wall of the Accommodation towards Grid Line C on the Port Side and from Grid Line K to the
outer wall of the Accommodation towards Grid Line H on the Starboard Side.
The outer wall of the Accommodation partitioning on the Factory side towards Gridlines C and H
shall in both cases be load bearing partitioning and it will be the Contractors responsibility to
determine the imposed load (live load and dead load) from the walk-on ceiling system and design
the load-bearing partitions to accept this load and include this cost within his Tender. It should be
noted that the current design does not include for whatever reinforcement is deemed necessary for
the partitions (part half glazed and solid proprietary metal partitioning and part solid plasterboard
dry wall partitioning) to support this imposed load.

External wall interface –the Contractors design will require metal support beams to be provided in
this location. Such support members are to be supplied and installed by the Contractor as part of
the walk-on ceiling installation and are to be designed to support the imposed load from the
Contractors walk-on ceiling system.

For internal wall types and layout refer to the following drawings:
10180001-ID A-1432 Rev A: Accommodation First Floor Partition Gridlines 08-13a H-K, Z-
5, Z-8.
10180001-ID A-1433 Rev A: Accommodation First Floor Partition Gridlines 02-08 H-K, Z-
8, Z-11.

Airbus UK: North Factory Accommodation: Walk-on Ceiling Specification: 10160136-ISA-0006 2


10180001-ID A-1434 Rev A: Accommodation First Floor Partition Gridlines 08-13a A-C, Z-
4, Z-7.
10180001-ID A-1435 Rev A: Accommodation First Floor Partition Gridlines 02-08 A-C, Z-
7, Z-10.
For main Factory structural steelwork refer to the following AWSL drawings:
C313-001 Rev H : Column Layout Plan Sheet 1 of 2.
C313-002 Rev L : Column Layout Plan Sheet 2 of 2
C313-003 Rev H : Roof Level Plan Sheet 1 of 2
C313-004 Rev H : Roof Level Plan Sheet 2 of 2
C313-005 Rev F : Roof Bottom Cord Layout Sheet 1 of 2
C313-006 Rev E : Roof Bottom Cord Layout Sheet 2 of 2
C313-007 Rev K : Typical X-Section: Main Frame Truss
C313-008 Rev H : Typical X-Section: Secondary Frame Truss
C313-014 Rev L : Column & Floor Layout (1 of 3)
C313-015 Rev K : Column & Floor Layout (2 of 3)
C313-016 Rev L : Column & Floor Layout (3 of 3)
C313-040 Rev B : High Level Walkways & Service Supports (1 of 2)
C313-041 Rev B : High Level Walkways & Service Supports (2 of 2)
C313-049 Rev B : Mezz Floor Layout H to K (Starboard)
C313-063 Rev - : Handrail to Plant Rooms, Plan & Elev.

• Trimming for service penetrations: there will be a general requirement for small diameter
penetrations (up to 50mm) for cable connections to light fittings, smoke detectors and alarms,
domestic services pipework and sprinkler pipe connections to sprinkler heads etc.
There will be specific requirements for ductwork supply and extract penetrations – max size 600 x
600mm. Walk-on ceiling Contractor to form such penetrations with any necessary reinforcement of
the walk-on ceiling construction to maintain the integrity of the installation, and to provide
information with respect to the limitations on the frequency and spacing of such penetrations. Inter-
mediate support trimming for these 600mm square service penetration holes shall be located
above the walk-on ceiling so as to maintain a flush underside face.

• Access Requirements: allow for 3No access stairs per side (Port and Starboard). Access stairs to
fix back to existing Service Walkway steelwork. Stairs to meet the requirements of BS 5395-3
1985: Stairs ladders and walkways – Part 3: Code of practice for the design of industrial type stairs,
permanent ladders and walkways. Stairs to have minimum clear width of 800mm and maximum
o
pitch of 42 . Stairs to be constructed from mild steel flat plate stringers and chequer-plate treads
finished with Leighs Paints M255 colour white to match existing Service Access Gantry steelwork,
applied fully in accordance with manufacturers instructions. Stairs to be complete with BSG (British
Standard Grating) galvanised tubular steel hand-railing (handrail 42mm dia. standards and 33.7mm
dia. top and mid rail). Contractor to allow for modifications to the existing BSG handrail along the
Plant and Service Access Walkway to form openings at new stair positions.

• Other requirements:
Mansafe wire system to run parallel to Grid Lines A & K with latch on harness and line system.
Yellow cross hatch taped warning zone applied to upper surface of walk-on deck for a distance of 1
M back from any open edges.

Option to be priced separately as e/o to main Tender:


Tubular steel balustrade fixed to open edges. Balustrading to meet the requirements of the Building
Regulations Approved Document K2/3 Section 3, in accordance with BS6180: 1990 – Barriers in
and about buildings – code of practice and BS 5395-3: 1985 – Stairs ladders and walkways – Part
3. Lateral load to BS595-3: 1985 table 4 – light duty.

GENERAL/ PERFORMANCE

210 DETAILING OF PROPRIETARY SYSTEM


• Installation details: Submit drawings showing every aspect of the construction, including
incorporated components and features, trimming for voids, holes for services, and related work by
others.

Airbus UK: North Factory Accommodation: Walk-on Ceiling Specification: 10160136-ISA-0006 3


Purpose: To allow checking of compatibility with surrounding structure and coordination of
services.
• Method statement and risk assessment for installation: Submit.
• Programme: Submit well in advance of construction.

220 CONTRACTOR DESIGN


• Standard: Complete the design in accordance the parameters set out in the Morgan Sindall
Professional Services General Arrangement drawings (Architectural and Mechanical and Electrical
Services).

230 STRUCTURAL PERFORMANCE OF WALK-ON CEILING


• Loads: The floors must safely support the maximum combination of dead and imposed loads both
in the finished condition and during construction in accordance with BS 6399: Part 1: 1996: Code of
practice for dead and imposed roof loads Clause 5.2 b.
• Dead loads:
2
- UDL (live): 0.25 kN/m
- Distributed loads of services: 0.25 kN/m².
2
- Distributed load of suspended ceilings: 0.15kN/m
• Imposed loads:
- A concentrated point load of: 0.9 kN
NB the above loadings are additional to the self weight of the walk-on ceiling construction.
• Deflection (maximum): Span/250.
• Diaphragm/ tie action: To suit application. Design to meet the requirements of the Building
Regulations Approved Document A Clause A3 to prevent disproportionate collapse.

240 FIRE RESISTANCE


• Fire Resistance: No fire resistance is required to the walk-on ceiling with respect to fire separation
or compartmentation.
• Surface finishes: to have a Surface Spread of Flame National classification of Class 0 when
testing to BS 476-7 or European classification of B-s3, d2 in accordance with BS EN 13501: Part 1
• Internal core: any foam materials to be FM Global certified.
Data: Submit certificates.

INSTALLATION

310 GENERAL REQUIREMENTS


Lifting: Contractors to submit proposals for lifting and placing of materials.
Bearings: Set on level bearings ensuring not less than the minimum seating
recommended by the walk-on ceiling manufacturer.
Site formed openings: As walk-on ceiling manufacturer's recommendations.
Cutting/ drilling: As recommended or agreed by walk-on ceiling manufacturer.

Airbus UK: North Factory Accommodation: Walk-on Ceiling Specification: 10160136-ISA-0006 4