Work Inspection
Contract No. 012018 ST-WC-711-R00
Request No.
MOHAMED HARASANI
To Consultant Date 26-09-2019
ARCHITECTS
Date Inspection 26-09-2019
Requested
W15 استالم حديد تسليح حائط المصعد Time Inspection
Description Of Works To Be 03:30 PM
بدور الميزانين Requested
Inspected And / Or Tested
part B Civil Architectural
Discipline Mechanical Electrical
Other (specify)
Location بحسب المكان المشار إليه بالمخطط المرفق
Block No.
Level
Element
Attachment(s) مرفق كروكي
C.M MOSTAFA SABAA Signature
MHA PM
Engineer’s Decision
Ali Hurmuzlu Mohamed A. Abdul Jalil
(the work is)
Date Date
Signature
A) – Work shall only proceed when action is only approved or approved as noted
B) – Approval of this document does not release contractor of his obligations
Received By