REMARKS

27000 ADD.PANTRY TABLE & CABINET


ADD. KICHEN ROOM

A
3 ADD. COUNTER TABLE 18000 4500 2700 1800
2
W W W W W W W W W W
1 1 1 1 1 1 1 1 1 1
ED CL1 CL1
CL2

NAP ROOM FEMALE

BS1
1 ABLUTION AC 2 PK AC 2 PK AC 2 PK AC 1 PK CL1 CL1

SV ROOM

1800

1800
(DRAWING LACK) CL1 CL1 CL2

PRYER ROOM

BS1

BS1
BS1

BS1
2700

2700

2700
CL1 CL1
CL2

BS1
KICHENETT FL+150 36 35
CL1 CL1

W CL1 CL2 ED
1 CH=2700 KICHENETT DRESING ROOM 1
34 33
CL1
ED

BS1
LARGE DESK
CL1
MALE

1800
1
(DRAWING CHECK) CL1

BS1
BS1

BS1
BS1
CL1
ED ED ED
2700 1
BS1 BS1 BS1 BS1
1
CL1
1
2700

2700
WASHER WITH DRYER ED 32 31
1800x6= 10800

1800
ADD. WINDOW 3
FL+150 1
STORAGE
MEETING CH=2700 W DRAWING ROOM KEY PLAN
1 AC 1 PK ROOM
ROOM 1

10800
CANTEEN EQUIPMENT ROOM
AC 2 PK

AC 2 PK
ED BS1 BS1 ED
FL+150 FL+150 FL+150 1 30 29 28 27 26 25 24 23 1
2 ED ADD.WOODEN PALET
CH=2700 CH=2700 CH=2700 22 21 20 19 18 17 16 15 ADD.TABLE

1800
3 1
500x3800 3
1 &WINDOW
2700

2700
MEETING ROOM 2 3

BS1
500 ED ED
SHOWER SHOWER OFFICE 400 1 1
TR1 FL-50 FL-50 FL+3000
CL3

BS1
ADD.DOOR
CL3

CH=2700 CH=2700

WOODEN SLEPPER
CH=2700 CL3

TABLE

1800
W

BS1
TR1
ED 1 CL3

14 13 12 11 10 9 8 38 37

3600
1 CL3

1 7 6 5 4 3 2 1 37 39 CL3
MEETING MEETING
2700

2700
TR1 STORAGE ROOM ROOM 3A ROOM 3B
ENTRANCE CL3

FL+150
SR

CL3

ED ED TR1 CH=2700 AC 2 PK AC 2 PK AC 2 PK CL3


ED AC 2 PK ED SR
ED AC 1 PK AC 1 PK
1 1 1 2 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 CL3
1
W W W W W W W W W W W W W W
DOWN 2

1800
1800

1 1 1 1 1 1 1 1 1 1 1 1 WOODEN 1 1
PALLET ADD. AC
3 CHANGE DOOR POSITION ADD. EPS WALL
SD SD ADD. POLYCARBONATE AT HANDRAIL
3 3 3
18000 3600 5400
SD SD
3 3
27000
DRAWING REVISION
ADD.WOODEN PALLET
1800 1200 1200 1800
1800 x 1800
6000
A

7200 4500 6300 5400 3600


1800x15= 27000 1500
28500

2
2ND FLOOR PLAN 1:150

TRUSS : LIGHT WEIGHT STEEL


ADD. POLYCARBONATE AT HANDRAIL ROOF : ZINC CORRUGATED
1ST FLOOR PLAN 1:150 500 10800
W/ INSULATION
500
ROOF

ROOF : ZINC CORRUGATED FFL + 7.168


CONCRETE SLAB COLUMN: HOLLOW 75x75x3.2

1468
2400
K250 T=150
CEILING M8 SINGGLE
FFL + 5.700
DYNABOLT 4xM20
CH+2700

CEILING:PLYWOOD T.4MM

2700

100 150
LISPLANK 250xT.4MM W/ PAINT

7168
FLOOR: PANEL
FFL+3.000
2 FL
FFL + 3.000
EPS PANEL SAND T=100
MODULE 1800 CH+2700 CEILING:PLYWOOD T.4MM 3 AS PER MARK
SECTION 1 1:30 1

3000
W/ PAINT
2 AS PER MARK
FLOOR: CONCRETE T=200 W/
BASE COURSE T=100 1 AS PER MARK
1 FL Rev. DESCRIPTION DATE

500 PROJECT TITLE


1 1
DRAINAGE:OPEN CUT SOIL
10800 1800 250 PT. MC PET FILM INDONESIA
APRON: CONCRETE T=50 Jl. Raya Merak, Kelurahan Gerem, Kec.
STEEL ANCHOR 4xM16
Grogol Kota Cilegon, Banten 42438,
27000 EPS DOUBLE DOOR COLUMN: HOLLOW 75x75x3.2 Indonesia
W1800xh2100 WITH CLEAR
EPS PANEL WINDOW EPS PANEL GLASS T.6MM

500
250
EPS DOOR W800xh2100
1200x1000 CLEAR GLASS MODULE 1800
WITH CLEAR GLASS T.6MM
MAIN CONTRACTOR

SECTION A 1:150
ELEVATION 2 1:150 PLAN F1 1:30
ROOF : ZINC CORRUGATED ROOF : ZINC CORRUGATED SHOP DRAWING
W/ INSULATION W/ INSULATION
CONCRETE SLAB DRAWING TITLE
LISPLANK 250xT.4MM LISPLANK 250xT.4MM
K250 T=150 50
ROOF : ZINC CORRUGATED ROOF : ZINC CORRUGATED M8 SINGGLE WALL: EPS PANEL t=50
TEMPORARY

FLOOR
CONCRETE SLAB FLOOR FINISH OWNER OFFICE
K250 T=100
EPS PANEL Scale Date
M8 SINGGLE 1:150(A3)
VINYL SHEET

100 150
MODULE 1800
EPS PANEL

250
EXISTING SOIL 11/06/19
Draftman

100 100
MODULE 1800 -250
Check Date

PLASTIC SHEET
SAND T.100
STEEL TROWEL Architect
Civil Engineer
3150

3150

M/E Enginner
EXISTING SOIL
-250
EXISTING SOIL
-250
CERAMIC TILE Approval Date
Project Manager

10800 1800 DRAINAGE:OPEN CUT SOIL 1800 10800 DRAINAGE:OPEN CUT SOIL GROUND BEAM 1:30 1 Consultant

DRAINAGE:OPEN CUT SOIL Owner


DRAINAGE:OPEN CUT SOIL
Drawing No. Rev. No.

ELEVATION 1 1:150 ELEVATION 3 1:150


MFI-T-1 03

You might also like