You are on page 1of 1
Transmittal Sheet Project No. and Name: S08139 Haramain High Speed Rail Phase: P2 Engineer: DAR/DB! Employer: SRO Contractor: ASC GEES -«: paced Aislad io, Eneyumecomeratin ge [cce|| Menara (onan 9.12.2015, Transmittal No.:_ HHR2-TRM-ASC-DAR-1332-R05 ASC, Alvaro Senador-Gémez, Project Manager DBI, Frank Felten, Systems Manager ‘QGPS-SIGNALING CONSTRUCTION-METHOD STATEMENT DOCUMENTS FOR GYPSUM BOARDS: ‘Document Number Project sa Section/ Document Document relect_ | originator | Disciptine | SHOP! | Location | OPswme Stage cument | Revision HHR2 | asc | sig | GEN | GeN | PRO INS 0004 05 Document Name: Method of Statement Gypsum board Type of Document: Purpose of Submission: Document Review Record (For your information and records material Submittal For your review and comments Di sub-Contractor / Supplier Approval 8 For your approval Gi Request for inspection CD Retumed Site instruction Dothers: Drawing Submission Form: No. of Copies: Technical Document eo 1 DD Technical Query i minutes of Meeting Bi Hardeopy 2 Progress Report (Daily, Weekly, Monthly) Others: Method of Statement 1 Electric Copy cat Notes: ‘Signature Transmitter: Antonio Chaparro 2 WHR P2 Title: Document Controller (ne 49 DEC 2015 Conse ees SUBMITTED Contact Info: _antonio.chaparro@ineco.com TIME: Irfan Shareef ; DB Internatidnal GmbH Document Controller 8 Iniomational 40 DEG 20%5 Contact Into: _irfan.shareef@db-international.de RECE}|VED ‘Aroval shal at elave Conractr of slits unde the Conraet or constut aul Page 1 of 1 HHR2-ENG-GEN-S0-GEN-FOR-DES-011-00 HHR_20301_CO3_000_TRMTEMPLA.AOt

You might also like