Team MCPL visited H-Energy’s site in Kukrahati, Kolkata on
25/9/2019 along with Team H-Energy. Full plot – 6.3m approx above MSL (approx 3m filling – need to propose retaining structure around boundary wall) 530 m shore line on which shore protection system detail design needs to be submitted High tide line ends at about 5.9m where we need to start protective layer Material for filling, shore protection & boundary retaining structure – need detailed design drawings Onshore additional loads – Buildings, Load of materials from L & G ships, Road load, Moving loads. NOTE : Tanks will be on pile, truck data sent (need to procure loads) Shore protection – 15 to 30m wide Correction - add 282 m on level to get chart datum Chart datum better as marine facilities will automatically get taken care of Road to shore length – 400 m Sheet pile + boulders for slope tide protection plausible? Retaining structure upto 9m approx (filling depth), above which wall will only act as boundary wall EPC contractor who will come later will break/make boundary wall if required CSV – Global / Jet co-ordinates – soft copy required by MCPL Good bearing sand only below 60m Local source for sandy clay? Same for murrum Make cost comparisons of all potential materials Fly ash – easily available (cheap & available 20 Km / 55 Km) (bottom bed ash is preferred) 500 x 480 x 2.5 5,00,000 m3 of filling Have to level ground first (prevents differential settlement) Surveyor assessment – Removal of trees / shrubs / vegetation/ Chimney demolition Road & drain will be all around boundary wall (can this help in reducing retention surcharge?) Building plinth level w.r.t. outside road level ? (even 40 to 50 cm makes a big difference.) Localized strengthening is possible in case load is higher in certain areas Kick off meeting required