62OP42223_U1_625070
SIEMENS LTD. 001 -
Responsible Department: Take over Department: Document Type: Folder No.
PGSU-PE PGSU-PM DC -
Prepared: Checked: Released: Language Page:
Project:
1 X 22 MW IHEL A/c PT PNS, Indonesia
Customer:
ISGEC HEAVY ENGINEERING LIMITED (IHEL)
Consultant:
NOTES:
Unrestricted
______________________________________________________________________________________________________________________________________
We reserve the rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly
forbidden. © SIEMENS Ltd.
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 02
Unrestricted
parties without express authority is strictly forbidden. ©
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
FROM PROCESS
EQUALISING PLUG
TO INSTRUMENT
01 1/2" PIPE - - - -
02 1/2" SCREWED CAP - - - -
04a 1/2" NB X 1/2" NPT(M) OST NIPPLE - - - -
3" CONDENSATE POT WITH 1 No. 1/2" NPT(M) PLUG
12 - - - -
& 3 Nos. 1/2" SW PROCESS CONNECTION
Item No. Description Material Unit Qnt./ tag Total qnt.
BILL OF MATERIAL
Prepared By:AA Derived From: Sep. PL same no. Another no. Scale Doc. Size
Dtd.: 09.03.2017 P& ID A4
Format No. IP-Q-F-2012/B
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 03
Unrestricted
parties without express authority is strictly forbidden. ©
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 04
Unrestricted
parties without express authority is strictly forbidden. ©
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
Operating Parameters
Max. Press. 84.6 kg/cm2
Max. Temp. 510 deg c
Siemens Ltd.
BILL OF MATERIAL
Prepared By:AA Derived From: Sep. PL same no. Another no. Scale Doc. Size
Dtd.: 09.03.2017 P & ID A4
Checked By: NAA Responsible Dept: Title:
Format No. IP-Q-F-2012/B
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 05
Unrestricted
parties without express authority is strictly forbidden. ©
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
Approved By: GCS Take Over Dept: DIAGRAM FOR FLOW TRANSMITTER Language
Dtd.: 09.03.2017 PG SU PM LP WATER SERVICE en.
Ref file: -- CLIENT: ISGEC HEAVY ENGINEERING LIMITED (IHEL) No. of sheet
-- PROJECT: 1X22MW IHEL A/c PT PNS, INDONESIA
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 06
Unrestricted
parties without express authority is strictly forbidden. ©
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
Operating Parameters
Max. Press. -0.95 kg/cm2
Siemens Ltd.
NA NA NA NA NA NA
Item No. Description Material Unit Qnt./ tag Total qnt.
BILL OF MATERIAL
Prepared By:AA Derived From: Sep. PL same no. Another no. Scale Doc. Size
Dtd.: 09.03.2017 P&ID A4
Format No. IP-Q-F-2012/B
Unrestricted
We reserve all rights in this document and in the information
Operating Parameters
Max. Press. -0.95 kg/cm2
Max. Temp. 39.6 deg C
Siemens Ltd.
- - - - - -
Item No. Description Material Unit Qnt./ tag Total qnt.
BILL OF MATERIAL
Prepared By:AA Derived From: Sep. PL same no. Another no. Scale Doc. Size
Dtd.: 09.03.2017 P&ID A4
Checked By: NAA Responsible Dept: Title:
Format No. IP-Q-F-2012/B
Approved By: GCS Take Over Dept: DIAGRAM FOR HOTWELL LEVEL Language
Dtd.: 09.03.2017 PG SU PM TRANSMITTER en.
Ref file: -- CLIENT: ISGEC HEAVY ENGINEERING LIMITED (IHEL) No. of sheet
-- PROJECT: 1X22MW IHEL A/c PT PNS, INDONESIA
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 08
Unrestricted
parties without express authority is strictly forbidden. ©
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
Approved By: GCS Take Over Dept: DIAGRAM FOR PRESSURE GAUGE Language
Dtd.: 09.03.2017 PG SU PM HP STEAM SERVICE en.
Ref file: -- CLIENT: ISGEC HEAVY ENGINEERING LIMITED (IHEL) No. of sheet
-- PROJECT: 1X22MW IHEL A/c PT PNS, INDONESIA
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 09
Unrestricted
parties without express authority is strictly forbidden. ©
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
Approved By: GCS Take Over Dept: DIAGRAM FOR PRESSURE GAUGE Language
Dtd.: 09.03.2017 PG SU PM LP STEAM SERVICE en.
Ref file: -- CLIENT: ISGEC HEAVY ENGINEERING LIMITED (IHEL) No. of sheet
-- PROJECT: 1X22MW IHEL A/c PT PNS, INDONESIA
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 10
Unrestricted
parties without express authority is strictly forbidden. ©
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
Approved By: GCS Take Over Dept: DIAGRAM FOR PRESSURE GAUGE Language
Dtd.: 09.03.2017 PG SU PM LP WATER SERVICE en.
Ref file: -- CLIENT: ISGEC HEAVY ENGINEERING LIMITED (IHEL) No. of sheet
-- PROJECT: 1X22MW IHEL A/c PT PNS, INDONESIA
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 11
Unrestricted
parties without express authority is strictly forbidden. ©
contained therein. Reproduction, use or disclosure to third
We reserve all rights in this document and in the information
Approved By: GCS Take Over Dept: DIAGRAM FOR PRESSURE GAUGE Language
Dtd.: 09.03.2017 PG SU PM OIL SERVICE en.
Ref file: -- CLIENT: ISGEC HEAVY ENGINEERING LIMITED (IHEL) No. of sheet
-- PROJECT: 1X22MW IHEL A/c PT PNS, INDONESIA
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 12
Unrestricted
parties without express authority is strictly forbidden. ©
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
Operating Parameters
Max. Press. -0.95 kg/cm2
Max. Temp. 39.5 deg C
Siemens Ltd.
Approved By: GCS Take Over Dept: DIAGRAM FOR VACUUM SERVICE Language
Dtd.: 09.03.2017 PG SU PM en.
Ref file: -- CLIENT: ISGEC HEAVY ENGINEERING LIMITED (IHEL) No. of sheet
PROJECT: 1X22MW IHEL A/c PT PNS, INDONESIA
--
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 13
Unrestricted
parties without express authority is strictly forbidden. ©
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
Approved By: GCS Take Over Dept: DIAGRAM FOR PRESSURE SWITCH LP Language
Dtd.: 09.03.2017 PG SU PM WATER SERVICE en.
Ref file: -- CLIENT: ISGEC HEAVY ENGINEERING LIMITED (IHEL) No. of sheet
PROJECT: 1X22MW IHEL A/c PT PNS, INDONESIA
--
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 14
Unrestricted
parties without express authority is strictly forbidden. ©
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
Operating Parameters
Max. Press. 10 kg/cm2
Siemens Ltd.
03
4C
Approved By: GCS Take Over Dept: DIAGRAM FOR PRESSURE SWITCH Language
Dtd.: 09.03.2017 PG SU PM OIL SERVICE en.
Ref file: -- CLIENT: ISGEC HEAVY ENGINEERING LIMITED (IHEL) No. of sheet
-- PROJECT: 1X22MW IHEL A/c PT PNS, INDONESIA
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 15
Unrestricted
parties without express authority is strictly forbidden. ©
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
Approved By: GCS Take Over Dept: DIAGRAM FOR PRESSURE Language
Dtd.: 09.03.2017 PG SU PM TRANSMITTER HP STEAM SERVICE en.
Ref file: -- CLIENT: ISGEC HEAVY ENGINEERING LIMITED (IHEL) No. of sheet
-- PROJECT: 1X22MW IHEL A/c PT PNS, INDONESIA
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 16
Unrestricted
parties without express authority is strictly forbidden. ©
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
IF THE PROCESS VALUE IS < 1.0 kg/cm2, INSTALL THE INSTRUMENT AS CLOSE AS POSSIBLE TO THE TAPPING POINT.
25 1/2" OD, 1.65THK TUBE SS Mtrs. 2 8
24 MALE CONNECTOR 1/2"OD X 1/2"NPT(M) x CPRSN SS Nos. 2 8
13 2-VALVE MANIFOLD(ALONG WITH INSTRUMENT) SS Nos. 1 0
3" CONDENSATE POT 1/2" SCREWED VENT CAP &
12 CS Nos. 1 4
SW PROCESS CONNECTION (REFER GA)
10b 1/2" SW x 1/2" SW CONNECTOR CS Nos. 1 4
07 1/2" SW EQUAL TEE CS Nos. 1 4
04a 1/2" NB x 1/2" NPT(M) 4" LONG NIPPLE CS Nos. 3 12
03 1/2" SW GLOBE VALVE CS Nos. 1 4
02 1/2" SCREWED CAP CS Nos. 2 8
01 1/2" PIPE CS Mtrs. 6 24
Item No. Description Material Unit Qnt./ tag Total qnt.
BILL OF MATERIAL
Prepared By:AA Derived From: Sep. PL same no. Another no. Scale Doc. Size
Dtd.: 09.03.2017 P & ID A4
Checked By: NAA Responsible Dept: Title:
Format No. IP-Q-F-2012/B
Approved By: GCS Take Over Dept: DIAGRAM FOR PRESSURE Language
Dtd.: 09.03.2017 PG SU PM TRANSMITTER LP STEAM SERVICE en.
Ref file: -- CLIENT: ISGEC HEAVY ENGINEERING LIMITED (IHEL) No. of sheet
-- PROJECT: 1X22MW IHEL A/c PT PNS, INDONESIA
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 17
Unrestricted
parties without express authority is strictly forbidden. ©
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
Approved By: GCS Take Over Dept: DIAGRAM FOR PRESSURE Language
Dtd.: 09.03.2017 PG SU PM TRANSMITTER LP WATER en.
Ref file: -- CLIENT: ISGEC HEAVY ENGINEERING LIMITED (IHEL) No. of sheet
-- PROJECT: 1X22MW IHEL A/c PT PNS, INDONESIA
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 18
Unrestricted
contained therein. Reproduction, use or disclosure to third
We reserve all rights in this document and in the information
03
4C
Approved By: GCS Take Over Dept: DIAGRAM FOR PRESSURE Language
Dtd.: 09.03.2017 PG SU PM TRANSMITTER OIL SERVICE en.
Ref file: -- CLIENT: ISGEC HEAVY ENGINEERING LIMITED (IHEL) No. of sheet
-- PROJECT: 1X22MW IHEL A/c PT PNS, INDONESIA
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 19
Unrestricted
contained therein. Reproduction, use or disclosure to third
We reserve all rights in this document and in the information
parties without express authority is strictly forbidden. © Siemens SYPHON (PIG TAIL)
USING 1/2" NB PIPE SCH. 160
(STEAM SERVICE)
Ltd.
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Unrestricted
contained therein. Reproduction, use or disclosure to third
parties without express authority is strictly forbidden. ©
We reserve all rights in this document and in the information
Ø55
1.5
°
37.5
25
L
CONNECTION
SIZE: Refer Note 3
1.5
Siemens Ltd.
Ø55
1.5
°
37.5
35
L
CONNECTION
SIZE: Refer Note 3
45°
45°
NOTES :
1. STUB MATERIAL SHALL BE SAME AS PARENT PIPE MATERIAL. FOR DETAILS REFER P&ID.
2. CUSTOMER/CONSULTANT SHALL FOLLOW ABOVE DRAWING AND DIMENSIONS FOR
STUB SELECTION WHEREVER PIPELINE IS OF CUSTOMER SCOPE.
3. TYPE OF THREADING SHALL BE AS MENTIONED IN P&ID NOTES [1"NPT OR M33X2].
4. LENGTH OF STUB SHALL BE 64MM FOR PIPELINES BELOW DN200 AND
45MM FOR DN200 AND ABOVE SIZE
5. SLANT OR STRAIGHT IMMERSION SHALL BE AS PER PIPING ISOMETRIC DRAWING.
BILL OF MATERIAL
Prepared By:AA Derived From: Sep. PL same no. Another no. Scale Doc. Size
Dtd.: 09.03.2017 P & ID A4
Checked By: NAA Responsible Dept: Title:
Format No. IP-Q-F-2012/B
Approved By: GCS Take Over Dept: (FOR STRAIGHT IMMERSION) Language
Dtd.: 09.03.2017 PG SU PM en.
Ref file: -- CLIENT: ISGEC HEAVY ENGINEERING LIMITED (IHEL) No. of sheet
-- PROJECT: 1X22MW IHEL A/c PT PNS, INDONESIA
CONSULTATANT: NA
22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 21
Unrestricted
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
parties without express authority is strictly forbidden. ©
THE FOLLOWING INSTRUMENTS ARE IN THE SCOPE OF THE SUB-SUPPLIER OR DIRECTLY MOUNTED
5 0TPGL501A 5 0HPGN605
6 0TPGL502A 6 -
7 0TPGL503A
8 0TPGL504
9 0TPGL505
10 0TDPTL501 GSC SUPPLIER
11 0TPGL402 1 0TPGN303
12 0TPGL401 2 0TPGN304
13 0TLGL701 3 0HPGO301
14 0TLTL701 4 0HLGO301
15 - 5 -
16 - 6 -
17 -
18 - FACTORY SUPPY
19 - 1 0TPTL451
20 - 2 0TPTL452
21 - 3 0TPTL453
22 - 4 0TPTL454
23 - 5 -
24 - 6 -
25 -
26 -
27 -
- - - - - -
Approved By: GCS Take Over Dept: SUPPLIER SCOPE / DIRECT Language
Dtd.: 09.03.2017 PG SU PM MOUNTED en.
Ref file: -- CLIENT: ISGEC HEAVY ENGINEERING LIMITED (IHEL) No. of sheet
-- PROJECT: 1X22MW IHEL A/c PT PNS, INDONESIA
CONSULTATANT: NA 22
Document No. Rev. No. Sheet:
Siemens Ltd. 62OP42223_U1_625070001 - 22
Unrestricted