OEE METHOD FOR SPACEWOOD FURNISHERS


LTD.- A case study

Prof. Satish G. Sonwane1, Warad S. Degwekar2, Yashwant V. Mohitkar3 and Siddhesh R. Deshpande4
1
Assistant Professor, Department of Mechanical Engineering, Dr. Babasaheb Ambedkar College of
Engineering & Research, Nagpur.
2,3,4
Student, Department of Mechanical Engineering, Dr. Babasaheb Ambedkar College of Engineering &
Research, Nagpur.

Abstract—The work presented aims at the application various data of the machines and worker and their
of time study at Spacewood Furnishers Ltd. with focus output has been record and through which the
on crucial side of productivity improvement with the efficiency of the machine as well as the rating of the
proper use of work and time-study techniques in
worker has been found out.
manufacturing industry. The improvement in the
With a sprawling 15-acre manufacturing unit in
productivity in the company is found out by the
recording efficiency of the machine. In this study the Nagpur, Spacewood’s integrated facility brings home
productivity of the machine is enhanced by the use of autonomous technology, viz. short cycle lamination,
OEE toll i.e. Overall Equipment Efficiency tool. This panel processing, membrane pressing, press shop,
OEE method is used to enhance and increase the powder coating, etc. Spacewood upholds global
productivity of the process as well as machines and standards with state-of-the-art European machinery
workers. In this case study we have used OEE on CNC operating over the most modern manufacturing
and Edge Binder machines to find out the bottleneck processes. BIFMA compliant test laboratory fulfills
and hidden losses. While exploring it was found that
observance with international practices.
there was not a single process to find the efficiency of
Independently functioning with in-house design and
the workers as well as machines and because of this the
major loss in efficiency was constantly taking place in product development specialists, Spacewood creates
the production. To avoid the losses and to find out the solutions that are future ready, sustainable and world
exact efficiency of machines and operators, exact class. Spacewood manufactures modular kitchens,
number of output for the given input, time taken by the home furniture and office furniture.
machine and worker to complete the job, such things
have been found out by the method adopted. The data
The project was taken up at Spacewood plant-4,
was recorded and generated on the excel sheet. With the Nagpur. We worked on the project using the concept
help of excel sheet tools all the efficiencies of the of overall equipment efficiency (OEE). It
machines and workers have been found out exactly. demonstrates the method to increase the efficiency of
This study helped in identifying the problems and machines and operators. The main task of the project
suggest appropriate system to improve productivity. is to enhance the efficiency of machines and operator
I. INTRODUCTION by developing a tool to monitor the cumulative
output (performance) of machines and operators.
There are many factors that influence the productivity Manufacturing sector has been experiencing
of a manufacturing organization. The most widely tremendous challenges in ensuring all products are
tackled issue is how to improve efficiency and delivered to customers on time. in calculating OEE
productivity. Work and time study technique is one you have to take into consideration machines as
of the productivity improvement techniques used in operating in a link and complex environment [2].
many manufacturing companies. Work and time This method will help industry in finding out the
study is a work measurement technique for recording efficiency of the specific machines on specific day or
the times of performing a certain specific job [18]. In a one-month efficiency of the machine. By this data
this paper the time and work study has been done by the machines or operator with less efficiency can be
calculated the generation of excel sheet in which improved. The importance of maintenance functions

IJIRT 145890 INTERNATIONAL JOURNAL OF INNOVATIVE RESEARCH IN TECHNOLOGY 1077


© April 2018| IJIRT | Volume 4 Issue 11 | ISSN: 2349-6002

has increased due to its role in keeping and case study for improving OEE with help of TPM and
improving the availability, product quantity, safety 5S techniques using a systematic approach. Nakajima
requirements, as maintenance costs constitute an (1998) identified and classified the main losses
important part of the operating budget of related to availability, in response to maintenance
manufacturing firms [3]. The main losses that were problems encountered in manufacturing environment,
causing the reduction of productivity are material not the Japanese developed and introduced the concept of
available on time, breakdown of machine due to lack Total Productive Maintenance (TPM), in 1971[10,15].
of maintenance and power off. The project has been He established the “six big losses”: (1) poor
addressed in three aspects; namely Availability, productivity and lost yield due to poor quality, (2)
Performance and Quality which quantify OEE of a setup and adjustment for product mix change, (3)
machine [20]. production losses when temporary malfunctions
occur, (4) differences in equipment design speed and
After developing tool to monitor the data, analysis of
actual operating speed, (5) defects caused by
the data is carried out to identify different types of
malfunctioning equipment, and (6) start up and yield
losses occur during the production. Once the types of
losses at the early stage of production [7, 11, 14, 17].
losses are identified, detail study of losses is carried
The present aimed at minimizing the breakdowns,
to increase the output. When the losses are examined
increasing performance and quality rate of machine
and modifications are done in production procedure
thus improving the effectiveness.
the efficiency i.e. output of machines and operators
Starting with the question that in calculating OEE
appears to be increased. We generated a report in
you have to take into consideration machines as
Microsoft Excel and documented the output data in it
operating in a link and complex environment. So, we
of one month i.e. January. We even came to know the
analyze almost a model for the OEE calculation that
types of losses occurring in the plant. It gives us the
lets a wider approach to the performance of the whole
exact efficiency of machines and operators. Due to
factory. The aim of the paper is to increase the
this we are able to monitor the output of each
machine efficiency with the help of cumulative
machine and operator in each shift. It makes decision
recordings of the workers. There work has to be
making easy as the cumulative output is available.
monitored individually for which an excel sheet of
We are able to identify the underutilized machine by
their work has been generated. Work has to be
this report. Hence, we try to suggest optimum
monitored so that the individual losses can be find
solution to increase the efficiency.
out easily of workers as well as machines. This is
Productivity is the ratio of output to input [9].
done by OEE method by generating excel sheet.
Productivity improvement is one of the core
strategies towards manufacturing excellence and it Definition of TPM includes, its objective is creating a
also is necessary to achieve good financial and preventive maintenance (PM) system to extend the
operational performance. To increase productivity, machines’ or equipment’s’ useful life. Its objective is
two important function of productivity management optimizing the overall effectiveness of machines or
are: installation of most effective method of equipment’s can be applied in several departments
performing the operation and the control of such as engineering, production, and maintenance
resources –mainly plant and labor required in department [20]. The goal of TPM is to achieve zero
carrying out the operation. When higher productivity breakdown and zero defects related to equipment.
is expected the machine tool which are converting The consequence of reducing breakdowns and
raw state of the product into finish goods, must be defects is improvement on production rate, reduction
reliable. Reliability includes availability of the in costs, reduction in inventory and eventually,
machines with least down time [12]. increase in labour productivity [15]. The success of
the system depends largely on how accurately a
In the generation of agile manufacturing, the
problem is defined, thoroughly investigated and
machines and its functions are also becoming
properly carried out through a choice of solution. In
complex. OEE of a machine plays an important role
the industries huge losses/wastage occur in the
in present scenario where delivery and quality are of
manufacturing shop floor. This waste is due to
prime importance to customer. The Paper reports a

IJIRT 145890 INTERNATIONAL JOURNAL OF INNOVATIVE RESEARCH IN TECHNOLOGY 1078


© April 2018| IJIRT | Volume 4 Issue 11 | ISSN: 2349-6002

operators, maintenance personal, process, tooling an important performance measure for effectiveness
problems and non-availability of components in time of any equipment, careful analysis is required to
etc. Other forms of waste include idle machines, idle know the effect of various components. An excel
manpower, break down machine, rejected parts etc sheet can be used as simplest tool to measure and
are all examples of waste [5]. monitor true data collection [12].
We identified various losses-
Here, it is mostly concentrated with what the user
o Machine setting
needs rather than what he wants. In the present
o Machine inspection time
system things are done manually. The user needs
o No Manpower
certain application to monitor the efficiency of
o Power loss
machine and operator properly. New system is
o Material Not available
needed because the efficiency of the plant was less
o Machine Breakdown
and it was not possible to monitor the cumulative
efficiency of machines and operators and is very time Out of these power failures, materials N/A, machine
consuming and difficult to monitor the day to day break down losses were considered in the efficiency.
efficiency. Thus, we developed the new system in We generated specific codes for machine and
which we can monitor the cumulative efficiency of operators. We changed the excel format of report
machines and operators. document of January and did calculations with the
In company we have to monitor the monthly help of tools available in it to observe the efficiencies
performance of machines and operators to increase of machines and operators. We also gave the rating to
the productivity. In the present system we can the efficiencies of operators to know their
monitor the performance of machine of limited to a performance.
day only and even there is no such method to know The equipment efficiency is affected by the
operator’s performance. surrounding environment the OEE measure also
It is not possible to monitor the cumulative depend on the actions of operators as well as the
performance of machines and operators. Presently, production planning and control polices of the
we can monitor the output of the machines from the company [11].
output slip generated by the operators which is
OEE is a "best practice" way to monitor and improve
limited to a shift.
the effectiveness of your manufacturing processes.
The present system is complicated to use and has
OEE is simple and practical. It takes the most
some limitations. Following are the limitations-
common and important sources of manufacturing
 Cumulative monitoring is not possible
productivity loss, places them into three primary
 Sometimes manual calculation results into errors categories and distills them into metrics that provide
 Collective data is not available an excellent gauge for measuring where you are - and
 It is time consuming process how you can improve. OEE is essentially the ratio of
New system is needed and it has to be developed Fully Productive Time to Planned Production Time.
because existing system is very time consuming and In practice, however, OEE is calculated as the
data retrieval is difficult. Thus, we have to develop a product of Availability, Performance and
new system to eliminate limitations and problems in Quality[6,9.5,17] OEE is frequently used as a key
the existing system. metric in TPM (Total Productive Maintenance).’TPM
aims to increase the availability/effectiveness of
II. METHDOLOGY existing equipment in a given situation, through the
effort of minimizing input (improving and
As we began our project we did a detail study of the maintaining equipment at optimal level to reduce its
plant we observed that the efficiency of machines life cycle cost) and the investment in human
was less. As there was no tool with them to study the resources, which results in better hardware utilization
cumulative efficiency of machines we generated [3],and Lean Manufacturing programs and gives you
report format in Microsoft excel due to which it was a consistent way to measure the effectiveness of TPM
possible to observe cumulative data [11]. As OEE is

IJIRT 145890 INTERNATIONAL JOURNAL OF INNOVATIVE RESEARCH IN TECHNOLOGY 1079


© April 2018| IJIRT | Volume 4 Issue 11 | ISSN: 2349-6002

and other initiatives by providing an overall 18


framework for measuring production efficiency.
Machines on which project was carried out and their 3- 1142 h11 2 8 xxx MEB 900

functions- 1- 1

 CNC machines (5 machines) 20

 Automatic and manual edge binders (6 machines) 18

2- 1128 h9 2 8 xxx Kr-79 220


1- 0
20
18

Outp Ma Bre Pow Inp Outp Efficie Rati


ut t. ak er ut ut ncy ng
N/a dow off
n (in (in (in (in
(in min min) min min)
mi ) )
n)

450 10 440 460.4 104.65 2


7

450 20 440 460.4 109.20 2


Figure 1: Plant layout of section-4 7

Data Directory: - 1840 30 400 359.6 97.41 2


Da Emplo Mach Shi Hou Emplo Mach Tar
4
te yee ine ft rs yee ine get
2000 25 430 390.9 90.91 1
Code Code Name Name
1

2- 859 h17 2 8 xxx BHX 430


278 30 430 132.8 37.87 0
1-
2
20
18 1850 45 440 361.5 94.56 1
9
2- 855 h17 1 8 xxx BHX 430
1- Figure 2: sample recordings of data in January month
20
(NOTE: -the above two tables are combined. Due to
18
lack of space they are divided into two.)
2- 1125 h8 3 8 xxx kl-78 204
The above table shows,
1- 7
 The date on which certain worker did the
20
specific job.
18
 The employee code, machine code and name of
the machine on which the worker was working.
3- 1431 h8 2 8 xxx kl-78 220  Efficiency of the worker and his rating according
1- 0 to it.
20

IJIRT 145890 INTERNATIONAL JOURNAL OF INNOVATIVE RESEARCH IN TECHNOLOGY 1080


© April 2018| IJIRT | Volume 4 Issue 11 | ISSN: 2349-6002

 As we can see the material not available time and


breakdown time is more in most of cases so to
reduce them maintenance must be done properly.
 Use of preventive maintenance is very beneficial
and recommended here rather than breakdown
maintenance on which industry is currently
working.

III. CALCULATIONS
So, for calculation let us take example from the table
above
On 2nd Jan 2018, worker (Code No. =855) worked in
1st shift for 8 hours
He worked on BHX (h17),
Target to complete = 430 Output = 450
Material not available time = 20 minutes
Breakdown time= 0 Power Off time = 0
Input time (in min) = 440 Output time (in min) =
460.47
Efficiency =
Graphical representation of machine’s output to input
(target): -

From the above calculation we found out the


efficiency of worker is 109.20
And Rating is 2.
The rating of the worker is also found out from this.
Efficiency <90 then rating= 0
Efficiency > 90 then rating = 1
Efficiency > 95 then rating = 2
Similarly, for all the employees of CNC and Edge
binder the report of one month has been made on
Excel sheet to find out the efficiency of workers and
machines.
Efficiency calculation of CNC and Edge Binder
machine:

IV. RESULTS AND DISCUSSIONS


From the given table we can conclude the following
results: -
1. This whole data covers the work done by the
worker on specific machine, in specific shift, for
given hours.

IJIRT 145890 INTERNATIONAL JOURNAL OF INNOVATIVE RESEARCH IN TECHNOLOGY 1081


© April 2018| IJIRT | Volume 4 Issue 11 | ISSN: 2349-6002

2. It also covers target given to the worker and the  We are able to identify the underutilized
output by the worker in numbers and also in time machine by this report. Hence, we try to suggest
(in min). optimum solution to increase the efficiency.
3. With the help of this data we can calculate the  There are only some limitations to this data
average efficiency of worker. which are,
4. We can also find on which day workers were 1. This project has constraint up to
operating specific machines and also their output. manufacturing industries.
5. It also calculates the average efficiency of 2. This process is useful for batch or mass
machine. production.
6. Productivity of the machine as well as worker
REFERENCES
can be calculated by this data.
7. The red box in the table indicates that efficiency [1] Harsha G. Hegde, N. S. Mahesh, Kishan
of that machine is quite low and some Doss,’ To improve overall equipment
improvements has to be done in that area. effectiveness by TPM 5S technique’.
8. These procedures also tell about the breakdown [2] Raffaele Iannone and Maria Elena Nenni,’
time, material not available time, power off time Managing OEE to Optimize Factory
and according to it maintenance scheduling can Performance’.
be done. [3] ‘OEE Improvement by TPM Implementation:
9. All the data is calculated in minutes. A Case Study.’ Amit Kumar Gupta1, Dr. R. K.
10. With the above all mention points we can easily Garg
find out efficiency of machine also whether [4] ‘Implementation of OEE - Issues and
machine is working according to its efficiency or challenges’, Daniel Prajogo, Jan Olhager.
not. [5] ‘Overall Equipment Efficiency and
11. The data is calculated by Pivot table in Excel Productivity of a News Paper Printing
sheet which shows the following details like Machine of a Daily News Paper Company - A
machine code, employee code etc which is given Case Study’. Pradeep Kumar, Raviraj Shetty,
in the work done of this problem. Lewlyn L.R. Rodrigues.
12. There is also graphical representation table in [6] ‘A Literature Review on Overall Equipment
which you can see the input given and also Effectiveness’.Praveen Singh sisodiya,
output through which we can calculate the above Mushtaq Patel, Dr. Vivek Bansod
things. [7] ‘Implementation of OEE – issues and
13. From this data we can also manage the wages of challenges’. Amrik Sohal, Jan Olhager, Peter
the workers as you can give the rating to the O’Neill, Daniel Prajogo
works. [8] ‘Improvement of OEE by Measuring &
14. Also, incentives for the workers can be decided Analysis of Machine Speed, Total Stoppages
by this data from their ratings. and Implementation of Visual Display Board’.
Faraz Ali,Sana Sohail, Shahzad Nasim.
[9] ‘Combining Overall Equipment Efficiency
V. CONCLUSION
(OEE) and Productivity Measures as Drivers
 We generated a report in Microsoft Excel and for Production Improvements’.C. Andersson,
documented the output data in it of one month- M. Bellgran.
January. [10] ‘OEE Improvement By Tpm Implementation:
 We even came to know the types of losses A Case Study’. Jitendra Kumar.
occurring in the plant. It gives us the exact [11] ‘Analysis of critical factors for automatic
efficiency of machines and operators. measurement of OEE’. Richard Hedmana,
 Due to this we are able to monitor the output of Mukund Subramaniyanb , Peter Almström.
each machine and operator in each shift. It [12] ‘Optimization of Overall Equipment
makes decision making easy as the cumulative Effectiveness in A Manufacturing System’. M.
output is available.

IJIRT 145890 INTERNATIONAL JOURNAL OF INNOVATIVE RESEARCH IN TECHNOLOGY 1082


© April 2018| IJIRT | Volume 4 Issue 11 | ISSN: 2349-6002

VivekPrabhu, R. Karthick, Dr.G. Senthil


Kumar.
[13] Mr. Sujay Biswas, Dr. Abhijit Chakraborty &
Mrs. Nabanita Bhowmik, 'Improving
Productivity Using Work Study Technique',
Nov 2016.
[14] ‘OEE and equipment effectiveness: an
evaluation’. A.J. de Ron and J.E. Rooda.
[15] ‘Performance Measurement Using Overall
Equipment Effectiveness (OEE): Literature
Review & Practical Application Discussion’.
Peter Muchiri, Liliane Pintelon.
[16] ‘Evaluation of Oee In A Continuous Process
Industry On An Insulation Line In A Cable
Manufacturing Unit’. Disha M Nayak,Vijaya
Kumar M N, G.Sreenivasulu Naidu, Veena
Shankar.
[17] ‘5S Transfusion To Overall Equipment
Effectiveness (OEE) For Enhancing
Manufacturing Productivity’. Shekhar
Sahu,Lakhan Patidar, Pradeep Kumar Soni.
[18] Patange Vidyut Chandra ‘An Effort to Apply
Work and Time Study Techniques in a
Manufacturing Unit for Enhancing the
Productivity’ 8, August 2013.
[19] Harsha G. Hegde, N. S. Mahesh, Kishan
Doss,’ To improve overall equipment
effectiveness by TPM 5S technique’.
[20] ‘Performance Acceleration on Production
Machines Using the Overall Equipment
Effectiveness (OEE) Approach’. A Mansur, R
Rayendra, MI Mastur.

IJIRT 145890 INTERNATIONAL JOURNAL OF INNOVATIVE RESEARCH IN TECHNOLOGY 1083