INSPECTIONS AND TESTING

The contractor shall perform the following tests in presence of the authorized inspectors appointed
by the Engineer. The tests and test procedures shall be approved by the Engineer. No part of the
work shall be considered acceptable until it has successfully complied with these tests to the
satisfaction of the Engineer. Test records, data, calculation sheets and photographs, if any, shall be
submitted to the Engineer in two copies within two weeks after test had been conducted.