Professional Documents
Culture Documents
SINGAPORE
INCIDENT REPORT
Date of Preliminary report: 20 Jan.2020
Date of Intermediate report:
Date of Final report:
OUTLINE OF INCIDENT:C
while at Fancheng anchorage 20th January 2020, 14:00 hrs. 2/Engr. conducted routine piston ring and
liner inspection, found out badly wear down in no.4 cylinder piston rings, and partly sharpness on liner
scavenging port. Cylinder No.2 piston rings had also partly wear down.
1
MC SHIPPING LTD. SINGAPORE
COUNTER MEASURES:
SHIP’S PROFILE:
DELAY SCHEDULE:
CARGO DAMAGE: NA
2
MC SHIPPING LTD. SINGAPORE
DAMAGE :
OFF-HIRE:
Enclosures:
1. Relevant photographs: NA
2. SOF : NA / same as outline of incident
3. Other documents as required: NA