You are on page 1of 1

A B C E F 3 2 1

1.50 2.18

4.50
4.08

PERSPECTIVE

FRONT ELEVATION RIGHT ELEVATION

A B C D E F

25.67
5.09 5.10 5.30 5.08 5.10

F E C B A 1 2 3
D
5.85

1.76
1.92
12.12

4.50
4.08
6.27

REAR ELEVATION LEFT ELEVATION

GROUND FLOOR PLAN

PROJECT ENGINEER PROJECT TITLE PROJECT OWNER SHEET CONTENT CAD BY: MGSP

THE TREE HUT RESORT


AS BUILT PLANS FOR THE TREE HUT RESORT AND PAVILLION MR. LUISITO MANALASTAS APP BY: VLPB AB 5
ENGR. MA. GLEIZA PO CE, RMP
AND PAVILLION PROJECT LOCATION PAVILLION - AS-BUILT PLANS REV. No 2
7
TIN NO. 501-172-106 PRC NO. 147509 #3 ROAD RUNNER ST. ST FRANCIS, PANDAYAN, MEYCAUAYAN, BULACAN Date: 10/24/2019
PTR NO. 4803015 DATE 1-29-2019

You might also like