BOQ COSTING 391.

88 CR

ROCK RETRIAVAL STATEMENT


1 The total rock quantity from excavation is 745508 CUM
2 Considered total serviceable retrieval is 521856 CUM
3 Bifurcation of total retrieval is as below

a Surfacing work ( After applying Stone Norms) 62247.48


WMM 15914.433 Cum
S/Chips 26.50 mm 6438.7194 Cum
S/Chips 13.20 mm 4144.2626 Cum
S/Chips 6.70 mm 5331.4515 Cum
CTSB 33588.813 Cum
S/Chips 26.50 mm 7105.3258 Cum
S/Chips 22.40 mm 7105.3258 Cum
S/Chips 13.20 mm 7105.3258 Cum
S/Chips 11.20 mm 7105.3258 Cum
S/Chips 6.70 mm 5167.5097 Cum

b Permenant Work ( After applying Stone Norms) 261771.60 Cum


Stone (M101) 261771.60 Cum

100 % use in surfacing work


Restricted use of retrived rock in Permenant work.
BOQ COSTING 373.48 CR

ROCK RETRIAVAL STATEMENT


1 The total rock quantity from excavation is 745508 CUM
2 Considered total serviceable retrieval is 521856 CUM
3 Bifurcation of total retrieval is as below

a Surfacing work ( After applying Stone Norms) 62247.48


WMM 15914.43 Cum
S/Chips 26.50 mm 6438.72 Cum
S/Chips 13.20 mm 4144.26 Cum
S/Chips 6.70 mm 5331.45 Cum
CTSB 33588.81 Cum
S/Chips 26.50 mm 7105.33 Cum
S/Chips 22.40 mm 7105.33 Cum
S/Chips 13.20 mm 7105.33 Cum
S/Chips 11.20 mm 7105.33 Cum
S/Chips 6.70 mm 5167.51 Cum

b Permenant Work ( After applying Stone Norms) 410138.66 Cum


Stone Metal (M203) 12783.54 Cum
Stone Chips (M204) 135583.52 Cum
Stone (M101) 261771.6 Cum

100 % use in surfacing work


Restricted use of retrived rock in Permenant work.