1 The total rock quantity from excavation is 745508 CUM 2 Considered total serviceable retrieval is 521856 CUM 3 Bifurcation of total retrieval is as below
a Surfacing work ( After applying Stone Norms) 62247.48
WMM 15914.433 Cum S/Chips 26.50 mm 6438.7194 Cum S/Chips 13.20 mm 4144.2626 Cum S/Chips 6.70 mm 5331.4515 Cum CTSB 33588.813 Cum S/Chips 26.50 mm 7105.3258 Cum S/Chips 22.40 mm 7105.3258 Cum S/Chips 13.20 mm 7105.3258 Cum S/Chips 11.20 mm 7105.3258 Cum S/Chips 6.70 mm 5167.5097 Cum
b Permenant Work ( After applying Stone Norms) 261771.60 Cum
Stone (M101) 261771.60 Cum
100 % use in surfacing work
Restricted use of retrived rock in Permenant work. BOQ COSTING 373.48 CR
ROCK RETRIAVAL STATEMENT
1 The total rock quantity from excavation is 745508 CUM 2 Considered total serviceable retrieval is 521856 CUM 3 Bifurcation of total retrieval is as below
a Surfacing work ( After applying Stone Norms) 62247.48
WMM 15914.43 Cum S/Chips 26.50 mm 6438.72 Cum S/Chips 13.20 mm 4144.26 Cum S/Chips 6.70 mm 5331.45 Cum CTSB 33588.81 Cum S/Chips 26.50 mm 7105.33 Cum S/Chips 22.40 mm 7105.33 Cum S/Chips 13.20 mm 7105.33 Cum S/Chips 11.20 mm 7105.33 Cum S/Chips 6.70 mm 5167.51 Cum
b Permenant Work ( After applying Stone Norms) 410138.66 Cum
Stone Metal (M203) 12783.54 Cum Stone Chips (M204) 135583.52 Cum Stone (M101) 261771.6 Cum
100 % use in surfacing work
Restricted use of retrived rock in Permenant work.