Subscriber - INVERSIONES INTERNACIONALES - Installation - Report
Subscriber - INVERSIONES INTERNACIONALES - Installation - Report
GRANADA : 1 to INVERSIONES
INTERNACIONALES
LINKPlanner Installation Report
03 February 2020
josé Ulloa
Organization: Telefonia Celular de Nicaragua
Phone: +505-89644787
Email: joseulloa248@gmail.com
Summary
AP Name NODO GRANADA : 1
Group Name
Hub Name NODO GRANADA
SM Name INVERSIONES INTERNACIONALES
Customer Company Name Telefónica Nicaragua
Link Type No Profile
AP Equipment Type ePMP 1000 (running Release 4.4)
SM Equipment Type ePMP Force 180 (running Release 4.4)
Maximum Obstruction 0 meters
Link Distance 1.093 kilometers
Free Space Path Loss 107.11 dB
Excess Path Loss 0.00 dB
RF Frequency Band 4.9 GHz (4900 to 5000 MHz)
RF Channel Bandwidth 20 MHz
DL/UL Ratio 50/50
Page 1 of 4
Project Sistemas PmP TOSE - PMP Link NODO GRANADA : 1 to INVERSIONESLINKPlanner
INTERNACIONALES
version 5.2.2 Installation Report
Path Profile
45 45
NODO GRANADA INVERSIONES INTERNACIONALES
Height Above Sea Level (meters)
35 35
30 30
25 25
20 20
15 15
10 10
5 5
Cambium Networks - LINKPlanner
0 0
0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 1.05
Range on path (kilometers)
Bill of Materials
Part Number Qty Description
C000000L065 1 Gigabit Surge Suppressor (30V)
C050900C271 1 ePMP 1000: 5 GHz Force 180 Integrated Radio (ROW) (EU cord).
Kit includes radio with antenna, power supply, line cord and mounting bracket
EW-E2EP10SM-WW 1 ePMP 1000 ISM/CSM/Force 180/Force 190 Extended Warranty, 2 Addl Years
Page 2 of 4
Project Sistemas PmP TOSE - PMP Link NODO GRANADA : 1 to INVERSIONESLINKPlanner
INTERNACIONALES
version 5.2.2 Installation Report
Installation Instruction
Perform the following checks during the installation (Check the deployment guide and the User Guide.)
1. Check with a GPS that you are installing at the correct location.
2. Check carefully the direction to Access Point. Either use a corrected compass or use the GPS waypoint
feature about 300 meters from the installation location.
3. When aligning antenna, it is important to find the centre of the main beam. This is done by adjusting the
antenna and monitoring the receive level until the peak is found. Once the peak level is found, it should be
checked against the prediced receive power to ensure that the antenna has not been aligned on a side
lobe.
Page 3 of 4
Project Sistemas PmP TOSE - PMP Link NODO GRANADA : 1 to INVERSIONESLINKPlanner
INTERNACIONALES
version 5.2.2 Installation Report
Cambium Networks assumes no responsibility for the accuracy of the information produced by the Cambium LINKPlanner. Reference to
products or services which are not provided by Cambium Networks is for information purposes only and constitutes neither an endorsement
nor a recommendation. All information provided by the Cambium LINKPlanner is provided without warranty of any kind, either expressed or
implied.
All product or service names are the property of their respective owners. © Cambium Networks. 2020