Transmittal Sheet
Project No. and Name: S08139 Haramain High Speed Rail Phase: P2
Engineer: DAR/DB! Employer: SRO Contractor: ASC
GEES -«: paced Aislad
io, Eneyumecomeratin
ge [cce|| Menara (onan
9.12.2015, Transmittal No.:_ HHR2-TRM-ASC-DAR-1332-R05
ASC, Alvaro Senador-Gémez, Project Manager
DBI, Frank Felten, Systems Manager
‘QGPS-SIGNALING CONSTRUCTION-METHOD STATEMENT DOCUMENTS FOR GYPSUM
BOARDS:
‘Document Number
Project sa Section/ Document Document
relect_ | originator | Disciptine | SHOP! | Location | OPswme Stage cument | Revision
HHR2 | asc | sig | GEN | GeN | PRO INS 0004 05
Document Name: Method of Statement Gypsum board
Type of Document: Purpose of Submission:
Document Review Record (For your information and records
material Submittal For your review and comments
Di sub-Contractor / Supplier Approval 8 For your approval
Gi Request for inspection CD Retumed
Site instruction Dothers:
Drawing Submission Form: No. of Copies:
Technical Document eo 1
DD Technical Query
i minutes of Meeting Bi Hardeopy 2
Progress Report (Daily, Weekly, Monthly)
Others: Method of Statement 1 Electric Copy cat
Notes:
‘Signature
Transmitter: Antonio Chaparro 2 WHR P2
Title: Document Controller (ne 49 DEC 2015
Conse ees SUBMITTED
Contact Info: _antonio.chaparro@ineco.com TIME:
Irfan Shareef ;
DB Internatidnal GmbH
Document Controller
8 Iniomational 40 DEG 20%5
Contact Into: _irfan.shareef@db-international.de RECE}|VED
‘Aroval shal at elave Conractr of slits unde the Conraet or constut aul
Page 1 of 1
HHR2-ENG-GEN-S0-GEN-FOR-DES-011-00 HHR_20301_CO3_000_TRMTEMPLA.AOt