1] ICT
Autolink ICT :-
- At moment starting ww49 (Dec'19) disable option "Yes/No" for those tested failed
at ICT to allow the ODC to track the actual qty of cycle test (NTF vs true reject)
for yield analysis. PIC Amzan/Zani
- Requested IT team to change ODC scripts to allow 1 + 2 cycle test. Confirmed with
QD (John Bosco on 2nd Dec 2019) there is no issue for made changes on ODC flow
cycle test count (from 1 cycle to 1 + 2 cycle). PIC Amzan/Zani
Nov 2019
G5
ICT =>
FCT #2 57.73
FCT #3 81.30
FCT #4 87.07
FCT #5 74.58
Ave: 75.61%
G3
ICT =>
FCT #1 39.23
FCT #2 50.19
FCT #3 Down
Ave: 44.38%
G3 UI pro
ICT =>
FCT #1 55.1%
G3 UI
ICT =>
- FCT - Amzan/Zani
G3
i) VCCReset Bit (20.79%)
ii) Lid Close Current (10.08%)
iii) Verify HV Charge Quits Before VCC (5.53%)
iv) Verify ADC Z OUT (3.03%)
v) Wake Up Test (2.45%)
G5
T1128 FCT#2 - Test board relay defective. Closed (3.41%)
T1132A FCT#2 - Fixture test board caused the NTF and under analysis. (3.30%)
T1047 FCT#3/#5 (3.28%)
T1048G All testers (2.41%)
T1050 FCT#3/#5 (2.33%)
4] Test Capacity :-
- Further discussion among the team (prod, planner, program & test) to have "0.5"
FCT tester/day for PM & debug usage. PIC Amzan