1. Unconstrained plan 2. Constrained plan(enforce capacit constraints,enforce demand due dates,decision rule etc.) 3. Optimized plan
Different options(types) of planning:
1. Material Requirement Planning(MRP) 2. Master Production Scheduling(MPS) 3. Master Production Planning(MPP)
Below are the features:
1. Process-based memory allocation
2. Materialized view 3. Multi-thread snapshot 4. Hot backup and recovery available 5. Ease of integration with Oracle E-Business Suite 6. Integration with legacy systems 7. Centralized database for faster and easier access from anywhere
Process flow of ASCP:
1. New Plan creation in ASCP 2. Plan will be launchedd to make available for planner to perform planning. 3. Adjustment recommended b planning engine are analsed and applied on the source instance.
Creation of Plan: -------------------- It consists of maximum number of inventory,safety stock,deliver which is schdules on time and its need-by date.
Launch the Plan:
-------------------------- Newly created plan is launched and available in planners workbench. We can perform analysis and adjustment on basis of plan. Upon Launchign of plan, the existing demand and suppl available to us from source instance.