NAME OF WORK Rehabilitation & Upgradation of Newly NH-548E (old SH-74 & Old SH-141) Mhaswad-Piliv-Pandha
of old SH-15 (on T-junction of Old SH-74 & old Sh-15, Pandharpur)(Design Km 0.000 to Km 53.080
Client Maharashtra State Road Development corporation Ltd (MSRDC).
Authority engineer STUP Consultant (pvt) ltd.
contractor Roadway Solution India Pvt.Ltd. BOX CULVERT Chainage - 10/521
Drawing no. RIE/RSIPL/MPP/MNB/SUP/CH-16322/005/SHEET-1- R1 & SHEET-2R1
ABUTMENT WALL
0.15
0.15
1 2.42 Top slab bar
0.2 8
Top slab
0.15
0.15
2 2.42 bottom bar
0.2 10
Top slab
2a 1.40 bottom bar
0.2 8
0.750
3 corner bar
0.970 0.2 10
0.300
4 0.71 Haunch bar
0.300 0.1 8
Distribution
5 10.90 top slab bar
0.2 8
Distribution
6 10.90 top slab bar
0.2 8
0 side wall
0.170
7 2.41 vertical
outerface bar 0.2 10
0 side wall
0.170
8 2.41 vertical
innerface bar 0.2 10
1.200
8a innerface bar
1
bottom corner
0.750
9 bar
0.2 10
Distribution
10 10.90 bottom slab
top bar
0.2 8
Distribution
11 10.90 bottom slab
bottom bar 0.2 8
0.300
12 0.71 Haunch bar
0.300 0.2 8
0.150
13 2.42
0.150 0.2 10
13a 1.40
0.2 10
0
14 2.42 0.150
0.15 10
15 2.42
0.15 8
0
16 2.42 0.15
10
3
0.500
17 3 LAYERS
10
0
3.464
18 0.30
10
OUTER FACE
19 BAR
0.15 10
EARTH FACE
20 BAR
0.2 8
EARTH FACE
21 BAR
0.15 10
EARTH FACE
21a BAR
0.15 10
EARTH FACE
22 BAR
0.2 8
EARTH FACE
23 BAR
0.15 10
NDING SCHEDULE for BOX CULVERT 10+521
SH-141) Mhaswad-Piliv-Pandharpur (NH 965) from Existing Km 88/200 of old SH-74 (on T junction with old SH-74 & Old SH-77
)(Design Km 0.000 to Km 53.080 ) to lane with paved shoulder in the state of Maharashtra on Engineer, Procurement & constructi
Bend
Lap Length No. of No of Correcti Cutting Total Unit Wt.
Length bars Bends Length Length
on
0.39
10.92 2.72 109 2 0.096 2.624 286.541
0.620
10.92 2.72 109 1 0.060 2.660 290.472
0.39
10.92 1.40 109 2 0.048 1.352 147.638
0.620
10.92 1.72 109 - 1.720 187.824
0.39
1.50 8.983 1.31 180 - 2.812 505.204
0.39
8.0962 10.90 81 - 10.900 882.486
0.39
10.90 3,120 2 0.048 10.852 33858.2
0.620
10.92 2.75 109 1 0.030 2.720 297.024
0.620
10.92 2.75 109 4 0.120 2.630 287.196
0.620
10.92 1.70 109 2 0.060 1.640 179.088
0.39
2.41 10.90 24 1 0.024 10.876 262.112
0.39
0.80 1.9 10.90 19 - 11.700 222.3
0.39
0.80 1.31 4 2 0.048 2.059 8.2364
0.620
0.00 10.92 2.72 109 2 0.060 2.660 290.472
0.620
0.80 2.69 1.40 27 - 2.200 59.18
0.888
15.92 2.72 212 - 2.720 577.365
0.39
15.92 2.42 212 - 2.420 513.685
0.620
0.80 2.72 10 - 3.520 35.2
0.620
3.50 40 4 0.120 3.380 135.2
4.06
0.620
1.8 0.00 48 1 0.030 -0.030 61.581
0.39
0.00 - 0 - 176.4
0.620
3.325 0.00 89 2 0.060 -0.060 -5.32
0.620
1.8 9.19 28 1 0.030 9.160 256.48
0.39
9.19 - 176.4
0.620
1.33 9.19 35 1 0.030 9.160 324.875
0.00 Total Wt In KG
nction with old SH-74 & Old SH-77 SUMMARY OF REINFORCEMENT STEEL
n Engineer, Procurement & construction (EPC) Basis Contract
T8 T10 T12 T16 T20 T25
180.09264 - - - - - -
116.45088 - - - - -
197.0295288 197.03 - - - - -
344.169462 344.17 - - - - -
13204.7136 ### - - - - -
184.15488 - 178.06 - - - -
178.06152 - - - - - -
111.03456 - - - - - -
102.223524 102.22 - - - -
86.697 86.70 - - - - -
3.212196 3.21 - - - - -
180.09264 - 180.09 - - - -
36.6916 - 36.69 - - - -
512.700416 - - - - -
200.33728 200.34 - - - -
21.824 - 21.82 - - - -
83.824 - 83.82 - - - -
38.18022 - 38.18 - - - -
68.796 -
-3.2984 -
159.0176 159.02
68.796 -
201.4222933 - 201.42 - - - -
16,445.55 ### 1,195.66 - - - -
T32
Total
0.00 ###
32mm
-
-
-
-