Professional Documents
Culture Documents
157 Supplying and stacking of good earth at site including royalty and cum
carriage nupto 5 km complete (earth measured in stacks will be
reduced by 20% for payment).
158 Supplying and stacking at site dump manure from approved source, cum
including carriage upto 5 km complete (manure measured in stacks
will be reduced by 8% for payment) :
Screened through sieve of I.S. designation 20 mm
159 Mixing earth and sludge or manure in the required proportion cum
specified or directed by the Officer-in-charge
160 Grassing with selection No. 1 grass including watering and Sqm
maintenance of the lawn for 60 days or more till the grass forms a
thick lawn, free from weeds and fit for mowing including supplying
good earth, if needed (the grass and earth shall be paid for
separately).
In rows 5 cm apart in both directions
161 Renovating lawns including weeding, cheeling the grass, forking the Sqm
ground, top dressing with sludge or manure, mixing the same with
forked soil, watering and maintaining the lawn for 60 days or more till
the grass forms a thick lawn free from weeds and fit for mowing and
disposal of rubbish as directed, including supplying good earth if
needed but excluding the cost of sludge or manure (The
manure/sludge shall be paid for separately).
TOTAL
ining Academy at Allahabad.
Quantity Unit Rate Amount
16877.32 65 1097025.8
28325.57 33 934743.81
28325.57 70 1982789.9
15579.06 45 701057.7
80 380 30400
1000 75 75000
1000 65 65000
1500 70 105000
10 170 1700
70 150 10500
10 800 8000
30 250 7500
30 450 13500
20 400 8000
9254675.71