Professional Documents
Culture Documents
S1 PDF
S1 PDF
3.50 3.50
As1 As2
MARK "L" "W" "t"
(BOTTOM) (BOTTOM)
1 CF2
CF2
50mm x 100mm x 1.2mm thk.
C-PURLINS SPACED CF1 1200 1200 300 6-Ø16 6-Ø16
@ 600mm.O.C.
2.50
CF1
CF1
W/ 121" x 121" x 16
3
" CF2 1200 1200 300 6-Ø16 6-Ø16
THK. ∠ BAR CLEATS
2 100mm THK. SLAB
ON-FILLW/ 10 mm Ø
REBARS @400mm O.C.
5 SCHEDULE OF FOOTING
2.25
3 CF2
S 1 SCALE NTS
2.25
CF1 CF1
CF1
L
4 CF2
0.75
SCHEDULE OF COLUMN
3.00
fc = 3,000 psi
0.35
H
CF1 CF1 CF1 fy = 40,000 psi
0.75
W
5
RAFTERS
RAFTERS
RAFTERS
RAFTERS
RAFTERS
RAFTERS
RAFTERS
RAFTERS
RAFTERS
RAFTERS
CF2
COLUMNS C.1
WF WF
0.35
T
GROUND
3.05
FLOOR LEVEL
0.75
WF TO ROOF LEVEL
0.75 0.75
L
6 MAIN LONG BARS
and TIES
8pcs-Ø12mm VERTICAL
BARS W / Ø10mm TIES
SPACED @ 0.10 M. O. C
(2 SETS).
0.75
7
H
0.75
W
0.35
3.50 3.65 4.85 1.72
2 ROOF FRAMING PLAN
T
17.50
S 1 SCALE 1:100MM
0.75
1. THE MAXIMUM COMPRESSIVE STRENGTH OF CONCRETE
0.75 0.75
AS FOLLOWS: L
WALL FOOTINGS, SLABS-ON-FILL fc' = 20.70 Mpa
1 FOUNDATION PLAN BEAMS, SLABS, STAIRS fc' = 20.70 Mpa
S 1 SCALE 1:100MM
300
Fy = 230.00 Mpa FOR BARS 12mm Ø AND SMALLER 2-12mm dia continous TOP BARS
2-12mm dia continous
300
3. THE ACTUAL SOIL BEARING PRESSURE SHALL NOT BE
LESS THAN 145 Kpa AND ALL FOOTING DEPTHS SHALL 2-12mm dia continous BOTTOM BARS *STIRRUPS TYPICAL TIES
150 5 FOUNDATION PLAN
S 1 SCALE NTS
BE CARRIED TO A DEPTH OF NOT LESS THAN 1.20 SPACING, 3@ 0.05 2 @ 0.10 2-12mm dia continous
2* 0.15, REST @ 0.20m
METERS FROM THE EXISTING NATURAL GRADE LINE.
300
2-12mm dia continous
LINTEL BEAM LINTEL BEAM 4. ALL STRUCTURAL STEEL AND ANCHOR BOLTS SHALL
CONFORM TO THE MINIMUM REQUIREMENT OF ASTM
SEE GENERAL CONSTRUCTION
A-36 AND ASTM A-307 RESPECTIVELY. NOTES TO VERIFY MASONRY 4" CHB WALL
WINDOW
6 TYPICAL BEAM DETAIL OUTLINE OF CHB
WALL FOR WF-1A
WALL REINFORCEMENT SEE GENERAL CONSTRUCTION
NOTES TO VERIFY MASONRY
WALL REINFORCEMENT
OPENING 5. ANY CONFLICT IN PLANS AND SPECIFICATIONS SHALL S 1 SCALE NTS
600
(TYP.) BE REFERED TO THE ARCHITECT AND/OR ENGINEER
DOOR FINISH FLOOR LINE DOWEL BARS TO MATCH
OPENING FOR FINAL REVIEW AND APPROVAL. 6"CHB WALL CHB WALL VER. BARS
VARIES
6. NO DOWNSPOUT SHALL BE ALLOWED TO BE EMBEDDED
IN STRUCTURAL CONCRETE UNLESS APPROVED BY THE
STRUCTURAL ENGINEER IN WRITING.
400
DOWEL BARS TO MATCH 300
400
7. ALL MASONRY UNITS SHALL HAVE A MINIMUM COMPRESSIVE
1.46
2-Ø12mm (TYP.) 2-Ø10mm (TYP.)
0.50
STRENGTH OF 3.45 Mpa AND SHALL BE SOLIDLY FILLED 2-10mmØ LONG'L
BOTTOM BARS
0.50
WITH GROUT. WALLS SHALL BE REINFORCED WITH 12mm Ø
VERTICAL BARS SPACED @ 400mm O.C. AND 10mm Ø
1.25
1.00
3 DETAIL WALL HORIZONTAL BARS SPACED @ EVERY THREE LAYERS OF
CONCRETE MASONRY UNITS UNLESS OTHERWISE INDICATED. 12mmØ TRANSVERSE
12mmØ TRANSVERSE
BOTTOM BARS SPACED
2.00
2-10mmØ LONG'L
BOTTOM BARS
4 GENERAL NOTES
S 1 SCALE NTS 7 TYPICAL WALL FOOTING TIE BEAM 7 TYPICAL WALL FOOTING DETAIL