DETAILED QUANTITY ESTIMATE

Total Centre to Centre to centre length of outer wall in Ground Floor = 77.4m
Total Centre to Centre to centre length of inner wall in Ground Floor= 40.8m

Sr. No. Item Description Nos. Unit. Length(m) Breadth(m)


1 Earth Work in Excavation
1.1 Excavation for foundation 1 m3 72.45 0.9
1.2 PCC (1:1.5:3) in Foundation 1 m3 72.45 0.9
2 BrickWork in Foundation
2.1 1st step Brick Work 1 m3 74.1 0.6
2.2 2nd step Brickwork 1 m3 74.65 0.5
2.3 3rd step Brickwork 1 m3 75.2 0.4
Total
3 Earth Filling upto Ground Level
3.1 Soil Filling 1 m3
4 Plinth
4.1 CC Plinth (1:1:2) 1 m3 75.2 0.4
4.2 Cover for Plinth 1 m3 75.2 0.4
Deduction in CC used for Plinth
4.3 Reinforcement in Plinth
12mm dia Bar m3 75.2
Stirrup 6mm @ 150mm c/c distance m3
Total
Net Volume for CC used in plinth m3

5 Back Filling upto Plinth Level


5.1 Sand Filling 1 m3

6 DPC (50mm)
6.1 CC(1:2:4) for DPC 1 m2 75.2

7 Brick Work for Ground Floor


7.1 300mm Thick Wall 1 m3 75.75 0.3
Deduction for Outer Wall
7.1.1 Deduction of Windows
W2 2 m3 2.75 0.3
W5 2 m3 1 0.3
W3 2 m3 2.5 0.3
W1 1 m3 3 0.3
V1 3 m3 0.92 0.3
W4 1 m3 2 0.3

Deductions of Lintel
W2 2 m3 3.05 0.3
W3 2 m3 2.8 0.3
W1 1 m3 3.3 0.3
V1 3 m3 1.22 0.3
W4 1 m3 2.3 0.3

7.1.2 Deductions of Door


D1 1 m3 2.5 0.3
D2 1 m3 1.9 0.3

Deduction of lintels
D1+W5 1 m3 4.8 0.3
D2 1 m3 2.2 0.3

Total Brick Work After Deduction m3

7.2 150mm thick wall 1 m3 40.8 0.15


Deductions For inner Walls
7.2.1 Deductions for Doors
D3 2 m3 1.2 0.15
D4 2 m3 0.9 0.15
D5 2 m3 0.8 0.15

Deductions of Lintels
D3 2 m3 1.5 0.15
D4 2 m3 1.2 0.15
D5 2 m3 1.1 0.15

Total Brick Work m3

8 Slab For Ground Floor


8.1 CC(1:1.5:3)For Slab Area 1 m3 19.5 15.5

Taking Reinforcement =80Kg/m3 of Slab Are


8.2 Reinforcement For Slab kg
Deuction for Slab CC
Volume of Reinforcement m3
Area of Stair Case 1 m3 4.7 2.85

Net CC for Slab m3

9 Flooring for Area


9.1 200mm (1:2:4)thick CC
For Entry 1 m2 2.7 1.9
For Living Room 1 m2 8 7.75
For Dining hall 1 m2 6.5 5.25
For Passway 1 m2 10.9 1.2
For Bedroom 1 1 m2 6 4
For Bedroom 2 1 m2 4.2 4
For Kitchen 1 m2 4 3.45
For Laundry 1 m2 2 1.5
For Kithcen Store 1 m2 1.85 1.5
For Bathrooom Toilet 1 1 m2 4 2
For Bathrooom Toilet 2 1 m2 4 1.8

Add Door Sills


D1 1 m2 2.5 0.3
D2 1 m2 1.9 0.3
D3 2 m2 1.2 0.15
D4 2 m2 0.9 0.15
D5 2 m2 0.8 0.15

Total Flooring Area

10 Plastering For Ground Floor


CM(1:6) 12 mm thick
For Outer Wall 2 m2 66.39
For Inner Wall 2 m2 38.595

Total

11 Painting For Ground Floor m2


12 Painting For Celing m2

Total Centre to Centre to centre length of outer wall in


Total Centre to Centre to centre length of inner wall in

13 Brick Work 1st Floor


13.1 300mm Thick Brick Work 1 m3 36.575 0.3
Deduction for Outer Wall
Deduction of Door
D6 2 m3 1 0.3
Deduction of Lintel
D6 2 m3 1.3 0.3
Deduction of Windows
V1 2 m3 0.92 0.3
W3 1 m3 2.5 0.3
W4 1 m3 2 0.3
W6 1 M3 4.6 0.3

Deduction of Lintels
V1 2 m3 1.22 0.3
W3 1 m3 2.8 0.3
W4 1 m3 2.3 0.3
W6 1 m3 4.9 0.3
Total 300 mm brick Work m3

13.2 150mm Brick Work 1 m3 47.1 0.15


Deduction for Inner Wall
D4 4 m3 0.9 0.15
D3 2 m3 1.2 0.15
D5 1 m3 0.8 0.15

Deduction for lintel


D4 4 m3 1.2 0.15
D3 2 m3 1.5 0.15
D5 1 m3 1.1 0.15

Total 150 mm Brick Work

14 Slab For First Floor


14.1 CC(1:1.5:3)For Slab Area 1 m3 19.5 15.5
Taking Reinforcement =80Kg/m3 of Slab Are
Reinforcement For Slab kg
Deuction for Slab CC
Volume of Reinforcement m3

Net CC for Slab m3

15 Flooring Area 1st Floor


200mm (1:2:4)thick CC
For Room 1 1 m2 6 4
For Room 2 1 m2 4 4.15
For Bathroom 1 1 m2 4 2
For Bathroom 2 1 m2 4 2
For Study room 1 m2 4 3.45
For Store Room 1 m2 2 2.85
For Terrace 1 m2 6.75 3.45
For Terrace 1 m2 8 7.75
For Passage 1 m2 8.6 2.85
For balcony 2 m2 6 1.2

Add Door Sills


D4 4 m2 0.9 2.15
D3 2 m2 1.15 2.15
D5 1 m2 0.8 2.15
D6 2 m2 1 2.15

Total Flooring m2

16 Plastering of First floor


CM (1:6) 12mm thick
For outer wall 2 m2 29.65
For inner wall 2 m2 44.895

Total m2

17 Painting For Ground Floor m2


18 Painting For Celing m2
19 Balcony
CC(1:1:2) 2 m3 6 1.2
Taking Reinforcement =80Kg/m3 of Slab Are
Reinforcement for balcony slab 2 Kg
20 Brick work for parapet and balcony wall
For terrace area 1 m3 26.65 0.15
For balcony area 2 m3 8.4 0.15

Total

21 Enamel paint on door


D1 1 m2 2.5
D2 1 m2 1.9
D3 2 m2 1.2
D4 6 m2 0.9
D5 4 m2 0.8
D3’ 2 m2 1.15
Total
22 Stair case
CC(1:1.5:3) stair case flight slab 2 m3 3.5 0.15
2 m3 2.5 0.15
For landing 2 m3 2.7 0.15

Total cc for staircase

Taking Reinforcement =2% of the CC


Steel for stair case 1 m3

Net CC for slab


or = 77.4m
or= 40.8m

Height(m) Quantity Explainatory Notes

0.9 58.6845
0.3 19.5615

0.2 8.892
0.2 7.465
0.2 6.016
22.373

16.75

0.4 12.032
0.025 0.752

0.034
0.014
0.048
12.736

87.8148 Total Built up area Exculding Plinth area(219.537*0.4)

0.4 30.08

3 68.175

1.5 2.475
2.15 1.29
1.2 1.8
1.5 1.35
0.5 0.414
1.2 0.72
8.049

0.1 0.183
0.1 0.168
0.1 0.099
0.1 0.1098
0.1 0.069
0.6288

2.15 1.6125
2.15 1.2255
2.838

0.1 0.144
0.1 0.066
0.21

56.4492

3 18.36

2.15 0.774
2.15 0.5805
2.15 0.516

0.1 0.045
0.1 0.036
0.1 0.033
0.114
.
18.246

0.18 51.993 Area to be covered =288.85

orcement =80Kg/m3 of Slab Area


4159.44
Density of Steel =7850kg/m3
0.554
0.18 2.4111 Stair Case Area=(4.7*2.85)

49.0279

5.13
62
34.125
13.08
24
16.8
13.8
3
2.775
8
7.2
189.91

0.75
0.57
0.36
0.27
0.24
2.19
192.1

3 398.34
3 231.57

629.91

629.91 Same as plastering Area


192.1 Same as Flooring

to centre length of outer wall in First Floor =36.575m


e to centre length of inner wall in First Floor= 47.1m

3 32.9175

2.15 1.29

0.1 0.078

0.5 0.276
1.2 0.9
1.2 0.72
2.5 3.45
5.346

0.1 0.0732
0.1 0.084
0.1 0.069
0.1 0.147
0.3732
25.8303

3 21.195

2.15 1.161
2.15 0.774
2.15 0.258
2.193

0.1 0.072
0.1 0.045
0.1 0.0165
0.1335

18.8685

0.18 54.405 Area to be covered =302.25


orcement =80Kg/m3 of Slab Area
4352.4
Density of Steel =7850kg/m3
0.554

53.851

24
16.6
8
8
13.8
5.7
23.2875
62
24.51
14.4

7.74
4.945
1.72
4.3

219.0025
3 177.9
3 269.37

447.27

447.27
219.0025

0.18 2.592
orcement =80Kg/m3 of Slab Area
207.36

1 3.9975
1 2.52

6.5175

2.15 5.375
2.15 4.085
2.15 5.16
2.15 11.61
2.15 6.88
2.15 4.945
38.055

0.9 0.945
0.9 0.675
0.85 0.6885

2.3085

einforcement =2% of the CC


0.04617

2.26233
Rate Analysis
Sr No. Item Description Quantity Unit Rate(as per CPWD Delhi) in ₹ Per
1 Earth work excavation 58.6845 m³ 181.85 m³
2 Cement concrete (1:1.5:3) 19.5615 m³ 5924.65 m³
3 Damp proof course 30.08 m² 418.9 m²
4 Brick Work For Foundation (1:6)CM 25.83 m³ 4970 m³
5 Brick Work For Super Structure(Modular 119.39 m³ 5700 m³
Bricks)
6 R.C.C. (1:1.5:3) for lintels 2.31 m³ 9763.8 m³
7 R.C.C. (1:1.5:3) for slabs 107.77 m³ 6205 m³
8 Reinforcement 8719.2 kg 82.1 kg
9 Cement concrete (1:2:4) for flooring 411.1 m² 498.35 m²
10 Plastering to all exposed surfaces with 1:6 1077.18 m² 292.85 m²
CM
11 Supply and fixing of country wood for doors 52.584 m² 2942.3 m²
(30mm thick)
12 Supply and fixing of country wood for 60.48 m² 2942.3 m²
windows and ventilator
13 White washing 1488.2825 m² 38.95 m²
14 Painting with two coat on walls with 1488.2825 m² 113.9 m²
premium acrylic emulsion paint
15 Painting with enamel paint on door 38.055 m² 177.15 m²

16 Flooring with marble 411.1 m² 888.95 m²


Total
17 Provision for staircase @ 1.5%
18 Provision for water supplyand sanitary
arrangements @12.5%
19 Provision for electrification @ 7.5%
20
Provision for architectural apperance @ 2%
21 Provision for P.S and contigencies @4%
Total
Amount
₹ 10,671.78
₹ 115,895.04
₹ 12,600.51
₹ 128,375.10

₹ 680,523.00

₹ 22,554.38
₹ 668,712.85
₹ 715,846.32
₹ 204,871.69

₹ 315,452.16

₹ 154,717.90

₹ 177,950.30

₹ 57,968.60

₹ 169,515.38

₹ 6,741.44

₹ 365,447.35
₹ 3,807,843.80
₹ 57117.657

₹ 493,478.58

₹ 296,087.15

₹ 78,956.57

₹ 157,913.15
₹ 3,807,843.80