PROJECT IMPLEMENTATION CONSULTANTS (PICs)
PUNJAB BARRAGE IMPROVEMENT PHASE-II (PBIP-I]) PROJECT
REHABILITATION & MODERNIZATION OF JINNAH BARRAGE
JOINT VENTURE OF ACE (Pvt) Lid, NESPAK (Put) Lud & SMEC INTERNATIONAL Py Lt
MEMORANDUM
To,
From: i
‘ Dr. Tabassum Zahoor
Maj (R) Ghulam Raza Khan ‘Aotkig Project Manager
Chief Resident Engineer Pics Jinnah Barrage Project
PICs, Jinnah Barrage Project | :
Ref. No: - JB/ICB-01/ MI 3151, Dated: September 8, 2014
REHABILITATION & MODERNIZATION OF JINNAH BARRAGE PROJECT (ICB-01)
Stiffener Plate at Lifting Lugs for Main Weir and Under Sluice
Reference: 1) JB/ICB-01/MI/1982, dated June 02, 2014. (Memo)
2) DCJV/JBIICB-01/SO/CR/CCC/1696, dated May 25, 2014 (Contractors letter)
3) LH/141/4231, dated June 02, 2014. (Your office letter)
Dear Sir,
The requirement of providing stiffener plates at lifting lugs of newly installed barrage gates has
already been clarified vide our letter quoted at ref.1 (Copy attached). Please note that this
strengthening has been necessitated due to deformation of lifting lugs in transportation of gates
from China which were straightened at site through heating process and hammering that
weakened the section and may cause failure during gate operation. The deformation was caused
solely due to improper packing, and negligent transportation which warranted remedial measures
at Contractor's end. Though it is an additional work but CCC's Mechanical Chief at site had
agreed for its rectifications during installation of gate leaves
Foregoing in view, Contractor's request for treating the subject work as a variation order and
demand for additional costs is totally uncalled for and does not need any consideration please.
Above is submitted for your information and further perusal please.
Ye
Maj vets a Khan
Chief Resident Engineer
Jinnah Barrage Project
Encl: As stated above
ce:
Deputy Project Manager, PICs, Lahore.
Mr. Aftab Bhatti, Office Engineer, PICs, Lahore.
Mr. Taugeer Sadaqat, Chief Mechanical Designer, NESPAK, Lahore.
Resident Engineer (Mechanical), PICs, Jinnah Barrage.
Office File @ @&
Way om
oaens
"Email: picslinnahsite@yahoo.com, Ph #: +92-0459-395152,
Postal Address: Employer/Consultant Office, Main Jinnah Barrage, Distt MianwaliPROJECT IMPLEMENTATION CONSULTANTS (PICs)
PUNJAB BARRAGE IMPROVEMENT PHASE-II (PBIP-IT) PROJECT
REHABILITATION & MODERNIZATION OF JINNAH BARRAGE
JOINT VENTURE OF ACE (Pvt) Lid. NESPAK (Pvt) Ltd. & SMEC INTERNATIONAL PL
MEMORANDUM
To,
From: a
| Mal (2) Gnulam Raza khan Aural oe
Chief Resident Engineer ;
Fcuicreh cain Peascs PCs, Jinnah Barrage Project
Ref. No: - JB/ICB-01/ MU 192. Dated: June 02, 2014
HABILITATION & MODERNIZATION OF JINNAH BARRAGE PROJECT (ICB-01
Stiffener Plate at Lifting Lugs for Main weir and Under Sluice
Reference: DCJV/JB/ICB-01/SO/CR/CCC/1696, dated May 25, 2014
Dear Sir,
The site input on Contractor's above referred letter is as under:
The contents of Contractor's letter are quite astonishing where three months extension for
barrage gates and subsequent removal of coffer dams has been requested for arrangement of
stiffener plates at lifting lugs. Installation of lifting plate has been necessiated due to deformation
Of lifting hooks in transportation of gates from China which were straightened at site through
heating process that weakened the section. This was solely due to improper packing, and
negligent transportation which warranted remedial measures at Contractor's own instead of
‘making it an excuse for asking extension in time. After discussion with CCC’s Mechanical Chief
at site, the matter has been resolved and the stiffener plates are being installed at iting lugs.
Contractor's request for extension of time, for delay in removal of coffer dams and processing of
variation order for additional costs based are thus totally uncalled for and does not need any
consideration.
Above is submitted for your information and further perusal please.
fhulam Raza Khan
Chief Resident Engineer
Jinnah Barrage Project
ce:
Deputy Project Manager, PICs, Lahore.
Mr. Abdul Gayyum, Coniractor Section, PICs, Lahore
Resident Engineer (Mechanical), PICs, Jinnah Barrage. @
Office File.
7 (my
Email picsinnahste@yahoocom Ph. +92.0450.395152
Postal Address: Employer/Consultant Office, Main Jinnah Barage, Dist! Mianwali