Senthil Kumar Portfolio 1

You might also like

You are on page 1of 14

senthi

lkumar.
c
content
01 curriculum vitae 07 shoppingmall
02 basicdesign 08 schoolofarchitecture
03 singlespace 09 productdesign
04 residence 10 thenarratorium
05 school
06 rurals
curri
culum vi
tae
aboutme: softwares: academi
cworks:
sem 1:
NAME :C.
SENTHI
LKUMAR basicdesi
gn.

DOB :20-
08-
1997 sem 2:
singlespace.
14,PATHI
NETTAM-PADINAGAR, residence.
ALAGAPPAPURAM SOUTH,
KARAIKKUDI
,SIVAGANGAI, sem 3:
TAMILNADU -630 003 pri
maryschool.
restaurant.
7904128936
sem 4:
s
ent
hil
kumar
449882@gmai
l.
com i
nterests: rurals.
proposalofseewage,garbage
and drai
ngeforvillage.
#senthi
lyoungster
sem 5:
shoppi
ng mall.
languages:t
ami
l,engli
sh,
hindi
. schoolofarchitecture.

educati
on: sem 6:
b.arch -i
iird yeari
n fivest
arhotel
jkcollegeofarchi tecture,
dindigul. objecti
ve:
affli
ated to annauniversi
ty, seeking position asan intern
chennai. architectin an firm thatprovides
an oppurtunitywhereicontri bute
workshops: and gain knowledgeatprofessi on-
bamboo workshop. allevel.
photographyworkshop.
mangloretileworkshop.

csk
basi
cdesi
gn

li
vesketch watercolour
potpai
nti
ng

stenci
lcutti
ng dotrenderi
ng abstract
si
nglespace
concept:bi
o-mi
micry
theform wasevol
ved from honeycomb.

frontelevati
on

thi
sprojecti sused to design aspace
forlivi
ng with connecti
vityofmaximum i
nteri
orvi
ew
spacewith asinglezone.
here,theliving areai
sconnected
with di
ning areaand foyerwithout
merging odd formsand itisfunc-
ti
onal.

plan
itwasmyfi rstarchi
tecturalproject
to learn aboutsinglespacewith secti
on
suitablenaturallighti
ng.tt

topvi
ew
resi
dence
concept:recti
linear
theform hasbeen evolved by
merging thegeometri
calshapes
wi
th aspectto li
nes.

frontelevati
on

ground floorplan

secti
on
swimming pooli
splaced adjacentto the
residencewhich i
salso balanced wi
th
landscape.
si
teplan

from thisproject, ihavelearned


to connecteach spacei n the
residencewi th otherother
spaceswi thoutmaki ng i
todd
and making thespacesfuncti on-
aland aestheti c.
fi
rstfloorplan
exteri
orvi
ew
pri
maryschool
CONCEPT:i
rrati
onali
sm

theform i
sevolved from theletterd whi
ch hasboth
curvesand li
nesthatrendersi rrati
onali
sti
carchitec-
tureand evol
vestheprimaryschool.

FRONTELEVATI
ON

vi
ews

SI
TE PLAN
FLOOR PLAN
to desi
gn thebasi
clearning envi
ronmentfrom kinder-
gardern to st
andard vwhich i
sgiven wi
th mi
nimum f
a-
ci
liti
esand basicamenti
es.

parki
ng areaisprovi
ded attheentryofthesite
henceto avoi
d crowdyatmosphereneartheblock.

SCHOOLSECTI
ON
rurals
vi
llage:sambai
thevi llageissituated i
n rameshwaram atramnathapuram di
stri
cti
nt amilnadu.the
nameori gi
ned becauseofmi grati
on ofpeoplefrom coastalregi
on and also fortrad-
ing and occupation.

p
h h
o y
u s
s i
i c
n a
g l
s m
h o
e d
e e
t l
s based on thei
rsuggesti
onswe
havemadedesi
gn proposals.

seewagedi
1. sposalsystem
housi
ng:
wemetthepeoplemadeconversati
onsand recorded thei
r garbagedi
2. sposalsystem
vi
ewsand suggesti
onsand an i
navati
vedocument
ati
on ofthevi
llage.
drai
3. nagesystems.
shoppi
ng mall

concept:contemporary theparki
ng areai
sgi ven
atthebasementwith 489
carparki
ng.
shopping mallisavastprojectthatihave
undergonei n vth semester.
themai n objec-
hypermarketisalso lo-
ti
veisto know theconsumersmi nd and
cated atthebasefloor
whereto placetheshopswi th an shop-
abountan areaof2340
pi
ng atmosphere. basement sq.m

ground
rampleadi
ng to basementfloor
si
teplan
locati
on:di
ndi
gul

si
tearea:17.
5 acres
frontelevati
on
thefrontfacadeoftheshoppi
ng complexi
streated wi
th glassand
ori
ent
ati
on:
north -
east steelbarsmeanwhi
lethemlcppossesopeningsi
n thefrontf acade.

north
shoppi
ng mall
mlcpmul tilevelcarpark-
i
ng isgi ven to routethe
vehicleswi th 85 car
parking in each floor
with clearhei ghtof2. 5
m.

fi
rstfloor themlcpi sconneted with
second and fourth floor
thi
rd floor
oftheshoppi ng mall
comi
ng to thefirstfloorthe
coreliftsto theview scene
from theatri
um.
VI
EW

second floor

secti
on north
schoolofarchi
tecture
concept:stereotomi
cs

stereotomi
csi
sthekeyt aken
bymeto playthi
sprojectwith
planes.

schoolofarchitectureismy
ti
meprojectso ihavede-
si
gned theprojectwith mi
ni-
mum requi
rementsand amen-
ti
es.
ground floor fi
rstfloor second floor

frontelevati
on

vi
ews
theelevati
on istreated wi
th marble
stonesspeciallyspecifi
ed to denote
theplaneswhi ch i
sexcluded from
si
teplan thewallfor3”to 5”
PRODUCTDESI
GN
CONCEPT: OPENI
NG PROCESS
FOLDI
NG ARCHI
TECTURE
Folding asagenerativeprocessin archi
tecturaldesi
gn i
sessenti
all
y 600MM 1200MM

experimental:agnosti
c,non li
nerand bottom up.
ourinterestlieson,itcan beeasil
yfoldable,easyto carryand 254MM

comfortablefortheuser.
CORI
EN FURNI
TURE: ST
AGE2
MATERI
ALSTUDY CORIEN IS A SOLID ,NON POROUS ,HOMOGE- ST
AGE1 ST
AGE3

NEOUS SURFACI NG MATERIAL.


CONCRETE CLOTH: ITIS MANUFACTURED IN THREE THICKNESS :
6MM ,12MM ,19MM
FLEXIBLE THE MATERIALIS HEATRESISTANTUPTO 100 DEG
THIN ITIS REPAI
RABLE AND RENEWABLE
900MM

DURABLE CORIEN IS NON POROURS AND STAIN RESI


STANT ST
AGE4
WATERPROOF ST
AGE5

FI
RE RESI
STANCE
ST
AGE6

USBPORT
AL

F
OLDI
NG L
EDL
AMP

MULT
ITOUCH
DRAFT
ING T
ABL
E

ST
AND
DRAWER-
1
(F
OLDI
NG ST
OOL
)

DRAWER-2
(DRAF
TING T
OOL
S)

DRAWER-3
(DRAF
TING T
OOL
S)

DRAWER-4
objecti
ve: (REF
ERENCEBOOK)
FOLDABL
ECONCRET
E to desi
gn an product
CLOTHCHAI
R
forarchi tecturalstu-
F
OLDI
NG L
EG
dentswi th comfort-
ableworki ng
thenarratori
um

SI
RPAM 2K18
thenarratori
um

SI
RPAM 2K18

You might also like