You are on page 1of 20

PROJECT: TWO-STOREY RESIDENCE

OWNER: ENGR. ROMEO DAVID


LOCATION: BLOCK 30, LOT 14, JASMINE STREET, TIERRA DE
STA. MARIA, PULONG BUHANGIN STA. MARIA,
BULACAN

PLATE NO. TITLE REMARKS


1 EARTHWORKS 2.0
2 CONCRETE WORKS 2.0
3 MASONRY WORKS 2.50

4 STEEL REINFORCEMENT 2.0

5 FORM & SCAFFOLDING 3.0

6 STEEL TRUSS 1.75


7 CARPENTRY WORKS 2.0
8 DOORS & WINDOWS 2.0

9 ROOFING MATERIALS 2.0

10 TILES WORKS 2.0


11 PAINT WORKS 2.0
12 ELECTRICAL WORKS 2.0
13 PLUMBING WORKS 2.0

I. EARTHWORKS
ACTUAL VOLUME 6.4m³

VOLUME OF EXCAVATION 34.267m³

VOLUME REQUIRED (-33.44 m³)

∴ NO NEED TO USE FILLING MATERIALS

II. VOLUME OF CONCRETE

VOLUME OF CONCRETE
C S
(m³) G
AA A B BAGS CU.M CU.M
1. FOOTING

FTG-1 2.304 20.736 1.152 2.304


FTG-2 6.760 60.84 3.38 6.760

FTG-3 3.528 31.752 1.764 3.528

2. FTB

FTB-1 2.24 20.16 1.12 2.24

FTB-1 3.20 28.80 1.60 3.20

3. COLUMN

C1 2.45 22.05 1.225 2.45

C2 5.71 51.39 2.855 5.71

C3 2.45 22.05 1.225 2.45

4. BEAM

RB1 3.84 26.88 1.92 3.84

B1 0.84 5.88 0.42 0.84

B2 0.72 5.04 0.36 0.72

B3 1.80 12.6 0.90 1.80

B4 0.50 3.5 0.25 0.50

5. SLAB

S1 0.48 4.32 0.24 0.48

S2 6.40 57.6 3.20 6.40

6. STAIR

FIRST 1.14 10.26 0.57 1.14

23
TOTAL 386 BAGS 45 CU.M
CU.M

BAGS OF CEMENT CUBIC METER CUBIC METER OF


PARTS
OF SAND GRAVEL
1. FOOTING 113.328 6.296 12.592
2. FTB 48.96 2.72 5.44
3. COLUMN 95.49 5.31 10.61
4. BEAM 69.3 3.85 7.70
5. SLAB 48.16 3.44 6.88
6. STAIR 10.26 0.57 1.14
TOTAL 385.498 22.186 44.362
FINAL TOTAL  386 BAGS  23 CU.M  45 CU.M
COST OF CONCRETE MATERIALS

MATERIAL UNIT COST TOTAL COST

386 BAGS CEMENT ₱259.00 ₱99,974.00

23 CU.M SAND ₱700.00 ₱16,100.00

45 CU.M GRAVEL ₱700.00 ₱31,500.00

TOTAL AMOUNT ₱147,574.00

III. MASONRY WORKS

PART WALL SIZE NO. OF CHB


EXTERIOR 6”x6” 1,393
FIRST FLOOR
INTERIOR 4”x4” 756
EXTERIOR 6”x6” 940
SECOND FLOOR
INTERIOR 4”x4” 772

NO. OF CHB

SIZE PCS
6”x6” CHB 2333
4”x4” CHB 1528
COST OF MASONRY MATERIALS

PCS SIZES UNIT PRICE TOTAL PRICE

2333 6”x6” ₱16.00 ₱37,328.00

1528 4”x4” ₱10.00 ₱15,280.00

TOTAL AMOUNT ₱52,608.00


IV. STEEL REINFORCEMENT

STEEL BAR
BUILDING PART (BY 6 METERS)
16mm 12mm 10mm
1. FOOTING 64 PCS
60 PCS 87 PCS
2. FTB
3. COLUMN 257 PCS 191 PCS

4. BEAM 120 PCS 50 PCS 146 PCS

5. SLAB 62 PCS 106 PCS

6. STAIRS 34 PCS

7. WALL 216 PCS


REINFORCEMENT

NO. OF STEEL BARS

16 MM  X 6 M 501 PCS

12 MM  X 6 M 112 PCS

10 MM  X 6 M 780 PCS

COST OF STEEL REINFORCEMENT

PCS SIZES UNIT PRICE TOTAL PRICE

501 16 MM  X 6 M ₱454.00 ₱227,454.00


112 12 MM  X 6 M ₱257.00 ₱28,784.00

780 10 MM  X 6 M ₱176.00 ₱137,280.00

TOTAL AMOUNT ₱393,518.00

V. FORM AND SCAFFOLDING


FORM

BUILDING PART ½” x 4” x 8
(MARINE PLYWOOD)

1. COLUMN 20 PCS
2. BEAM 31 PCS
3. SLAB 23 PCS

FRAME & SCAFFOLDING


BUILDING PART 2” x 2” x 12 2” x 3” x 12
(COCO LUMBER) (COCO LUMBER)
1. COLUMN 266 PCS
2. BEAM 248 PCS
3. SLAB 115 PCS

FORM AND SCAFFOLDING

½” x 4” x 8
74 PCS
(MARINE PLYWOOD)
2” x 2” x 12
248 PCS
(COCO LUMBER)
2” x 3” x 12
381 PCS
(COCO LUMBER)

COST OF FORM AND SCAFFOLDING

PCS SIZE TYPE UNIT COST TOTAL COST


74 ½” x 4” x 8 MARINE PLYWOOD ₱300.00 ₱22,200.00
248 2” x 2” x 12 COCO LUMBER ₱100.00 ₱24,800.00
381 2” x 3” x 12 COCO LUMBER ₱150.00 ₱57,150.00
TOTAL AMOUNT ₱136,500.00

VI. STEEL TRUSS

TRUSS PART ¼ x 2½L x 6m ¼ x 2L x 6m 2 x 3x 6m 2 x 4 x 6m

1. TOP CHORD 21 PCS

2. BOTTOM CHORD 9 PCS


3. VERTICAL
8 PCS
MEMBER
4. DIAGONAL
9 PCS
MEMBER
5. PURLINGS 43 PCS
6. FASCIA
15 PCS
BOARD
TOTAL 38 PCS 9 PCS 43 PCS 15 PCS

NO. OF STEEL TRUSS

¼x 2½L x6m 38 PCS

¼x 2Lx 6m 9 PCS

2x3x6m 43 PCS

2x4x6m 15 PCS

VII. CARPENTRY WORKS

COST OF STEEL TRUSS

PCS SIZES UNIT PRICE TOTAL PRICE

38 ¼x 2½L x6m ₱1,386.00 ₱52,668.00

9 ¼x 2Lx 6m ₱1,316.00 ₱11,844.00

43 2x3x6m ₱700.00 ₱30,100.00

15 2x4x6m ₱795 ₱11,925.00

TOTAL AMOUNT ₱106,537.00


COST OF CARPENTRY MATERIALS

PCS MATERIALS UNIT PRICE TOTAL PRICE

3/8” x 4ft. x 8ft.


22 ₱ 690.00 ₱15,180.00
Phenolic Boards

2x2x14
56 ₱360.00 ₱20,160.00
COCO LUMBER

TOTAL AMOUNT ₱35,340.00

VIII. DOORS AND WINDOWS

NO. OF UNIT
SIZES (M) TYPE TOTAL PRICE
MARK SET PRICE

DOUBLE
D1 1 1.60X2.4O ₱20,000 ₱20,000
PANEL

D2 2 1.00X2.10 PANEL ₱4,500 ₱9,000


DOUBLE
D3 1 1.60X2.10 ₱10,000 ₱10,000
SLIDING

D4 3 0.80X2.10 PANEL ₱4,000 ₱12,000

D5 3 0.70X2.10 PVC ₱3,000 ₱9,000

W1 2 1.00X1.10 SLIDING ₱2,000 ₱4,000

ALUMINUM
W2 1 1.00X1.00 ₱2,000 ₱2,000
CASEMENT

W3 6 0.50X0.50 AWNING ₱1,000 ₱6,000

FIXED
W4 1 1.00X1.00 ₱1,500 ₱1,500
GLASS

W5 3 1.50X1.10 SLIDING ₱2,500 ₱7,500

FIXED
W6 1 1.00X2.10 ₱3,000 ₱3,000
GLASS

FIXED
W7 2 0.50X1.80 ₱1,500 ₱3,000
GLASS

TOTAL AMOUNT ₱87,000.00


IX. ROOFING MATERIALS

ROOF AREA UNIT PRICE TOTAL AMOUNT

113 sq.
₱1,500.00 ₱169,500.00
meters

X. TILES WORKS

0.60 X 0.60 0.40 X 0.40 0.30 X 0.30


BUILDING PART
GLOSS TILES GLOSS TILES ROUGH TILES
1. KITCHEN (TABLE
9 PCS
TOP)
2. COMFORT ROOM
260 PCS
1ST FLOOR
3. LIVING AREA 61 PCS
4. DINING AREA 73 PCS
5. MASTER’S
61 PCS
BEDROOM
6. MASTER’ S
BEDROOM COMFORT 316 PCS
ROOM
6. BEDROOM 1 52 PCS
7.BEDROOM 2 69 PCS
8. COMFORT ROOM
316 PCS
2ND FLOOR
TOTAL 9 PCS 316 PCS 892 PCS

NO. OF TILES
0.60 X 0.60
9 PCS
GLOSS TILES
0.40 X 0.40
316 PCS
GLOSS TILES
0.30 X 0.30
892 PCS
ROUGH TILES

COST OF TILES WORKS


PCS SIZES TYPE UNIT PRICE TOTAL PRICE
0.60 X 0.60
9 GLOSS TILES ₱240.00 ₱2,160.00
0.40 X 0.40
316 GLOSS TILES ₱120.00 ₱37,920.00
0.30 X 0.30
892 ROUGH TILES ₱49.70 ₱44,332.30
MISCELLANEOUS FEE ₱8,441.23

TOTAL AMOUNT ₱92,853.53

XI. PAINTS WORKS

BUILDING PART PRIMACOAT SEMICOAT/GLOSS FLAT LATEX


(FIRST COATING) (SECOND COATING)

1. EXTERIOR WALL 6 GALLONS 5 GALLONS

2. FIRST FLOOR
4 GALLONS 3 GALLONS
(INTERIOR WALL)

3.SECOND FLOOR
5 GALLONS 5 GALLONS
(INTERIOR WALL)
4. FIRST FLOOR
3 GALLONS
CEILING

5. SECOND FLOOR
3 GALLONS
CEILING

TOTAL 15 GALLONS 13 GALLONS 6 GALLONS

GALLONS OF PAINT
PRIMACOAT
15 GALLONS
(FIRST COATING)
SEMICOAT/GLOSS
13 GALLONS
(SECOND COATING)
FLAT LATEX 6 GALLONS

COST OF PAINT WORKS


GALLONS TYPE UNIT PRICE TOTAL PRICE
PRIMACOAT
15 GALLONS ₱751.00 ₱11,265.00
(FIRST COATING)
SEMICOAT/GLOSS
13 GALLONS ₱480.00 ₱6,240.00
(SECOND COATING)
6 GALLONS FLAT LATEX ₱892.35 ₱5,354.10

MISCELLANEOUS FEE ₱2,285.90

TOTAL AMOUNT ₱25,144.00

XII. ELECTRICAL WORKS


A. OUTLET
MATERIAL UNIT TOTAL
PCS LOAD
DESCRIPTION PRICE PRICE
1 2500W REFRIGIRATOR OUTLET ₱600.00 ₱600.00
3 1500W AIRCON OUTLET ₱500.00 ₱1,500.00
15 200W CONVINIENCE OUTLET ₱150.00 ₱2,250.00
4 200W W.P. OUTLET ₱500.00 ₱2,000.00
CHANDELIER LIGHTING
1 240W ₱360.00 ₱360.00
OUTLET
22 200W LIGHTING OUTLET ₱250.00 ₱5,500.00
TOTAL ₱12,210.00

B. AMPERES

PCS AT UNIT PRICE TOTAL PRICE


4 30 AMP. ₱550.00 ₱2,200.00
42 20 AMP. ₱320.00 ₱13,440.00
TOTAL ₱15,640.00

C. WIRES

PCS NO. SIZE TYPE UNIT PRICE TOTAL PRICE


44 2 5.5m² THHN ₱36.59 ₱1,609.96
3 2 3.5m² THHN ₱23.33 ₱69.99
TOTAL ₱1,679.95

D. GROUND WIRES

PCS NO. SIZE TYPE UNIT PRICE TOTAL PRICE


4 1 3.5m² TW ₱30.00 ₱120.00

E. CONDUITS

PCS mm TYPE UNIT PRICE TOTAL PRICE


46 20 THHN ₱58.14 ₱2,674.44
TOTAL ₱2,674.44
COST OF ELECTRICAL MATERIALS

A. OUTLET ₱12,210.00

B. AMPERES ₱15,640.00

C. WIRES ₱1,679.95

D. GROUND WIRES ₱120.00

E. CONDUITS ₱2,674.44

TOTAL AMOUNT ₱32,324.39


XIII. PLUMBING WORKS

MATERIALS UNIT TOTAL


PCS
SPECIFICATION PRICE PRICE

7 75 mm x 50 mm TEE ₱80.00 ₱560.00

75 mm x 75 mm Y or
7
Tee
₱120.00 ₱840.00

4 75 mm - P-TRAP ₱700.00 ₱2,800.00

75 mm 90° LONG SWEEP


4
ELBOW
₱95.00 ₱380.00

A. HOUSE
DRAIN 75 mm X 3.00 M. PVC
4 ₱439.00 ₱1,756.00
PIPE

4 75 mm 1/8 BEND ₱50.00 ₱200.00

4 75 mm CLEAN OUT ₱114.00 ₱456.00

75 mm SOCKET OR
4 ₱95.00 ₱380.00
COUPLING

4 75 mm FLOOR DRAIN ₱276.00 ₱1,104.00

B. WASTE
AND VENT 7 ₱78.00 ₱546.00
50 mm x 50 mm TEE
PIPE
50 mm x 50 mm
4 ₱59.00 ₱236.00
ELBOW

50 mm x 3.00 M PVC
7 ₱299.00 ₱2,093.00
PIPE

UNIT TOTAL
PCS MATERIALS
PRICE PRICE
SPECIFICATION

12 mm (1/2”) ELBOW
WITH ONE FACE
10 ₱84.00 ₱756.00
THREADED (FOR
LAVATORY)

12 mm (1/2”) PLAIN
4 ₱40.00 ₱160.00
ELBOW

12 mm X 12 mm
7 ₱45.00 ₱315.00
PLAIN TEE

3 SHOWER VALVE ₱250.00 ₱750.00

C. WATER
SUPPLY 3 SHOWER HEAD ₱955.00 ₱2,865.00

12 mm (1/2”) TEE
4 END THREADED (FOR ₱65.00 ₱260.00
FAUCET

12 mm (1/2”) X
7 3.00 METERS PVC ₱60.00 ₱420.00
PIPE

110 GRAMS. SOLVENT


4 CEMENT ₱164.00 ₱656.00

12 mm (1/2”)
4 ₱500.00 ₱2,000.00
FAUCET
7 TEFLON TAPE ROLLS ₱8.00 ₱56.00
MATERIALS TOTAL
PCS UNIT PRICE
SPECIFICATION PRICE

SET WATER CLOSET


3 WITH FITTINGS AND ₱11,000.00 ₱33,000.00
ACCESSORIES

WATER CLOSET
3 ₱150.00 ₱450.00
CONTROL VALVE

10 mm (3/8) X 10
6 ₱282.00 ₱1,692.00
cm. NIPPLE

D.FIXTURES 12 MM (1/2") X 10
AND 3 MM (3/8) BUSHING ₱6.00 ₱18.00
ACCESORIES OR REDUCER

SET LAVATORY WITH


3 FAUCET AND P-TRAP ₱2500.00 ₱7,500.00
ACCESSORIES

LAVATORY CONTROL
3 ₱250.00 ₱750.00
VALVE
12 mm X 10 mm
3 BUSHING OR ₱6.00 ₱18.00
REDUCER
PLASTIC WATER
6 ₱200.00 ₱1,200.00
SUPPLY HOSE.

6 SOAP HOLDER ₱240.00 ₱1,400.00

E. OTHER PAPER HOLDER


3 ₱273.00 ₱819.00
ACCESSORIES
TOWEL BAR
6 ₱254.00 ₱1,524.00

3 FACE TOWEL HOLDER ₱379.00 ₱1,137.00

COST OF PLUMBING WORKS


A. HOUSE DRAIN ₱8,476.00

B. WASTE AND VENT PIPE ₱2,875.00

C. WATER SUPPLY ₱8,258.00

D.FIXTURES AND ACCESORIES ₱44,628.00

E. OTHER ACCESSORIES ₱4,880.00

F. MISCELLANEOUS ₱16,455.80

TOTAL AMOUNT ₱85,572.80

TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES


COLLEGE OF INDUSTRIAL TECHNOLOGY
CIVIL ENGINEERING TECHNOLOGY

CONSTRUCTION AND ESTIMATE


BILL OF MATERIALS
DIMAPILIS, PATRICK JAKE B. ENGR. ROMEO DAVID
BET-CT 2C CT213L

You might also like