No. of Segment (including Initial 31 segments No. of Segment (including Initial 31 segments
and End Block) and End Block)
Casted 31 segments (100.0%) Casted 1 segment (3.2%)
Balance 0 segment (0.0%) Balance 30 segments (96.8%)
Prestressing Tendon at Deck Slab 166 - 0405 Tendons Prestressing Tendon at Deck Slab 116 - 0406 Tendons
Installed 164 - 0405 Tendons (98.8%) Installed 14 - 0406 Tendons (12.1%)
Stressed 158 - 0405 Tendons (95.2%) Stressed 11 - 0406 Tendons (9.5%)
Balance to stress 8 - 0405 Tendons (4.8%) Balance to stress 105 - 0406 Tendons (90.5%)
Prestressing Bars 174 - ø40mm PT Bars Prestressing Bars 174 - ø40mm PT Bars
Installed 174 - ø40mm PT Bars (100.0%) Installed 0 - ø40mm PT Bars (0.0%)
Stressed 10 - ø40mm PT Bars (5.7%) Stressed 0 - ø40mm PT Bars (0.0%)
Balance to stress 164 - ø40mm PT Bars (94.3%) Balance to stress 174 - ø40mm PT Bars (100.0%)