You are on page 1of 2

CE TECH 423 – Planning and Estimates

ROQUE, JETHRO LEIGH R. BSCE – 4A NOVEMBER 27, 2019

Give the meanings and its Filipino translations (if there is any) of the following construction planning and estimates
terminologies. Expound its meaning(s) by giving sample picture(s).

1 Bill of quantities 39 Board Foot 77 Trimmer


2 Bill of materials 40 Ready-mix concrete 78 Header
3 Cost Engineering 41 Concrete block-outs 79 Collar beam
4 Cost 42 Planted column 80 purlins
5 Rate 43 Drywall 81 Fascia board
6 Quantity 44 Studs 82 Bottom chord
7 Preliminaries 45 Joist 83 Top chord
8 Tender 46 Wood hangers 84 Tread
9 Tender documents 47 Retaining board 85 Riser
10 Pre-contract stage 48 Braces 86 Framework
11 Post contract stage 49 Spacer 87 Handrail
12 Provisional sums 50 Tie wires 88 Eave
13 Prime cost sums 51 Bolts 89 Gutter
14 Contingencies 52 Nails 90 Wrought Iron Strap
15 Material Cost 53 Masonry 91 Scaffolding
16 Labour Cost 54 Mortar 92 Plastered Course
17 Plant Cost 55 Hook and bend 93 Scratch Coat
18 Labour Cost 56 Adobe stones 94 Varnish finish
19 Profit 57 Bar splicing 95 concrete slab
20 Overhead Cost 58 Welding (Bar splicing) 96 groove
21 Working drawings 59 Tying (bar splicing) 97 paneled door
22 specifications 60 Sleeves (bar splicing) 98 masonry fill
23 Worksheets 61 Alignment 99 soldering lead
24 Concrete 62 Shear reinforcements 100 stake
25 Formworks 63 Lateral ties
Note:
26 Reinforcement 64 Stirrups
27 Lumber 65 Cut up bars  Output on Long Bond paper (White,
28 Wood 66 Bent - up bars substance 20 or above)
 COMPUTERIZED
29 Hard wares 67 Dressed Lumber
 Times New Roman, 11
30 Painting works 68 S2S and S4S  Follow the Prescribed Header and Footer
31 Footings 69 collar plate Format
32 Footing tie-beam 70 Timber  Random checking will be done during
33 Girder 71 Plank discussion, so be ready and beware
 Do not REPLICATE others work.
34 Girt 72 Board
 Follow the format below
35 Beam 73 Flitch  Do not reprint this page, start your page 1
36 Column 74 Rough Lumber with item no. 1 (i.e. Bill of quantities)
37 Sill 75 Hinge  Date of submission: as shown above
38 Aggregates 76 joist bridging

1. Hip rafters – are rafters laid diagonally from the corner of a plate or girts to the ridge

IRENE R. ROQUE, RCE, ME-SE CE TECH 423 HW # 1: CONSTRUCTION TERMINOLOGIES


Instructor Page 1
CE TECH 423 – Planning and Estimates
ROQUE, JETHRO LEIGH R. BSCE – 4A NOVEMBER 27, 2019
2. Valley rafters – is any rafters which does not extend from the plate or girts to the ridge

FOLLOW THIS EXAMPLE

IRENE R. ROQUE, RCE, ME-SE CE TECH 423 HW # 1: CONSTRUCTION TERMINOLOGIES


Instructor Page 2

You might also like