You are on page 1of 47

AD-7

LITERATURE CASE STUDY


SLUM REDEVELOPMENT
“KATHPUTLI COLONY”
DELHI
“KATHPUTLI COLONY”
 LOCATION :- Shadipur depot area, Delhi, India.
 TOTAL AREA :- 5.2 hectare [52000 sqm]
-- 60% of area (31200 sqm) – For redevelopment of colony.
-- 40% of area (20800 sqm) – Rehaja developer to built their own
commercial and residential BUILDINGS.
 Almost 40 year of slum.
 Largest slum of delhi.
 15 mins away from Sansadh Bhavan.
 TYPE OF PEOPLE :- Puppeters, magicians, folk singer, dancers and storey
tellers, etc
 NO. OF FAMILIES :- 2800
HISTORY
A travelling Banjara tribe settles Conflict between DDA & the
1960 At Present
at the edge of the city to famine residents has mad e this
& increase in demand in their project on hold due to legal
art & craft. inquisitions & political shifts

1978 1982 2008

A low rise settlement proposal Delhi Development Authority –


The First Ngo – ‘Bhule Bisre design by Ar. Revathi Kamath - DDA sells the land to the
Kalakar’ establihed by Rajiv ‘ANANDGRAM’ approved. The project developers for a minimum
Sethi with a dream towards was meant to rehabilitate the 600 amount. The deveopers are
their negligible result & the families living at kathputali. It was required to rehabilitate the
colony continues to grow by never impemented due to lake of families on the site under PPP
iteself. political will (Public Private Partnership).
LOCATION
LOCATION & GEOGRAPHY
SITE LOCATION:-
Welcomes • The site is located
disturbances on the North-east
occuring in delhi,india.
winter month • On the North-west
of Dec & Jan of the site metro
line &railway
station are located.
Preventing • Railway station is 7
monsoon km away from the
winds site.
during july , • The bus stand is 0.2
August & km from the site.
Sept. • 15 mins away from
Sansad bhavan.
EXISTING IMAGES
TYPES OF ARTISTS
NEED FOR REDEVELOPMENT
• In order to create slum free Delhi.
• To uplift the living conditions of slums.
• Homelessness , degraded living conditions.
• None public space for recreational purpose.
• Streets are narrow.
• illegal construction.
• The area lack basic utilities such as sewage
treatments and proper ventilation
REASONS

narrow streets

No Proper drainage line

Garbage on streets
OVERVIEW
• In 2004, DDA ran a scheme to redevelop the slum and provide
houses with hygienic conditions.
• In 2008, tenders were invited.
• In 2009, kathputli colony was solded by DDA to Rehaja
developers in 6 crores.
• Under the scheme, re-settlement will be done on the land
occupied by JJ (jhuggi-jhonpri) clusters with private
partnership.
OVERVIEW
• The 2800 families of kathputli shall be given on lease of life by providing
them the latest modern apartments with full facilities.
• Each apartment shall be over 30 Sqm in size.
• Till the time these structures are built on kathputli colony residents shall
be rehabilitated in a Transit camp facility at Anand Parbat barely, 1.8kms
away from the site
• Till the time these structures are built on kathputli colony residents shall
be rehabilitated in a Transit camp facility at Anand Parbat barely, 1.8kms
away from the site.
• This shall be only for 2-3 yr by which the time building is ready.
• From 2009 after 7 yrs ,DDA started vacanting the area.
TRANSIT CAMP

Wide roads
TRANSIT CAMP
Fully
operational
STP &
recycling of
treated water.

RO filtered
water &
water
storage.
SITE ANALYSIS
The site surrounded with densely inhabited residential area & mixed of activities & land
uses. This offers diverse nature to the site. Entire Primary rod (patel road) h commercial
character which portrays the commercial viability of the site.
SITE ANALYSIS
SITE ANALYSIS

Garbage on streets
Garbage on streets
SITE ANALYSIS
The site has majorly 3 types of streets

SECONDARTY:-
connected to the
primary . Both are
commercial.

PRIMARY:- that divides TERITARY:- are like


the site into 2, & make it web spreader
accessible from main throughout the
road. site.
SITE ANALYSIS
A STUDY OF EXISTING
LIVEIHOOD
CONCEPT & BUBBLE
Concept :-
DIAGRAM
Amalgamating philosophies, Creativity n
Reality
• Arts as Hands.
• Retail as Threads.
• Livelihood as puppets.
Like how the Puppets are controlled by the
Hands through strings, the same way their art
is supporting the livelihood through retail.
SITE ALLOTMENT
INTEGRATING HOUSING &
RETAIL
KEY PLAN
SITE ANALYSIS
SITE ANALYSIS
PROPOSED LAYOUT
LEGEND:-

1. Pupperty Workshop.
2. Bangle making workshop.
3. Embriodary workshop.
4. Learning centre.
5. Pottery worshop.
6. Grnd. floor-
Multipurpose worshop.
Carpentry workshop.
1st floor –
Bamboo workshop.
Carpentry workshop.
7. Art gallery.
PROPOSED PLANS
PROPOSED PLANS
PROPOSED PLANS
PROPOSED SITE PLAN
GROUND FLOOR PLANS
1
1
5 6

2
2 7
3
2
6 8
5
4
15 16
10
15

16
8
14

13 12 11

1
1ST FLOOR PLANS
2 7
6

2 14
8
9
6
14
3
2
6
4

5
2

2
7

8
13
12 13 16
2ND FLOOR PLANS
4

1 2

3
2
5

7 7
4

6 6

6
6

7 7 7
5

5
SECTIONS
SECTIONS
1ST FLOOR PLANS
SHOPS
SHOPS
SHOPS SECTION
VIEWS

A VIEW FROM RETAIL PARKING

A VIEW FROM RETAIL COURT


VIEWS
VIEWS
VIEWS
VIEWS
REASONS
• DDA is not ready to give this in writting.
• No employment was available near the transit
camp.
• According to people, facilites were not
provided in the Transit Camp.
• They do not trust DDA.
CONCLUSION
• Hygienic living – sloving issues
with cleanliness, toi. Facilities,
water and waste management.
• Better Infrastructure- providing
central amenities like large
green parks, regional structure,
parking, shops, medical centre,
schools ,etc.
• Entrepreneurial Assistance-
providing better platform to
perform which help them earn.
• Socio-economic uplifts- schools
and community area will help
uplift the society.
• Betterment of the cityscape- by
making delhi slum free
THANK YOU

Guided by; Presented by;


Ar. Pranita Pranjale • Rajni Sharma.

You might also like