SHENBAGA BUILDERS

Quotation
Thirumangalam

Date: 15.11.2019

RATE
AMOUNT
S.No DESCRIPTION UNIT QTY Per
In Rs
Unit

1 Tile Work
(i) Providing floor with vertified tile
a) Floor tile including material & labour( Tiles
Sft
cost Rs.45 & Rawmaterial and Labour Rs.95 ) 570 140
b)Skirting Sft 225 95

(ii) Laying kitchen wall tiles Sft 60 140


(iii) Hacking of tiles floor and removing of existing skirting. Lump sum

2 Painting
(i) PovidingWork
and applying Three coats of Plastic
Emulsion paint (ASIAN Ace paint) for walls (One
coat of base color and Two coats of choosen Sft
color). 2345 16.5
(ii) Poviding and applying two coats of Plastic
Sft
Emulsion paint (ASIAN Ace paint) for ceiling. 570 11
(iii) Varnishing of doors Lump sum
(iv) Painting innerside of wooden cupboard and
cleaning wooden cupboard. Lump sum

3 Carpentry Work
(i) Alteration of doors (3Nos) and changing of lock
set (1Nos)
(ii) Alteration of shutter frame and window groove
at toilet (1Nos) Lump sum

4 Aluminium
(i) Providing Work
aluminium ventilation window at
toilet (1Nos)

5 PVC Work
(i) Fixing of PVC Door at bathroom Nos 2 1900

6 Pluming Work
(i) Removal of old closet and fixing new EWC
closet (2Nos - Hindustan Brand) at bathroom.
Cleaning and servicing of taps Lumpsum
Total -