You are on page 1of 2
Indian‘ BARAUNI REFINERY i Ref.: GM (PN) / Office Order-05/04 13-May-2019 OFFICE ORDER Subject : “Condemnation of Redundant old Equipments” for compliance to ESA-9 recommendation in AVU I/II and old FGC in RFCCU ‘As per External Safety audit (ESA-9) conducted in Jan-2018 by OISD, disposal of redundant old equipments in AVU | & Il and old FGC in RFCCU is recommended. In this regard, various rotary and static equipments such a pumps, vessels, exchangers, including process piping etc to be Identified for dismantling, List of these equipments will be circulated to all refineries for any Possibility of re-utilization; however in absence of confirmation on firm usage, Condemnation of said equipments needs to be done in line of recommendation. In view of above multi-disciplinary committee of following members is constituted for the purpose: sl. Name/Designation Sh. Name/Designation No No 1_| Shri Mohit Rastogi, DGM(PN)-Convener_|_7 suman Kumar, SMNM(EL) 2_| Shri Manish Ranjan, CESM 8 S Chundawat, SITM 3_| Shri D Shah, CMNM 9 ram X Baba, STSM 4_| Shri RK Agarwal, CFM 10 in Gupta, IPM 5 | Shri R Venkatesh, SMTM(P) it ay Kumar, M(HSE) a 6_| ShriJignesh Desai, SPNM The committee members can co-opt for any other member(s) for the said exercise as deemed necessary. Terms of reference of committee are as under: 1. To conduct site visits and physically verify the equipments planned for dismantling and keep equipment data for reference Page 1 of 2 2. To explore reuse of redundant equipment within BR, in other refineries or in new projects through RHQ (PS-PJ) and take confirmation, if any 3. If reuse or any re-utilization is not feasible, condemnation of asset to be done by working out written down value and suggest reserve pri up for timely , $0 that same may be taken posal to clear space and meet recommendation Report is to be prepared by 1% Jul-19 and after approval shall be submitted to stores for proceeding to disposal of equipments. 4 (MA Choudhary) General Manager (Production) Copy to: 1. CGM (TS&HSE) /CGM (T) 2. GM (ES&INSP)/ GM (TS&HSE) / GM (MN)/ GM (P&U, Inst)/ GM(F) 3. ED- for kind information Page 2 of 2

You might also like