December 18, 2019

NCR436_FRIENDLY
#9 3rd St., Goodrich Village, Brgy. Concepcion Uno, Marikina City

To: Building Administrator

Sir /Madame:
We would like to request for your authorization of the following GLOBE authorized personnel listed below to gain access to
our BTS room and antenna facilities within your premises to conduct the activities within the timeframe specified below.

COMMSEC
Eleazar Dalit Michael Chato Jayson Domagtoy Shernan Bautista
Alexander Bautista Mon-Bryan Miranda Russel Abutan Mark Anthony Brillantes
Harry Noe Carlos Antonio Michael Root Ryann Dalupang
Ryan Yokingco Jerome Lipata John Robert Cruz Fernando Sudayon
Rommel Alcantara Rae Vincent Ramos John Bryan Abanes Carl Joshua Ruiz
Geromino Cahilig Allen Glen Dumdum Ramcy Fetisan Kevin Atienza
Michael Tawagon Carl Angelo Tabuna James Altura Jay Jan Joe Sanorjo
Glen Reantaso

MOBICON
John Benson Aliado Kendra Desembrana Christian Jeff Reyno Rowel Vasquez
Jomar G. Aliado Homer Conrad Rain D. Lazaro Ceferino Dela Cruz Jr. Adrian Renzo C. Villacrusis
Jason Domingo Ricardo SJ. Gumiran Jasper Manalang Jeff Christian Reyno
Rohel Labrador Mary Chris C. Campos Jeraldine Tabingo Jasper Manalang
Shaira Nonato Jane Marie M. Catabay Fernando Geronimo Lendell Dela Cruz
Eujyn Sevilla Roy Castillo Cristobal Ruello Howel Villaroman
Arr Dy Santilices Jhunry Losaria Gordon Mina

TELTRENDS
Arthur Banigued Jhon mathew B. Alamag Jessie Lorega Noel Ulpato
Bernie Tabagan Jhonny B. Gamino Ryan Jake Idos Ryan Ela
Ahmad Sacatan Polangelo T. Valdez Ramon Servitillio Leonardo B. Serenio
Rojean Intia Jelvin D. Felices Bernie Cario Amelito E. Palarca
John Winson C. Del Rosario Edwin M. Egusquiza Armando Domingo Wedizier Evangelista
Jessie Mendoza Ricardo G. Valera Archie Catipon Joseph T. Cabillte
Paolo C. Mahinay Gilbert S. Luban Reveson Pavillon Basilio D. Carpio
Sandy Ulpato Mateo Matienzo Joluis Basanez Edsel N. Babasa
Benito Soral Webster B. kampton Benjamin M. Mondido Charlie Antonio Roma
PROJECT NAME: GLOBE WIRELESS EXPANSION
Globe Wireless Expansion Project Equipment Delivery of Materials/ Antenna Dismantling/ Site Audit/ Site
ACTIVITY: Survey/ Equipment Installation and Changeout/ Integration/ Commissioning/ Power Tapping/ TroubleShooting/
BFT / Rectification/ Picture Taking/ Pullout of Antenna/ PAT/ Maintenance.
DATE: January 29, 2020 - February 29, 2020
TIME: 12:00AM - 11:59PM
Thank you for your kind consideration.

Sincerely yours,

Marvin J. Piñon / PM
Area Manager, NCR Implementation
(09176882143)

Approved by,

ROCHE DELA CRUZ


Network Operations Area Head
Globe Telecom

SECOM-19
JA26-77-J
RAAWA CONTROL NUMBER
For validation, please call Globe Security Hotline numbers:
7303189 or 09176888545
December 18, 2019

NCR437_CANIOGAN
324 Dr. Sixto Antonio Ave Caniogan, City Of Pasig, NCR.

To: Building Administrator

Sir /Madame:
We would like to request for your authorization of the following GLOBE authorized personnel listed below to gain access to
our BTS room and antenna facilities within your premises to conduct the activities within the timeframe specified below.

COMMSEC
Eleazar Dalit Michael Chato Jayson Domagtoy Shernan Bautista
Alexander Bautista Mon-Bryan Miranda Russel Abutan Mark Anthony Brillantes
Harry Noe Carlos Antonio Michael Root Ryann Dalupang
Ryan Yokingco Jerome Lipata John Robert Cruz Fernando Sudayon
Rommel Alcantara Rae Vincent Ramos John Bryan Abanes Carl Joshua Ruiz
Geromino Cahilig Allen Glen Dumdum Ramcy Fetisan Kevin Atienza
Michael Tawagon Carl Angelo Tabuna James Altura Jay Jan Joe Sanorjo
Glen Reantaso

MOBICON
John Benson Aliado Kendra Desembrana Christian Jeff Reyno Rowel Vasquez
Jomar G. Aliado Homer Conrad Rain D. Lazaro Ceferino Dela Cruz Jr. Adrian Renzo C. Villacrusis
Jason Domingo Ricardo SJ. Gumiran Jasper Manalang Jeff Christian Reyno
Rohel Labrador Mary Chris C. Campos Jeraldine Tabingo Jasper Manalang
Shaira Nonato Jane Marie M. Catabay Fernando Geronimo Lendell Dela Cruz
Eujyn Sevilla Roy Castillo Cristobal Ruello Howel Villaroman
Arr Dy Santilices Jhunry Losaria Gordon Mina

TELTRENDS
Arthur Banigued Jhon mathew B. Alamag Jessie Lorega Noel Ulpato
Bernie Tabagan Jhonny B. Gamino Ryan Jake Idos Ryan Ela
Ahmad Sacatan Polangelo T. Valdez Ramon Servitillio Leonardo B. Serenio
Rojean Intia Jelvin D. Felices Bernie Cario Amelito E. Palarca
John Winson C. Del Rosario Edwin M. Egusquiza Armando Domingo Wedizier Evangelista
Jessie Mendoza Ricardo G. Valera Archie Catipon Joseph T. Cabillte
Paolo C. Mahinay Gilbert S. Luban Reveson Pavillon Basilio D. Carpio
Sandy Ulpato Mateo Matienzo Joluis Basanez Edsel N. Babasa
Benito Soral Webster B. kampton Benjamin M. Mondido Charlie Antonio Roma
PROJECT NAME: GLOBE WIRELESS EXPANSION
Globe Wireless Expansion Project Equipment Delivery of Materials/ Antenna Dismantling/ Site Audit/ Site
ACTIVITY: Survey/ Equipment Installation and Changeout/ Integration/ Commissioning/ Power Tapping/ TroubleShooting/
BFT / Rectification/ Picture Taking/ Pullout of Antenna/ PAT/ Maintenance.
DATE: January 29, 2020 - February 29, 2020
TIME: 12:00AM - 11:59PM
Thank you for your kind consideration.

Sincerely yours,

Marvin J. Piñon / PM
Area Manager, NCR Implementation
(09176882143)

Approved by,

ROCHE DELA CRUZ


Network Operations Area Head
Globe Telecom

SECOM-19
JA26-77-J
RAAWA CONTROL NUMBER
For validation, please call Globe Security Hotline numbers:
7303189 or 09176888545
December 18, 2019

NCR439_SANROQUE
Dela Paz Bldg.,A. Tuazon Ave.,Brgy. San Roque,Marikina City, NCR.

To: Building Administrator

Sir /Madame:
We would like to request for your authorization of the following GLOBE authorized personnel listed below to gain access to
our BTS room and antenna facilities within your premises to conduct the activities within the timeframe specified below.

COMMSEC
Eleazar Dalit Michael Chato Jayson Domagtoy Shernan Bautista
Alexander Bautista Mon-Bryan Miranda Russel Abutan Mark Anthony Brillantes
Harry Noe Carlos Antonio Michael Root Ryann Dalupang
Ryan Yokingco Jerome Lipata John Robert Cruz Fernando Sudayon
Rommel Alcantara Rae Vincent Ramos John Bryan Abanes Carl Joshua Ruiz
Geromino Cahilig Allen Glen Dumdum Ramcy Fetisan Kevin Atienza
Michael Tawagon Carl Angelo Tabuna James Altura Jay Jan Joe Sanorjo
Glen Reantaso

MOBICON
John Benson Aliado Kendra Desembrana Christian Jeff Reyno Rowel Vasquez
Jomar G. Aliado Homer Conrad Rain D. Lazaro Ceferino Dela Cruz Jr. Adrian Renzo C. Villacrusis
Jason Domingo Ricardo SJ. Gumiran Jasper Manalang Jeff Christian Reyno
Rohel Labrador Mary Chris C. Campos Jeraldine Tabingo Jasper Manalang
Shaira Nonato Jane Marie M. Catabay Fernando Geronimo Lendell Dela Cruz
Eujyn Sevilla Roy Castillo Cristobal Ruello Howel Villaroman
Arr Dy Santilices Jhunry Losaria Gordon Mina

TELTRENDS
Arthur Banigued Jhon mathew B. Alamag Jessie Lorega Noel Ulpato
Bernie Tabagan Jhonny B. Gamino Ryan Jake Idos Ryan Ela
Ahmad Sacatan Polangelo T. Valdez Ramon Servitillio Leonardo B. Serenio
Rojean Intia Jelvin D. Felices Bernie Cario Amelito E. Palarca
John Winson C. Del Rosario Edwin M. Egusquiza Armando Domingo Wedizier Evangelista
Jessie Mendoza Ricardo G. Valera Archie Catipon Joseph T. Cabillte
Paolo C. Mahinay Gilbert S. Luban Reveson Pavillon Basilio D. Carpio
Sandy Ulpato Mateo Matienzo Joluis Basanez Edsel N. Babasa
Benito Soral Webster B. kampton Benjamin M. Mondido Charlie Antonio Roma
PROJECT NAME: GLOBE WIRELESS EXPANSION
Globe Wireless Expansion Project Equipment Delivery of Materials/ Antenna Dismantling/ Site Audit/ Site
ACTIVITY: Survey/ Equipment Installation and Changeout/ Integration/ Commissioning/ Power Tapping/ TroubleShooting/
BFT / Rectification/ Picture Taking/ Pullout of Antenna/ PAT/ Maintenance.
DATE: January 29, 2020 - February 29, 2020
TIME: 12:00AM - 11:59PM
Thank you for your kind consideration.

Sincerely yours,

Marvin J. Piñon / PM
Area Manager, NCR Implementation
(09176882143)

Approved by,

ROCHE DELA CRUZ


Network Operations Area Head
Globe Telecom

SECOM-19
JA26-77-J
RAAWA CONTROL NUMBER
For validation, please call Globe Security Hotline numbers:
7303189 or 09176888545
December 18, 2019

NCR447_SANTOLAN
Deeco Bldg., Maria Comp., Marcos Highway, Brgy. Santolan, Pasig City.

To: Building Administrator

Sir /Madame:
We would like to request for your authorization of the following GLOBE authorized personnel listed below to gain access to
our BTS room and antenna facilities within your premises to conduct the activities within the timeframe specified below.

COMMSEC
Eleazar Dalit Michael Chato Jayson Domagtoy Shernan Bautista
Alexander Bautista Mon-Bryan Miranda Russel Abutan Mark Anthony Brillantes
Harry Noe Carlos Antonio Michael Root Ryann Dalupang
Ryan Yokingco Jerome Lipata John Robert Cruz Fernando Sudayon
Rommel Alcantara Rae Vincent Ramos John Bryan Abanes Carl Joshua Ruiz
Geromino Cahilig Allen Glen Dumdum Ramcy Fetisan Kevin Atienza
Michael Tawagon Carl Angelo Tabuna James Altura Jay Jan Joe Sanorjo
Glen Reantaso

MOBICON
John Benson Aliado Kendra Desembrana Christian Jeff Reyno Rowel Vasquez
Jomar G. Aliado Homer Conrad Rain D. Lazaro Ceferino Dela Cruz Jr. Adrian Renzo C. Villacrusis
Jason Domingo Ricardo SJ. Gumiran Jasper Manalang Jeff Christian Reyno
Rohel Labrador Mary Chris C. Campos Jeraldine Tabingo Jasper Manalang
Shaira Nonato Jane Marie M. Catabay Fernando Geronimo Lendell Dela Cruz
Eujyn Sevilla Roy Castillo Cristobal Ruello Howel Villaroman
Arr Dy Santilices Jhunry Losaria Gordon Mina

TELTRENDS
Arthur Banigued Jhon mathew B. Alamag Jessie Lorega Noel Ulpato
Bernie Tabagan Jhonny B. Gamino Ryan Jake Idos Ryan Ela
Ahmad Sacatan Polangelo T. Valdez Ramon Servitillio Leonardo B. Serenio
Rojean Intia Jelvin D. Felices Bernie Cario Amelito E. Palarca
John Winson C. Del Rosario Edwin M. Egusquiza Armando Domingo Wedizier Evangelista
Jessie Mendoza Ricardo G. Valera Archie Catipon Joseph T. Cabillte
Paolo C. Mahinay Gilbert S. Luban Reveson Pavillon Basilio D. Carpio
Sandy Ulpato Mateo Matienzo Joluis Basanez Edsel N. Babasa
Benito Soral Webster B. kampton Benjamin M. Mondido Charlie Antonio Roma
PROJECT NAME: GLOBE WIRELESS EXPANSION
Globe Wireless Expansion Project Equipment Delivery of Materials/ Antenna Dismantling/ Site Audit/ Site
ACTIVITY: Survey/ Equipment Installation and Changeout/ Integration/ Commissioning/ Power Tapping/ TroubleShooting/
BFT / Rectification/ Picture Taking/ Pullout of Antenna/ PAT/ Maintenance.
DATE: January 29, 2020 - February 29, 2020
TIME: 12:00AM - 11:59PM
Thank you for your kind consideration.

Sincerely yours,

Marvin J. Piñon / PM
Area Manager, NCR Implementation
(09176882143)

Approved by,

ROCHE DELA CRUZ


Network Operations Area Head
Globe Telecom

SECOM-19
JA26-77-J
RAAWA CONTROL NUMBER
For validation, please call Globe Security Hotline numbers:
7303189 or 09176888545
December 18, 2019

NCR449_STALLION
Stallion St., Rancho Estate I, Brgy. Concepcion Dos, Marikina City

To: Building Administrator

Sir /Madame:
We would like to request for your authorization of the following GLOBE authorized personnel listed below to gain access to
our BTS room and antenna facilities within your premises to conduct the activities within the timeframe specified below.

COMMSEC
Eleazar Dalit Michael Chato Jayson Domagtoy Shernan Bautista
Alexander Bautista Mon-Bryan Miranda Russel Abutan Mark Anthony Brillantes
Harry Noe Carlos Antonio Michael Root Ryann Dalupang
Ryan Yokingco Jerome Lipata John Robert Cruz Fernando Sudayon
Rommel Alcantara Rae Vincent Ramos John Bryan Abanes Carl Joshua Ruiz
Geromino Cahilig Allen Glen Dumdum Ramcy Fetisan Kevin Atienza
Michael Tawagon Carl Angelo Tabuna James Altura Jay Jan Joe Sanorjo
Glen Reantaso

MOBICON
John Benson Aliado Kendra Desembrana Christian Jeff Reyno Rowel Vasquez
Jomar G. Aliado Homer Conrad Rain D. Lazaro Ceferino Dela Cruz Jr. Adrian Renzo C. Villacrusis
Jason Domingo Ricardo SJ. Gumiran Jasper Manalang Jeff Christian Reyno
Rohel Labrador Mary Chris C. Campos Jeraldine Tabingo Jasper Manalang
Shaira Nonato Jane Marie M. Catabay Fernando Geronimo Lendell Dela Cruz
Eujyn Sevilla Roy Castillo Cristobal Ruello Howel Villaroman
Arr Dy Santilices Jhunry Losaria Gordon Mina

TELTRENDS
Arthur Banigued Jhon mathew B. Alamag Jessie Lorega Noel Ulpato
Bernie Tabagan Jhonny B. Gamino Ryan Jake Idos Ryan Ela
Ahmad Sacatan Polangelo T. Valdez Ramon Servitillio Leonardo B. Serenio
Rojean Intia Jelvin D. Felices Bernie Cario Amelito E. Palarca
John Winson C. Del Rosario Edwin M. Egusquiza Armando Domingo Wedizier Evangelista
Jessie Mendoza Ricardo G. Valera Archie Catipon Joseph T. Cabillte
Paolo C. Mahinay Gilbert S. Luban Reveson Pavillon Basilio D. Carpio
Sandy Ulpato Mateo Matienzo Joluis Basanez Edsel N. Babasa
Benito Soral Webster B. kampton Benjamin M. Mondido Charlie Antonio Roma
PROJECT NAME: GLOBE WIRELESS EXPANSION
Globe Wireless Expansion Project Equipment Delivery of Materials/ Antenna Dismantling/ Site Audit/ Site
ACTIVITY: Survey/ Equipment Installation and Changeout/ Integration/ Commissioning/ Power Tapping/ TroubleShooting/
BFT / Rectification/ Picture Taking/ Pullout of Antenna/ PAT/ Maintenance.
DATE: January 29, 2020 - February 29, 2020
TIME: 12:00AM - 11:59PM
Thank you for your kind consideration.

Sincerely yours,

Marvin J. Piñon / PM
Area Manager, NCR Implementation
(09176882143)

Approved by,

ROCHE DELA CRUZ


Network Operations Area Head
Globe Telecom

SECOM-19
JA26-77-J
RAAWA CONTROL NUMBER
For validation, please call Globe Security Hotline numbers:
7303189 or 09176888545
December 18, 2019

NCR451_ANASTASIA
#8 Zinnia St., Anastacia Village, Brgy. Nangka, Marikina City

To: Building Administrator

Sir /Madame:
We would like to request for your authorization of the following GLOBE authorized personnel listed below to gain access to
our BTS room and antenna facilities within your premises to conduct the activities within the timeframe specified below.

COMMSEC
Eleazar Dalit Michael Chato Jayson Domagtoy Shernan Bautista
Alexander Bautista Mon-Bryan Miranda Russel Abutan Mark Anthony Brillantes
Harry Noe Carlos Antonio Michael Root Ryann Dalupang
Ryan Yokingco Jerome Lipata John Robert Cruz Fernando Sudayon
Rommel Alcantara Rae Vincent Ramos John Bryan Abanes Carl Joshua Ruiz
Geromino Cahilig Allen Glen Dumdum Ramcy Fetisan Kevin Atienza
Michael Tawagon Carl Angelo Tabuna James Altura Jay Jan Joe Sanorjo
Glen Reantaso

MOBICON
John Benson Aliado Kendra Desembrana Christian Jeff Reyno Rowel Vasquez
Jomar G. Aliado Homer Conrad Rain D. Lazaro Ceferino Dela Cruz Jr. Adrian Renzo C. Villacrusis
Jason Domingo Ricardo SJ. Gumiran Jasper Manalang Jeff Christian Reyno
Rohel Labrador Mary Chris C. Campos Jeraldine Tabingo Jasper Manalang
Shaira Nonato Jane Marie M. Catabay Fernando Geronimo Lendell Dela Cruz
Eujyn Sevilla Roy Castillo Cristobal Ruello Howel Villaroman
Arr Dy Santilices Jhunry Losaria Gordon Mina

TELTRENDS
Arthur Banigued Jhon mathew B. Alamag Jessie Lorega Noel Ulpato
Bernie Tabagan Jhonny B. Gamino Ryan Jake Idos Ryan Ela
Ahmad Sacatan Polangelo T. Valdez Ramon Servitillio Leonardo B. Serenio
Rojean Intia Jelvin D. Felices Bernie Cario Amelito E. Palarca
John Winson C. Del Rosario Edwin M. Egusquiza Armando Domingo Wedizier Evangelista
Jessie Mendoza Ricardo G. Valera Archie Catipon Joseph T. Cabillte
Paolo C. Mahinay Gilbert S. Luban Reveson Pavillon Basilio D. Carpio
Sandy Ulpato Mateo Matienzo Joluis Basanez Edsel N. Babasa
Benito Soral Webster B. kampton Benjamin M. Mondido Charlie Antonio Roma
PROJECT NAME: GLOBE WIRELESS EXPANSION
Globe Wireless Expansion Project Equipment Delivery of Materials/ Antenna Dismantling/ Site Audit/ Site
ACTIVITY: Survey/ Equipment Installation and Changeout/ Integration/ Commissioning/ Power Tapping/ TroubleShooting/
BFT / Rectification/ Picture Taking/ Pullout of Antenna/ PAT/ Maintenance.
DATE: January 29, 2020 - February 29, 2020
TIME: 12:00AM - 11:59PM
Thank you for your kind consideration.

Sincerely yours,

Marvin J. Piñon / PM
Area Manager, NCR Implementation
(09176882143)

Approved by,

ROCHE DELA CRUZ


Network Operations Area Head
Globe Telecom

SECOM-19
JA26-77-J
RAAWA CONTROL NUMBER
For validation, please call Globe Security Hotline numbers:
7303189 or 09176888545
December 18, 2019

NCR454_ISIDROVIL
Jorge Salvador Bldg., 55 Gen. Malvar St. cor. P. Zamora St., Brgy. Jesus De La Peña, Marikina City.

To: Building Administrator

Sir /Madame:
We would like to request for your authorization of the following GLOBE authorized personnel listed below to gain access to
our BTS room and antenna facilities within your premises to conduct the activities within the timeframe specified below.

COMMSEC
Eleazar Dalit Michael Chato Jayson Domagtoy Shernan Bautista
Alexander Bautista Mon-Bryan Miranda Russel Abutan Mark Anthony Brillantes
Harry Noe Carlos Antonio Michael Root Ryann Dalupang
Ryan Yokingco Jerome Lipata John Robert Cruz Fernando Sudayon
Rommel Alcantara Rae Vincent Ramos John Bryan Abanes Carl Joshua Ruiz
Geromino Cahilig Allen Glen Dumdum Ramcy Fetisan Kevin Atienza
Michael Tawagon Carl Angelo Tabuna James Altura Jay Jan Joe Sanorjo
Glen Reantaso

MOBICON
John Benson Aliado Kendra Desembrana Christian Jeff Reyno Rowel Vasquez
Jomar G. Aliado Homer Conrad Rain D. Lazaro Ceferino Dela Cruz Jr. Adrian Renzo C. Villacrusis
Jason Domingo Ricardo SJ. Gumiran Jasper Manalang Jeff Christian Reyno
Rohel Labrador Mary Chris C. Campos Jeraldine Tabingo Jasper Manalang
Shaira Nonato Jane Marie M. Catabay Fernando Geronimo Lendell Dela Cruz
Eujyn Sevilla Roy Castillo Cristobal Ruello Howel Villaroman
Arr Dy Santilices Jhunry Losaria Gordon Mina

TELTRENDS
Arthur Banigued Jhon mathew B. Alamag Jessie Lorega Noel Ulpato
Bernie Tabagan Jhonny B. Gamino Ryan Jake Idos Ryan Ela
Ahmad Sacatan Polangelo T. Valdez Ramon Servitillio Leonardo B. Serenio
Rojean Intia Jelvin D. Felices Bernie Cario Amelito E. Palarca
John Winson C. Del Rosario Edwin M. Egusquiza Armando Domingo Wedizier Evangelista
Jessie Mendoza Ricardo G. Valera Archie Catipon Joseph T. Cabillte
Paolo C. Mahinay Gilbert S. Luban Reveson Pavillon Basilio D. Carpio
Sandy Ulpato Mateo Matienzo Joluis Basanez Edsel N. Babasa
Benito Soral Webster B. kampton Benjamin M. Mondido Charlie Antonio Roma
PROJECT NAME: GLOBE WIRELESS EXPANSION
Globe Wireless Expansion Project Equipment Delivery of Materials/ Antenna Dismantling/ Site Audit/ Site
ACTIVITY: Survey/ Equipment Installation and Changeout/ Integration/ Commissioning/ Power Tapping/ TroubleShooting/
BFT / Rectification/ Picture Taking/ Pullout of Antenna/ PAT/ Maintenance.
DATE: January 29, 2020 - February 29, 2020
TIME: 12:00AM - 11:59PM
Thank you for your kind consideration.

Sincerely yours,

Marvin J. Piñon / PM
Area Manager, NCR Implementation
(09176882143)

Approved by,

ROCHE DELA CRUZ


Network Operations Area Head
Globe Telecom

SECOM-19
JA26-77-J
RAAWA CONTROL NUMBER
For validation, please call Globe Security Hotline numbers:
7303189 or 09176888545
December 18, 2019

NCR456_SANROQUE2
Otto Shoes Bldg.,J.P. Rizal St.Brgy. San Roque,Marikina City NCR

To: Building Administrator

Sir /Madame:
We would like to request for your authorization of the following GLOBE authorized personnel listed below to gain access to
our BTS room and antenna facilities within your premises to conduct the activities within the timeframe specified below.

COMMSEC
Eleazar Dalit Michael Chato Jayson Domagtoy Shernan Bautista
Alexander Bautista Mon-Bryan Miranda Russel Abutan Mark Anthony Brillantes
Harry Noe Carlos Antonio Michael Root Ryann Dalupang
Ryan Yokingco Jerome Lipata John Robert Cruz Fernando Sudayon
Rommel Alcantara Rae Vincent Ramos John Bryan Abanes Carl Joshua Ruiz
Geromino Cahilig Allen Glen Dumdum Ramcy Fetisan Kevin Atienza
Michael Tawagon Carl Angelo Tabuna James Altura Jay Jan Joe Sanorjo
Glen Reantaso

MOBICON
John Benson Aliado Kendra Desembrana Christian Jeff Reyno Rowel Vasquez
Jomar G. Aliado Homer Conrad Rain D. Lazaro Ceferino Dela Cruz Jr. Adrian Renzo C. Villacrusis
Jason Domingo Ricardo SJ. Gumiran Jasper Manalang Jeff Christian Reyno
Rohel Labrador Mary Chris C. Campos Jeraldine Tabingo Jasper Manalang
Shaira Nonato Jane Marie M. Catabay Fernando Geronimo Lendell Dela Cruz
Eujyn Sevilla Roy Castillo Cristobal Ruello Howel Villaroman
Arr Dy Santilices Jhunry Losaria Gordon Mina

TELTRENDS
Arthur Banigued Jhon mathew B. Alamag Jessie Lorega Noel Ulpato
Bernie Tabagan Jhonny B. Gamino Ryan Jake Idos Ryan Ela
Ahmad Sacatan Polangelo T. Valdez Ramon Servitillio Leonardo B. Serenio
Rojean Intia Jelvin D. Felices Bernie Cario Amelito E. Palarca
John Winson C. Del Rosario Edwin M. Egusquiza Armando Domingo Wedizier Evangelista
Jessie Mendoza Ricardo G. Valera Archie Catipon Joseph T. Cabillte
Paolo C. Mahinay Gilbert S. Luban Reveson Pavillon Basilio D. Carpio
Sandy Ulpato Mateo Matienzo Joluis Basanez Edsel N. Babasa
Benito Soral Webster B. kampton Benjamin M. Mondido Charlie Antonio Roma
PROJECT NAME: GLOBE WIRELESS EXPANSION
Globe Wireless Expansion Project Equipment Delivery of Materials/ Antenna Dismantling/ Site Audit/ Site
ACTIVITY: Survey/ Equipment Installation and Changeout/ Integration/ Commissioning/ Power Tapping/ TroubleShooting/
BFT / Rectification/ Picture Taking/ Pullout of Antenna/ PAT/ Maintenance.
DATE: January 29, 2020 - February 29, 2020
TIME: 12:00AM - 11:59PM
Thank you for your kind consideration.

Sincerely yours,

Marvin J. Piñon / PM
Area Manager, NCR Implementation
(09176882143)

Approved by,

ROCHE DELA CRUZ


Network Operations Area Head
Globe Telecom

SECOM-19
JA26-77-J
RAAWA CONTROL NUMBER
For validation, please call Globe Security Hotline numbers:
7303189 or 09176888545
December 18, 2019

NCR460_PARKWOODS
Marigold Commodities Corp., Jenny's Ave. cor. Legaspi St., Brgy. Maybunga, Pasig City

To: Building Administrator

Sir /Madame:
We would like to request for your authorization of the following GLOBE authorized personnel listed below to gain access to
our BTS room and antenna facilities within your premises to conduct the activities within the timeframe specified below.

COMMSEC
Eleazar Dalit Michael Chato Jayson Domagtoy Shernan Bautista
Alexander Bautista Mon-Bryan Miranda Russel Abutan Mark Anthony Brillantes
Harry Noe Carlos Antonio Michael Root Ryann Dalupang
Ryan Yokingco Jerome Lipata John Robert Cruz Fernando Sudayon
Rommel Alcantara Rae Vincent Ramos John Bryan Abanes Carl Joshua Ruiz
Geromino Cahilig Allen Glen Dumdum Ramcy Fetisan Kevin Atienza
Michael Tawagon Carl Angelo Tabuna James Altura Jay Jan Joe Sanorjo
Glen Reantaso

MOBICON
John Benson Aliado Kendra Desembrana Christian Jeff Reyno Rowel Vasquez
Jomar G. Aliado Homer Conrad Rain D. Lazaro Ceferino Dela Cruz Jr. Adrian Renzo C. Villacrusis
Jason Domingo Ricardo SJ. Gumiran Jasper Manalang Jeff Christian Reyno
Rohel Labrador Mary Chris C. Campos Jeraldine Tabingo Jasper Manalang
Shaira Nonato Jane Marie M. Catabay Fernando Geronimo Lendell Dela Cruz
Eujyn Sevilla Roy Castillo Cristobal Ruello Howel Villaroman
Arr Dy Santilices Jhunry Losaria Gordon Mina

TELTRENDS
Arthur Banigued Jhon mathew B. Alamag Jessie Lorega Noel Ulpato
Bernie Tabagan Jhonny B. Gamino Ryan Jake Idos Ryan Ela
Ahmad Sacatan Polangelo T. Valdez Ramon Servitillio Leonardo B. Serenio
Rojean Intia Jelvin D. Felices Bernie Cario Amelito E. Palarca
John Winson C. Del Rosario Edwin M. Egusquiza Armando Domingo Wedizier Evangelista
Jessie Mendoza Ricardo G. Valera Archie Catipon Joseph T. Cabillte
Paolo C. Mahinay Gilbert S. Luban Reveson Pavillon Basilio D. Carpio
Sandy Ulpato Mateo Matienzo Joluis Basanez Edsel N. Babasa
Benito Soral Webster B. kampton Benjamin M. Mondido Charlie Antonio Roma
PROJECT NAME: GLOBE WIRELESS EXPANSION
Globe Wireless Expansion Project Equipment Delivery of Materials/ Antenna Dismantling/ Site Audit/ Site
ACTIVITY: Survey/ Equipment Installation and Changeout/ Integration/ Commissioning/ Power Tapping/ TroubleShooting/
BFT / Rectification/ Picture Taking/ Pullout of Antenna/ PAT/ Maintenance.
DATE: January 29, 2020 - February 29, 2020
TIME: 12:00AM - 11:59PM
Thank you for your kind consideration.

Sincerely yours,

Marvin J. Piñon / PM
Area Manager, NCR Implementation
(09176882143)

Approved by,

ROCHE DELA CRUZ


Network Operations Area Head
Globe Telecom

SECOM-19
JA26-77-J
RAAWA CONTROL NUMBER
For validation, please call Globe Security Hotline numbers:
7303189 or 09176888545
December 18, 2019

NCR462_MALINAO
A. Luna st., (formerly Jabson st.), Malinao, City Of Pasig, NCR, SECOND DISTRICT

To: Building Administrator

Sir /Madame:
We would like to request for your authorization of the following GLOBE authorized personnel listed below to gain access to
our BTS room and antenna facilities within your premises to conduct the activities within the timeframe specified below.

COMMSEC
Eleazar Dalit Michael Chato Jayson Domagtoy Shernan Bautista
Alexander Bautista Mon-Bryan Miranda Russel Abutan Mark Anthony Brillantes
Harry Noe Carlos Antonio Michael Root Ryann Dalupang
Ryan Yokingco Jerome Lipata John Robert Cruz Fernando Sudayon
Rommel Alcantara Rae Vincent Ramos John Bryan Abanes Carl Joshua Ruiz
Geromino Cahilig Allen Glen Dumdum Ramcy Fetisan Kevin Atienza
Michael Tawagon Carl Angelo Tabuna James Altura Jay Jan Joe Sanorjo
Glen Reantaso

MOBICON
John Benson Aliado Kendra Desembrana Christian Jeff Reyno Rowel Vasquez
Jomar G. Aliado Homer Conrad Rain D. Lazaro Ceferino Dela Cruz Jr. Adrian Renzo C. Villacrusis
Jason Domingo Ricardo SJ. Gumiran Jasper Manalang Jeff Christian Reyno
Rohel Labrador Mary Chris C. Campos Jeraldine Tabingo Jasper Manalang
Shaira Nonato Jane Marie M. Catabay Fernando Geronimo Lendell Dela Cruz
Eujyn Sevilla Roy Castillo Cristobal Ruello Howel Villaroman
Arr Dy Santilices Jhunry Losaria Gordon Mina

TELTRENDS
Arthur Banigued Jhon mathew B. Alamag Jessie Lorega Noel Ulpato
Bernie Tabagan Jhonny B. Gamino Ryan Jake Idos Ryan Ela
Ahmad Sacatan Polangelo T. Valdez Ramon Servitillio Leonardo B. Serenio
Rojean Intia Jelvin D. Felices Bernie Cario Amelito E. Palarca
John Winson C. Del Rosario Edwin M. Egusquiza Armando Domingo Wedizier Evangelista
Jessie Mendoza Ricardo G. Valera Archie Catipon Joseph T. Cabillte
Paolo C. Mahinay Gilbert S. Luban Reveson Pavillon Basilio D. Carpio
Sandy Ulpato Mateo Matienzo Joluis Basanez Edsel N. Babasa
Benito Soral Webster B. kampton Benjamin M. Mondido Charlie Antonio Roma
PROJECT NAME: GLOBE WIRELESS EXPANSION
Globe Wireless Expansion Project Equipment Delivery of Materials/ Antenna Dismantling/ Site Audit/ Site
ACTIVITY: Survey/ Equipment Installation and Changeout/ Integration/ Commissioning/ Power Tapping/ TroubleShooting/
BFT / Rectification/ Picture Taking/ Pullout of Antenna/ PAT/ Maintenance.
DATE: January 29, 2020 - February 29, 2020
TIME: 12:00AM - 11:59PM
Thank you for your kind consideration.

Sincerely yours,

Marvin J. Piñon / PM
Area Manager, NCR Implementation
(09176882143)

Approved by,

ROCHE DELA CRUZ


Network Operations Area Head
Globe Telecom

SECOM-19
JA26-77-J
RAAWA CONTROL NUMBER
For validation, please call Globe Security Hotline numbers:
7303189 or 09176888545