FCC MEC BW L3 003 Layout1
FCC MEC BW L3 003 Layout1
All service routes and equipment locations and indicative, actual location to be determined from site
dimensions.
1 2 5 6 8 9
KEF-02 KEF-01
CHILLER -02 (16232 Kg) (100 Kg) (50 Kg)
-+
-+
-+
-+
MAHU-01 (251 Kg)
R2
PEF-01 & 02 (100 Kg EACH)
5000
R1
5000
30 (Kg)
10000
+
-
Q2
AHU-02 (456 Kg)
+
-
-
+
+
10000
-+
AHU-05 (304 Kg) AHU-04 (304 Kg)
Q
RO TREATMENT PLANT
TANKS
DRAWING STATUS
DETAILED DESIGN
CLIENT
TBWP-01
+ BWP-01 BWP-02
-
TANKS
TANKS
TANKS
20000
TEF-01
P
+
-
10000
STRUCTURAL CONSULTANT
N2
AHU-06 (217 Kg)
+
-
MEP CONSULTANT
+
-
10000
FIRST CITI-CONSULT,
P.O. BOX 43119,
ABELA BLDG., MEZZANINE FLOOR, KHALIDIYA STREET,
ABU DHABI, UNITED ARAB EMIRATES.
OFFICES ALSO: LONDON / ABU DHABI / DUBAI
ACOUSTIC
N
AHU-07 (196 Kg)
+
-
AHU-01
-
(416 Kg)
+
LOCAL ARCHITECT
MAHU-02 (251 Kg)
-+
-+
+
PROJECT
-
MUVI CINEMA
AHU-08 (196 Kg)
KEF-03
(100 Kg)
MALL OF DHAHRAN, DAMMAM
KSA
DRAWING TITLE
1 2 5 6 8 9
DRAWING NUMBER