Topographical - Plan N

1 : 500

289250
4593400
289100

Dirt R
oad

4593350

Shuakhevi region, mount Chirukhi surrounding area

Legend Bush
LTD "Geoservisi" Tbilisi, Mtkvari street #2
Observation area mob: 599 28 99 20; 593 75 00 58
406 033 073
1q.s. Residential house
Power transformer
Trench Director A. Chargeishvili
Stairs Property ID number
k.
56.24.41.531 CAD operator
g.
Sewage Gate
I. Ugrekhelidzee
Gas
1457.8
Registered territory Well, absolute mark Measurer
border
El. power pole G. Chachanidze
Barbed wire
Concrete wall UTM- International
Scale 1:500 Date 23.10.2018
21 N
41630 68
.5

12
Legend:

93
10130
1. Sector HQ building

0
2. Outside WC
6418
Existing 5 3. Generator building
4. Power transformer
5. Flag Poles
2 611
Tower
2915 6. New watch tower

70.0000
2170.06
1

15000
12510
23 24

A-A +-0.00 A-A


Gr-1 Gr-1
2170.68
6
7790
49966

8125

33231
3920

2170.03 Retaining wall (gabion),

4 2120
7592
196.7
Length 15m,
height +-2.05 m

34520 Existing elevation mark

2170.41
197.40 Designed elevation mark

19735
2168.73
3 B-B
Gr-2
Fence,
total length 118 m

Existing GBP fence

50770

2167.5
21 N
41630 68
.5

12
Legend:

93
10130
1. Sector HQ building

0
To existing sewage system
2. Outside WC

5 3. Generator building
4. Power transformer
5. Flag Poles
2 6. New watch tower

Water line(d=100 mm

70.0000
Diesel line (d=20 mm)

15000
12510
23 24
Sewage line (d=100 mm)

Power line

6
49966

Sewage well
8125

33231
Retaining wall (gabion),

4 To root cellar Length 15m,


height +-2.05 m

34520

19735
3 Fence,
total length 118 m

Existing GBP fence

50770

2167.5
N
Section A-A

+22181.96

HQ building contour
New watch tower contour
+5.95=2176.63

+2173.71
WC contour
1.04

0.64

0.50

0.50

.46
0.24

9.97

3
217

9.96

68.7
217

217

217

217
217

9.08
216
±0.00=2170.68

8.59
216

217
5%
+2170.06 +2169.96

216
5.8%

216

2050
-2.87 = 2167.81

Retaining wall
LEGEND: (gabion)
.36

Space to be filled Existing elevation


236

750 cubic meters

Ground to be kept intact


-2.800 Finished floor elevation

Ground to be removed
.36

2450 cubic meters


236

Designed grading elevation

8% Slope
Section B-B

N
+2181.96

New watch tower contour

Headquarter building contour +5.95=2176.63

Generator building contour


+4.0=2174.41

1.89
217

217
9.70
9.36

.49

0.47
0.40
217 0.35

0
0.34

0.25
0.20

.84

0.01
9.96

0
216
216

217

217
217
217

217

217

7.91
217
±0.00=2170.68
216

+2170.41

216
LEGEND:
.36

Space to be filled Existing elevation


236

750 cubic meters

Ground to be kept intact


-2.800 Finished floor elevation

Ground to be removed
6
.3

2450 cubic meters


236

Designed grading elevation

8% Slope
Chirukhi Border Sector

HEADQUARTERS BUILDING

ARCHITECTURAL DESIGN

Tbilisi 2019
2 10 16 19 8
36 3 2 18 3 3 3 10 11
28 28 34 14 1
15 3 25 25 25 8 3 3
4 8 17 8 3 3 3
4 4 10
36 14 3 18
2 26
3 8 3 3 8 31
19 27
37 4 4 3 3 3
36 38 3 25 25 25
27 14 1 3 3 3
36 26 3 2
38 38
37 37

20 4 4 4 4 2 2 2
21 10 13 13 39 39 39 32
37 37
38 38 5 40 1 1 1 1 1 1 1 6 7
2 29
23 24 12 39 39 39
13 2
3 3 4 3 3 4 3 3 4 3 35 6
2
10 17 2 9
2 2
30 30
3 3 4 3 3 4 3 3 4 3 2
39 39 39 39
22 28 2
6 6
2 39 39 39 39
28 8 1 1 1 1 1 1 1
3 3 2 39 39 39 39 9 33
22 28 3 3 4 4 4 4 2

26 5

Director Parsons: Scale 1:100 2019


Modified by Stage Sheet

NOTE: For legend see page A-1' Chirukhi border sector


Drawn by Critical A-1

Checked by
Furniture Layout
Legend

Director Parsons: Scale N/A 2019


Modified by Stage Sheet Sheets
Chirukhi border sector
Drawn by Critical A-1'

Checked by
Furniture List
Explication:
25 1. Hall/Corridor
3.23sm 2. Break room
24 3. Barack
5.07sm
4. Dinning room
23 5. Kitchen
2.03sm
6. Grocery storage
D 7. Boiler room
8. Class room
22 13 9. Officers room
2.03sm
10.10sm 12 11 10 9 8 7 6 10. Deputy Head room
13.23sm 13.55sm 13.23sm 19.72sm 21.33sm 13.35sm 13.63sm
21
11. Sector Head office
2.03sm 12. Interview room
13. Bedroom for female
personnel
14. Corridor
20 14 15. Server room
11.28sm 9.80sm
16. Specialized equipment
C room
17. C2 / Duty room
15 16 18. Shower room
8.25sm 10.47sm 19. Locker room
19 1 2 3 4 5 20. Washer room
6.70sm 52.61sm 19.91sm 22.19sm 14.19sm
62.94sm 21. WC
22. WC
23. WC
18 17 24. WC
9.90sm 27.11sm 25. WC/shower for female
personnel
B

1 2 3 4 5 6 7

Legend:
1. Exterior (facade) walls - 15 cm thick sandwich panels - 438 square meters.
2. Interior partition walls - 7 cm sandwich panels - 481 square meters.
3. Ceiling - 15 cm thick sandwich panels - 413.9 square meters.
4. Roof cover - 5 cm thick sandwich panels -
591.25 square meters.

Director Parsons Scale 1:100 2019


Modified by Stage Sheet
Chirukhi border sector
Drawn by Critical A-2

Checked by
Layout Plan. Dimensions
D W1 W1 W1 W1 W1 W1 W1 W2 W1
D8
W3 D5

W3 D5

W3 D5
D4 D9
D3 D9 D9 D9 D9 D7 D9
D9
W4
D3 D9 D2
C D9 D9 D9

D4
D11
W4 D9 D6
W6
D9 D9
D3

W4
W5
D1
B W1 W1 W1 W1 W1 W1
A W1

1 2 3 4 5 6 7

Director Parsons Scale 1:100 2019


Modified by Stage Sheet
Chirukhi border sector
Drawn by Critical A-4

Checked by
Door locations and specifications
4 5 6
3.100 2.200 3.000 2.950

0.05
0.900 0.900 11 Steps
(18.6X30)
D-10 W-7

10

11
D-10 D-10

9
W-7
D D
Legend
1. Storage room
2. Storage room

1 t-2 0.100 2 t-2


17.5 sq m 28.7 sq m

C C

4 5 6

Director Parsons: Scale 1:50 2019


Modified by Stage Sheet
Chirukhi border sector
Drawn by Critical A-4

Checked by
Root Cellar Plan
Metal flashing at ridge
Same color as roofing

+4.400
-0.700
+4.400

-0.700

+5.595 +4.400
C

-0.700

A +3.950

1 2 3
-0.700 4 5 6 7

Director Parsons Scale 1:100 2019


Modified by Stage Sheet
Chirukhi border sector
Drawn by Critical A-5

Checked by
Roof
Polyurethane sandwich panel (corrugated galvanized metal sheet)
painted with RAL 9002.

+5.595

Polyurethane sandwich panel (corrugated galvanized metal sheet)


paintied with color RAL 6005

+4.400

+3.950

+2.900 +2.900
+2.587
+2.400
+2.212

Metal door

-0.700 -1.000

0.750 5.600 5.600

11.950

A B C D

Director Parsons: Scale 1:100 2019


Modified by Stage Sheet Sheets
Chirukhi sector headquarter
Drawn by Critical A-6

Checked by
Facade in A-D axes
Polyurethane sandwich panel (corrugated galvanized metal sheet)
painted with RAL 9002.

+5.595
Profiled roofing paintied with color RAL 6005

+3.950

+2.900

+2.377 +2.377 +2.377 +2.377

Metal-plastic window

+1.677 +1.677 +1.677 +1.677

-0.700 -0.700

5.600 5.600 0.750

11.950

D C B A

Director Parsons: Scale 1:100 2019


Modified by Stage Sheet
Chirukhi sector headquarter
Drawn by Critical A-7

Checked by
Facade in D-A axes
Polyurethane sandwich panel (corrugated galvanized metal sheet) Polyurethane sandwich panel (corrugated galvanized metal sheet)
paintied with color RAL 6005 painted with RAL 9002.

+5.595

+4.400

+2.900

+2.400

Metal door

-0.400 -0.400
-0.800 -0.800
-0.700 -1.000

6.000 6.000 6.000 5.800 5.100 5.100

34.000

7 6 5 4 3 2 1

Metal-plastc window Metal-plastc window

Director Parsons: Scale 1:100 2019


Modified by Stage Sheet
Chirukhi sector headquarter
Drawn by Critical A-8

Checked by
Facade in 7-1 axes
Metal-plastic window Polyurethane sandwich panel (corrugated galvanized metal sheet) Polyurethane sandwich panel (corrugated galvanized metal sheet)
painted with RAL 9002. painted with color RAL 6005.

+5.595

+4.400

+3.950

+2.900 +2.900

+2.377 +2.400

+0.877

-1.000 -0.700

5.100 5.100 5.800 6.000 6.000 6.000

34.000

1 2 3 4 5 6 7
Metal Door

Director Parsons: Scale 1:100 2019


Modified by Stage Sheet
Chirukhi sector headquarter
Drawn by Critical A-9

Checked by
Facade in 1-7 axes
Floor Types Floor Type Location
1. Hall/Corridor 13. Bedroom for female personnel
t-1 2. Break room 14. Corridor
Ceramic granite 3. Barack 15. Server room
4. Dinning room 16. Specialized equipment room
Concrete screed 4 cm
5. Kitchen 17. C2 / Duty room
Thermal insulation with pumice 5 cm 6. Grocery storage 19. Locker room
Bituminous waterproofing membrane 1 layer 7. Boiler room 20. Washer room
8. Class room 21. WC
Reinforced concrete slab 9. Officers room 22. WC
10. Deputy Head room 23. WC
t-2 11. Sector Head office 24. WC
12. Interview room

1. Root cellar storage room


Concrete screed 4 cm
2. Root cellar storage room
Thermal insulation with pumice 5 cm
Bituminous waterproofing membrane 1 layer
Reinforced concrete slab

Sandwich panel

t-3 Metal flushing


Tile plinth around the whole room 18. Shower room
25. WC/shower room for female personnel
Ceramic granite
Concrete screed 4 cm
Thermal insulation with pumice 5 cm
Bituminous waterproofing membrane 1 layer
Reinforced concrete slab Director Parsons: Scale N/A 2019
Modified by Stage Sheet
Chirukhi border sector
Drawn by Critical A-10

Checked by
Floor types
Flagpole

Metal wheel
400

Galvanized Metal Tube = 70 mm

500
Cable

900
400
400 300 400 300 400

3700
Plan of installing borders
graveling and asphalting

7000

Galvanized Metal Tube = 100 mm


3000

Concrete (400 X 900 X 900 mm) Paving with concrete, inclination 5%

Graveling 12 cm

Ground
Metal Sheet
150 X 150 mm; S =
5 mm
300
600

Balast

Director Parsons: Order # 2019


Modified by Stage Sheet
Chirukhi border sector
Drawn by Critical A-11

Checked by
Flagstock
Joint between wall panel and ground beam Joint between wall panels in the corner
Panels installed vertically Panels installed vertically or horizontally D
D

A cut in panel facings made on the building site


Applied in objects with higher heat insulation requirements *

D - panel core thickness

D - panel core thickness

The joint between wall and roof panels


Panel installation on the roof ridge – slope sectional view Gutter eaves
Recommended for PW PUR-D panels, thickness 100, 120 and 160 mm.

D–panel core thickness

Director Parsons:
Modified by Stage Sheet Sheets

Drawn by Critical A-12

Checked by Joints
Chirukhi Border Sector

GENERATOR ROOM

ARCHITECTURAL DESIGN

Tbilisi 2018
Plan - scale 1:100 Roofing - scale 1:100 Section 1-1. Axis (A-B) scale 1:100
(Generator room) (Generator room) (Generator room)

1
Detail 1
Generator building
(A-gen-2)

800
W-1 W-1
B
4.000 4.000

5t 5t
3.200 3.200

16.45 m 2 Generator 2.200


Fuel storage room

4600

4600
10 t

16.69 m 2
Generator room
0.000 0.000
Diesel
Tanks W-1
A -0.450 -0.450
D-2 D-1

800
4600
600 3500 3500 600

50 3500 3500 50
A B
1 2 3
Rain gutter
Galvanized zinced metal pipe 10X10 cm

1
Facade. Axis(1-3) Facade. Axis(3-1) Facade. Axis(A-B)
scale 1:100 scale 1:100 scale 1:100
(Generator room) I (Generator room) (Generator room)
4.000 4.000 4.000 I

I
3.200 3.200 3.200

2.400
2.200

1.700
II II II

Detail 2
III

0.000 0.000
(A-gen-2) 0.000
III III
-0.450 -0.450 -0.450

3500 3500 3500 3500

7000 7000 4600

IV
1 2 3 3 2 1 A B

Facade. Axis(B-A) D-1 D-2 W-1


scale 1:100 1 EA 1 EA 2 EA
(Generator room) 4.000
Notes:
I. Sandwich panel 50 mm.
560

I
3.200
II. Sandwich panel 50 mm.
III. Concrete surface
IV. Basalt
Metal Louver
900
2200

2200

2200
1100

II
Metal Louver Floor tiles
540

0.000
III
-0.450

350 300 350 1000


Director Parsons: 2019
1000 1000 Modified by Stage Sheet Sheets
4600 Chirukhi border sector
Drawn by Critical A-gen-1 2

Checked by
B A Generator Room. Plans and Facades.
Detail 2.

To be filled with silicone

Screw with rubber gasket

Metal flush with bended


ends (same color as
sandwich panel

Detail 1.

1 4 3 7

Explanation:
1. Sandwich panel 50 mm.
5
2. Square pipe column
3. Self-drilling screw for
sandwich panels mounting
2 6 3 4. Self-drilling screw
4 5. Shaped element
6. Sealing tape
1 7. Insulation

Director Parsons: 2019


Modified by Stage Sheet Sheets
Chirukhi border sector
Drawn by Critical A-gen-2 2

Checked by
Detail 1. Detail 2.
Chirukhi Border Sector

OUTSIDE WC

ARCHITECTURAL DESIGN

Tbilisi 2019
Roofing 1:50
(WC)
Facade in 2-1 axis 1:50
(WC)
Plan 1:50
(WC) +3.650
Paving
Joint #1
4300
500 500 500 500 +3.000

2 2 Metal Plastic Window


W-1
1700

1300

2000

1300
2-pcs
3.00 m2 3.00 m2 b

1 1

500
3600
Joint #3 3600
4000

a b a b
500
1300

2 1
Metal Plastic Door
D-1
2-pc

Facade in A-B axis 1:50 Facade in B-A axis 1:50 Facade in 1-2 axis 1:50
(WC) (WC) (WC)
+3.650 +3.650 +3.650 +3.650

+3.000 +3.000 +3.000 +3.000

2200
+2.200 +2.200 +2.200

+1.700 +1.700

3600
1300
3600

a b
700
a b b a 1 2

Note:
Director Parsons: 2019
1. All drawings are in mm a. Metal roofing Modified by Stage Sheet Sheets
2. Elevations are in m b. Sandwich panel (5 cm) Chirukhi border sector
Drawn by Critical A-WC-1 1

Checked by
Outside Water Closet

You might also like