While vessel continuously discharging cargo using Deck crane 1 to 4 and Grab Bucket 1 to 4 at
Kandla Port, India.,at around 2015Hrs LT/ 03rd Dec 2019 Deck crane no. 1 Stevedore operator
complained the slow speed movement of crane no. 1 for both slewing and luffing operation.
Discharging of cargo in CH no.1 using deck crane no. 1 was stopped and engine hands investigate
the cause of slow movement of slewing and luffing operation.
Upon conducting troubleshooting measures as per maker’s technical advise, it was suspected that the
hydraulic oil pump for both luffing and slewing was not functioning well.
All of the above statements is true & correct to the best of my knowledge and abilities.
Attested By: