You are on page 1of 6

SUPER MULTIPLE JUNCTION (SMJ)

LHD MODELS
Installation
To install SMJ, tighten bolts until orange ‘‘fulltight’’ mark appears
and then retighten to specified torque as required.
: 3 - 5 Nzm
(0.3 - 0.5 kg-m, 26 - 43 in-lb)
CAUTION:
Do not overtighten bolts, otherwise, they may be damaged.

CEL773

CEL789

RHD MODELS
Installation
To install SMJ, tighten bolts until orange ‘‘fulltight’’ mark appears
and then retighten to specified torque as required.
: 3 - 5 Nzm
(0.3 - 0.5 kg-m, 26 - 43 in-lb)
CAUTION:
Do not overtighten bolts, otherwise, they may be damaged.

CEL841

CEL842

EL-317
SUPER MULTIPLE JUNCTION (SMJ)

Terminal Arrangement

CEL774
FUSE BLOCK — Junction Box (J/B)

Terminal Arrangement

CEL775
FUSE AND FUSIBLE LINK BOX

Terminal Arrangement

CEL776
ELECTRICAL UNITS

Terminal Arrangement

NCEL777
JOINT CONNECTOR (J/C)

Terminal Arrangement

CEL778

You might also like