JETTY 2, PIPE MANIFOLD
Demolish Pipe 6” (T‐34) SS
Demolish Pipe 3” (T‐21) CS
Demolish Pipe 6” (T‐34) SS
Structure need to be remove
End of Pipe 3” (T‐21) CS
Demolish Pipe 3” (T‐34) CS
Demolish Pipe 6” (T‐34) SS
Demolish Pipe 6” (T‐34) SS Demolish Tee Reducer 6” (T‐34) CS
Demolish Pipe 8” (T‐34) CS
JETTY 1, PIPE MANIFOLD
Demolish Pipe 8” (T‐29) CS
Demolish Pipe 8” (T‐34) CS
Demolish Pipe 8” (T‐29) CS
Demolish Pipe 8” (T‐34) CS
Demolish Pipe 8” (T‐29) CS
Demolish Pipe 8” (T‐34) CS
MODIFIED GREETING
UP TO 200mm
Demolish Pipe 8” (T‐34) CS
Demolish Pipe 8” (T‐34) CS
Demolish Pipe 8” (T‐29) CS
Demolish Un‐use Pipe 8” CS
Demolish Pipe 8” (T‐29) CS
Demolish Pipe 8” (T‐34) CS